Data centers · every state
Every data center in America
2,955 operating data center sites, 930 more planned or under construction, and 77 frontier AI campuses that alone draw about 12.6 GW today and plan for 43.4 GW. Where they are, who runs them, what they draw, and the power prices and outage record around them.
The map
Where the data centers are
Diamonds are projects in development. Where a project gives no location it sits at the centre of its city or county.
AI campuses
The biggest AI data centers
Power is the whole facility's draw estimated by Epoch AI from satellite images, permits and filings. "Planned" is the highest point in its build timeline. Sort by any column.
| Campus | Owner | Where | Now | Planned | First power |
|---|---|---|---|---|---|
| Anthropic-Amazon New Carlisle | Amazon | New Carlisle, IN | 1.0 GW | 2.3 GW | June 2025 |
| Colossus 2 | SpaceXAI | Memphis, TN | 946 MW | 2.1 GW | October 2025 |
| OpenAI Stargate Abilene | Oracle | Abilene, TX | 824 MW | 1.2 GW | September 2025 |
| Microsoft Fairwater Atlanta | Microsoft | Fayetteville, GA | 636 MW | 859 MW | October 2025 |
| Meta Prometheus | Meta | New Albany, OH | 471 MW | 1.3 GW | October 2025 |
| Microsoft Fairwater Wisconsin | Microsoft | Mount Pleasant, WI | 369 MW | 2.7 GW | April 2026 |
| Google Pryor (North) | Pryor, OK | 368 MW | 442 MW | July 2024 | |
| Colossus 1 | SpaceXAI | Memphis, TN | 340 MW | 442 MW | August 2024 |
| Google New Albany | New Albany, OH | 333 MW | 400 MW | April 2024 | |
| Google Columbus | Columbus, OH | 303 MW | 464 MW | April 2024 | |
| Amazon Madison Mega Site | Amazon | Canton, MS | 284 MW | 819 MW | June 2025 |
| CoreWeave Denton TX | CoreWeave | Denton, TX | 262 MW | 395 MW | May 2025 |
| QTS Richmond 1 | – | Sandston, VA | 238 MW | 333 MW | January 2024 |
| Google Bristow | Bristow, VA | 238 MW | 286 MW | April 2024 | |
| Google Omaha | Omaha, NE | 237 MW | 474 MW | April 2024 | |
| Google Council Bluffs (East) | Council Bluffs, IA | 237 MW | 284 MW | November 2024 | |
| Google Papillion | Papillion, NE | 237 MW | 284 MW | January 2023 | |
| Amazon Ridgeland | Amazon | Ridgeland, MS | 228 MW | 1.0 GW | May 2026 |
| AWS New Albany | Amazon | New Albany, OH | 213 MW | 405 MW | December 2024 |
| Anthropic Lake Mariner | AI XPV Platform | Barker, NY | 210 MW | 441 MW | May 2026 |
| Microsoft Goodyear | Microsoft | Goodyear, AZ | 202 MW | 263 MW | April 2023 |
| Microsoft Project Osmium | Microsoft | Cumming, IA | 190 MW | 228 MW | January 2021 |
| Google Mesa | Mesa, AZ | 183 MW | 237 MW | July 2025 | |
| QTS Richmond 2 | – | Sandston, VA | 180 MW | 252 MW | February 2025 |
| Meta-QTS Hillsboro 2 | Meta | Hillsboro, OR | 180 MW | 243 MW | August 2023 |
| Meta Rosemount | Meta | Rosemount, MN | 178 MW | 241 MW | June 2026 |
| Meta Jeffersonville | Meta | Jeffersonville, IN | 178 MW | 241 MW | June 2026 |
| Meta Temple | Meta | Temple, TX | 178 MW | 231 MW | December 2025 |
| Google Storey County | Clark, NV | 161 MW | 389 MW | August 2023 | |
| Google The Dalles | The Dalles, OR | 154 MW | 185 MW | March 2025 | |
| Meta Montgomery | Meta | Montgomery, AL | 153 MW | 465 MW | June 2026 |
| Meta Cheyenne | Meta | Cheyenne, WY | 152 MW | 249 MW | July 2026 |
| Meta Kuna | Meta | Kuna, ID | 152 MW | 198 MW | June 2026 |
| Meta Huntsville | Meta | Huntsville, AL | 146 MW | 198 MW | March 2026 |
| QTS Richmond 3 | – | Sandston, VA | 144 MW | 336 MW | February 2026 |
| Google Lincoln | Lincoln, NE | 141 MW | 339 MW | May 2026 | |
