Meta Aiken

Meta's AI campus in Aiken County. It draws about 129 MW today and is planned to reach 168 MW by November 2026.

Power now129 MWAs of Nov 5, 2026
Planned peak168 MWNovember 2026
Compute147kH100-equivalent chips now
Capital cost$4.9BSo far, 2025 dollars

Latest look · Nov 5, 2026

What the satellite shows

Building 2 is operational assuming a 3 month lag compared to Building 1.

Build-out

Power, month by month

0 MW50 MW100 MW150 MW200 MW20252026Today
Power drawn by Meta Aiken, from Epoch AI's dated observations.
0 MW50 MW100 MW150 MW200 MW20252026Today
Power drawn by Meta Aiken, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Chips
B300
Water use
0.00 million gallons a day (Epoch AI estimate)
Address
7601 State Hwy 105, Trenton, SC 29847, USA
County
Aiken County (approximate)

Where

On the map of South Carolina

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of Aiken, as no address could be matched, so the dot and the county are approximate.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Urquhart● Natural gas759 MW12.6 mi
Shaw Creek Solar, LLC● Solar75 MW10 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Nov 5, 2026Building 2 is operational assuming a 3 month lag compared to Building 1.168 MW
Aug 7, 2026Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.90 MW
Apr 8, 2026Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation.–
May 30, 2024Land clearing begins–

How much power does Meta Aiken use?

About 129 MW as of Nov 5, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 168 MW in its build plans by November 2026. Running all year, 129 MW would use about 1.1 TWh.

Who owns Meta Aiken?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Aiken?

In Aiken County, the average customer is without power about 22 hours in a typical year in this site's outage record, with 9 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Aiken?

2 plants within 15 miles total about 834 MW; the largest is Urquhart (759 MW, natural gas), 12.6 miles away. Nearness does not mean it supplies the campus.