Guide · The grid
Data centers and the grid
US electricity use is climbing, and the grid's regulators say new data centers for artificial intelligence are the biggest reason. Here are the numbers, from Berkeley Lab, EIA and NERC.
How much they use
Berkeley Lab's December 2024 report for the Department of Energy found data centers used about 4.4% of US electricity in 2023, and projected 325 to 580 terawatt-hours by 2028: between 6.7% and 12% of the country's electricity. EIA estimates servers alone used about 7% of commercial-sector electricity in 2025.
Where demand is growing
By EIA's hourly grid data, the US as a whole used 7% more electricity in 2025 than in 2019. Texas's grid, ERCOT, used 27% more (384 to 487 TWh), among the fastest-growing large grids in the country. Not all of that is data centers; the state's population and industry are growing too. See every grid operator ranked on surging demand.
The reliability risk
NERC, which oversees grid reliability, said in its January 2026 long-term assessment that new data centers for artificial intelligence and the digital economy account for most of the projected increase in North American electricity demand over the next ten years, with summer peak demand forecast to rise by over 224 GW, and that projected resource and transmission growth lags what is needed. It rated PJM, the Mid-Atlantic grid, at elevated risk for 2026–2028 and high risk from 2029, "driven primarily by data centers".
For this winter, NERC named Texas among seven areas that could run short in extreme cold, citing strong load growth from new data centers and other large industrial users. See the winter outlook.
Bills
Who pays for the plants and wires new demand requires is decided utility by utility and state by state. The average US residential price was 17.23 cents per kWh in 2025, up from 16.48 in 2024 (EIA); see your state on electric bills.
Questions
Quick answers
How much electricity do data centers use?
About 4.4% of all US electricity in 2023, 176 terawatt-hours, up from 58 TWh in 2014, by Lawrence Berkeley National Laboratory's December 2024 report for the Department of Energy. It projected 325 to 580 TWh by 2028, 6.7% to 12% of US electricity.
Are data centers causing blackouts?
Not directly so far, but grid regulators say they are tightening the margin. NERC's 2025–2026 winter assessment said strong load growth from data centers is driving Texas demand forecasts and contributing to the risk of supply shortfalls, and its long-term assessment rates PJM at elevated risk from 2026 and high risk from 2029, driven primarily by data centers.
Which grids are growing fastest?
Across US grid operators with 10 TWh or more a year, ERCOT (Texas) used 27% more electricity in 2025 than in 2019, against 7% for the US as a whole, by EIA's hourly grid data.
Will data centers raise my electric bill?
That depends on how each utility and regulator assigns the cost of new plants and wires. The average US residential price rose from 16.48 cents per kWh in 2024 to 17.23 in 2025 (EIA); prices in your state are on the electric bills page.
Sources
Where this comes from
- Berkeley Lab, 2024 United States Data Center Energy Usage Report (LBNL-2001637)
- US Department of Energy, DOE releases new report evaluating increase in electricity demand from data centers (December 2024)
- EIA, servers' share of commercial electricity (May 2026)
- NERC, 2025 Long-Term Reliability Assessment (January 2026)
- NERC, 2025–2026 Winter Reliability Assessment
- EIA-930 hourly electric grid monitor (via Power Out Map's demand data)