| Google Lancaster | Lancaster, OH | 137 MW | 164 MW | January 2024 | |
| Meta Eagle Mountain | Meta | Eagle Mountain, UT | 133 MW | 179 MW | December 2025 |
| Coreweave Helios | CoreWeave | Afton, TX | 132 MW | 800 MW | August 2026 |
| Meta Aiken | Meta | Aiken, SC | 129 MW | 168 MW | August 2026 |
| Meta Los Lunas | Meta | Los Lunas, NM | 118 MW | 273 MW | March 2026 |
| AWS Berwick | Amazon | Berwick, PA | 108 MW | 212 MW | September 2025 |
| Google Kansas City East | Kansas City, MO | 105 MW | 126 MW | August 2026 | |
| Google Midlothian | Midlothian, TX | 103 MW | 123 MW | April 2026 | |
| Meta Gallatin | Meta | Gallatin, TN | 87 MW | 114 MW | August 2026 |
| STACK Infrastructure NVA02 | – | Manassas, VA | 85 MW | 487 MW | October 2024 |
| CoreWeave Chester VA | CoreWeave | Chester, VA | 82 MW | 197 MW | January 2024 |
| Meta Sarpy | Meta | Springfield, NE | 80 MW | 105 MW | August 2026 |
| Google Red Oak | Red Oak, TX | 77 MW | 185 MW | August 2025 | |
| Google Arcola | Arcola, VA | 77 MW | 93 MW | June 2026 | |
| Microsoft SAT40 | Microsoft | San Antonio, TX | 75 MW | 106 MW | May 2024 |
| CoreWeave Ellendale ND | CoreWeave | Ellendale, ND | 68 MW | 520 MW | October 2025 |
| CoreWeave Marble NC | CoreWeave | Marble, NC | 65 MW | 91 MW | March 2026 |
| Stream Phoenix | – | Goodyear, AZ | 64 MW | 267 MW | May 2026 |
| Core42 Lake Mariner | Core42 | Barker, NY | 58 MW | 58 MW | October 2025 |
| Microsoft-Nebius New Jersey | Nebius | Vineland, NJ | 50 MW | 70 MW | April 2026 |
| Microsoft SAT14 | Microsoft | San Antonio, TX | 47 MW | 66 MW | July 2024 |
| Vantage TX1 | – | San Antonio, TX | 32 MW | 179 MW | February 2026 |
| CoreWeave Dalton 1 & 2 | CoreWeave | Dalton, GA | 28 MW | 40 MW | February 2026 |
| xAI QTS Atlanta | SpaceXAI | Atlanta, GA | 17 MW | 24 MW | February 2025 |
| OpenAI Stargate New Mexico | Oracle | Santa Teresa, NM | – | 2.5 GW | December 2028 |
| Meta Hyperion | Meta | Holly Ridge, LA | – | 2.2 GW | January 2028 |
| OpenAI Stargate Shackelford | Oracle | Abilene, TX | – | 2.0 GW | August 2027 |
| QTS Cedar Rapids | Meta | Cedar Rapids, IA | – | 1.6 GW | December 2026 |
| OpenAI Stargate Michigan | Oracle | Benton, MI | – | 1.4 GW | December 2028 |
| OpenAI Stargate Wisconsin | Oracle | Port Washington, WI | – | 1.3 GW | December 2028 |
| Goodnight | Claude, TX | – | 1.3 GW | March 2027 | |
| OpenAI Stargate Milam | Softbank | Burlington, TX | – | 1.2 GW | December 2028 |
| Google Fort Wayne | Fort Wayne, IN | – | 1.0 GW | December 2026 | |
| Crusoe Abilene Expansion | Microsoft | Abilene, TX | – | 941 MW | September 2027 |
| Meta Bowling Green | Meta | Bowling Green, OH | – | 570 MW | February 2027 |
| QTS Eagle Mountain | Meta | Eagle Mountain, UT | – | 411 MW | December 2026 |
| Google Cedar Rapids | Cedar Rapids, IA | – | 314 MW | December 2026 | |
| Anthropic Barber Lake | Cipher Mining | Colorado City, TX | – | 300 MW | December 2026 |
| OpenAI Stargate Lordstown | Softbank | Lordstown, OH | – | 300 MW | March 2027 |
| CoreWeave Muskogee OK | CoreWeave | Muskogee, OK | – | 181 MW | December 2026 |
| CoreWeave Lancaster Greenfield site | CoreWeave | Lancaster, PA | – | 124 MW | June 2027 |
The build-out
How fast AI power is growing
The pipeline
The biggest projects on the way
Planned and under-construction projects that publish a size, from Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists (AI campuses Epoch AI tracks are above). Size is the developer's announced figure, often a full build-out over many years, and not every announced project gets built.
| Project | Developer | State | Status | Announced size |
|---|---|---|---|---|
| New Era Energy Lea County AI Hub | New Era Energy & Digital | NM | Planned | 7.0 GW |
| Homer City Energy Campus | Homer City Redevelopment | PA | Planned | 4.5 GW |
| High Performance Compute Data Center Campus | Joule Capital Partners | UT | Under construction | 4.0 GW |
| DCIP DeSoto County AI Data Center | DCIP Group | FL | Planned | 4.0 GW |
| Project Camellia (OpenAI) | OpenAI | GA | Planned | 3.2 GW |
| Sailfish Comanche Circle | Sailfish Digital Ventures | TX | Planned | 3.2 GW |
| TECfusions Keystone Connect | TECfusions | PA | Planned | 3.0 GW |
| Crusoe WY Campus | Tallgrass (Project Jade; Crusoe exited Jun 2026) | WY | Planned | 2.7 GW |
| North Creek Tech Campus | Amazon | VA | Planned | 2.7 GW |
| Shippingport Power Station and Data Center | Frontier Group of Companies | PA | Planned | 2.7 GW |
| Adams Fork Data Center Energy Campus - Harless Site | TransGas Development Systems LLC | WV | Planned | 2.4 GW |
| Amazon Web Services (AWS) Hobart Tech Park | Amazon Web Services | IN | Planned | 2.4 GW |
| Mason County Technology Campus | Fortune 100 Company (undisclosed) | KY | Planned | 2.2 GW |
| Birchwood AWS | Amazon | VA | Planned | 2.2 GW |
| George Washington Village Data Center | Garrett Development Corporation | VA | Planned | 2.1 GW |
| MACROHARDRR Data Center | xAI | MS | Under construction | 2.0 GW |
| Delta Gigasite | Creekstone Energy (formerly Fibernet MercuryDelta) | UT | Planned | 2.0 GW |
| LandBridge / PowerBridge Alpha Digital Data Center Campus | LandBridge | TX | Planned | 2.0 GW |
| Potentia Oklahoma Campus 02 | Potentia Inc. | OK | Planned | 2.0 GW |
| Richland Parish Data Center (Project Sucre) | Meta | LA | Planned | 2.0 GW |
| Tract Austin | Tract | TX | Planned | 2.0 GW |
| xAI Colossus | xAI | TN | Planned | 2.0 GW |
| EdgeConneX Ashville Data Center Campus | EdgeConneX | OH | Planned | 1.8 GW |
| Joliet Technology Center | Hillwood | IL | Planned | 1.8 GW |
| Project Cardinal Data Center | Pioneer Development | IL | Planned | 1.8 GW |
Cancelled
Projects that were dropped
109 projects recorded as cancelled or withdrawn, often after local opposition, a zoning vote or a developer pulling out.
By state
Data centers by state
Household price: the average residential cents per kWh in 2025 and the change since 2018 (EIA-861). It sits beside the data centers for context; prices move with fuel costs, storms and wires spending too.
| State | Sites | Being built | Planned | Local bans | AI campuses | AI power now | AI planned | Home price | Since 2018 |
|---|---|---|---|---|---|---|---|---|---|
| Virginia | 435 | 26 | 121 | 11 | 7 | 1.0 GW | 2.0 GW | 15.3¢ | +30% |
| Texas | 406 | 56 | 65 | 10 | 14 | 1.7 GW | 8.9 GW | 15.4¢ | +38% |
| California | 236 | 10 | 12 | 21 | – | – | – | 31.4¢ | +66% |
| Oregon | 147 | 3 | 6 | 3 | 2 | 334 MW | 428 MW | 15.5¢ | +41% |
| Ohio | 130 | 16 | 22 | 55 | 7 | 1.5 GW | 3.6 GW | 16.9¢ | +35% |
| Arizona | 110 | 9 | 17 | 2 | 3 | 449 MW | 767 MW | 15.3¢ | +20% |
| Illinois | 107 | 12 | 22 | 14 | – | – | – | 17.7¢ | +38% |
| Georgia | 103 | 14 | 69 | 32 | 3 | 681 MW | 923 MW | 14.7¢ | +29% |
| New Jersey | 93 | 3 | 6 | 73 | 1 | 50 MW | 70 MW | 22.5¢ | +46% |
| Washington | 90 | 5 | 5 | 19 | – | – | – | 13.2¢ | +35% |
| Iowa | 79 | 2 | 14 | 16 | 4 | 427 MW | 2.4 GW | 13.6¢ | +11% |
| Pennsylvania | 73 | 2 | 44 | 11 | 2 | 108 MW | 336 MW | 19.3¢ | +39% |
| New York | 67 | 2 | 17 | 13 | 2 | 268 MW | 499 MW | 26.4¢ | +42% |
| Colorado | 65 | 4 | 5 | 13 | – | – | – | 15.7¢ | +29% |
| Florida | 65 | 3 | 12 | 26 | – | – | – | 15.2¢ | +32% |
| North Carolina | 61 | 6 | 12 | 38 | 1 | 65 MW | 91 MW | 14.0¢ | +26% |
| Nevada | 50 | 5 | 9 | 8 | 1 | 161 MW | 389 MW | 13.3¢ | +12% |
| Missouri | 48 | 5 | 10 | 17 | 1 | 105 MW | 126 MW | 13.3¢ | +17% |
| Minnesota | 42 | 2 | 16 | 18 | 1 | 178 MW | 241 MW | 15.8¢ | +20% |
| Utah | 41 | 4 | 14 | 8 | 2 | 133 MW | 590 MW | 13.0¢ | +25% |
| Indiana | 39 | 7 | 23 | 21 | 3 | 1.2 GW | 3.6 GW | 16.0¢ | +30% |
| Tennessee | 39 | 4 | 5 | 25 | 3 | 1.4 GW | 2.6 GW | 13.2¢ | +23% |
| Nebraska | 36 | 2 | 1 | 16 | 4 | 695 MW | 1.2 GW | 12.1¢ | +13% |
| Michigan | 33 | – | 17 | 53 | 1 | – | 1.4 GW | 20.0¢ | +30% |
| Wyoming | 30 | 1 | 4 | – | 1 | 152 MW | 249 MW | 13.4¢ | +18% |
| Massachusetts | 29 | – | 3 | 6 | – | – | – | 30.4¢ | +41% |
| New Mexico | 28 | 1 | 3 | 4 | 2 | 118 MW | 2.7 GW | 14.8¢ | +17% |
| Maryland | 26 | 3 | 9 | 19 | – | – | – | 19.5¢ | +47% |
| Mississippi | 23 | 5 | 4 | 1 | 2 | 512 MW | 1.8 GW | 14.0¢ | +26% |
| Alabama | 23 | 6 | 10 | 14 | 2 | 299 MW | 663 MW | 16.1¢ | +32% |
| Oklahoma | 23 | 8 | 9 | 13 | 2 | 368 MW | 623 MW | 13.2¢ | +28% |
| North Dakota | 19 | 1 | 8 | 1 | 1 | 68 MW | 520 MW | 11.8¢ | +15% |
| Kentucky | 19 | 3 | 8 | 28 | – | – | – | 13.1¢ | +24% |
| Wisconsin | 18 | 3 | 8 | 33 | 2 | 369 MW | 4.0 GW | 18.1¢ | +29% |
| South Carolina | 17 | 8 | 5 | 10 | 1 | 129 MW | 168 MW | 15.1¢ | +22% |
| Louisiana | 14 | 4 | 1 | 1 | 1 | – | 2.2 GW | 12.5¢ | +31% |
| Kansas | 14 | 2 | 12 | 13 | – | – | – | 14.4¢ | +8% |
| Montana | 12 | – | 2 | 3 | – | – | – | 13.0¢ | +19% |
| Arkansas | 10 | 4 | 2 | 6 | – | – | – | 12.9¢ | +31% |
| Connecticut | 9 | – | 10 | 3 | – | – | – | 29.3¢ | +38% |
| Idaho | 8 | 2 | 2 | 3 | 1 | 152 MW | 198 MW | 11.8¢ | +17% |
| New Hampshire | 7 | – | 1 | 3 | – | – | – | 24.5¢ | +25% |
| Hawaii | 6 | 3 | 1 | – | – | – | – | 40.4¢ | +24% |
| South Dakota | 6 | – | 3 | 2 | – | – | – | 13.3¢ | +15% |
| Delaware | 5 | – | 3 | 2 | – | – | – | 17.1¢ | +37% |
| Maine | 4 | – | 5 | 9 | – | – | – | 27.7¢ | +64% |
| West Virginia | 4 | 3 | 7 | – | – | – | – | 15.4¢ | +38% |
| District of Columbia | 2 | – | – | – | – | – | – | 21.9¢ | +71% |
| Rhode Island | 2 | – | 1 | 3 | – | – | – | 29.5¢ | +43% |
| Vermont | 2 | – | – | 3 | – | – | – | 22.8¢ | +26% |
| Alaska | 0 | – | 6 | 1 | – | – | – | 26.1¢ | +19% |
By county
The data center counties
Hours without power: the average customer's hours out in a typical year in this site's outage record (ORNL EAGLE-I).
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Loudoun County, VA | 209 | 2.6 h |
| Maricopa County, AZ | 102 | 1.5 h |
| Santa Clara County, CA | 99 | 4.7 h |
| Prince William County, VA | 69 | 1.8 h |
| Dallas County, TX | 67 | 9.5 h |
| Cook County, IL | 58 | 2.1 h |
| Fairfax County, VA | 52 | 3.5 h |
| Bexar County, TX | 51 | 3.3 h |
| Fulton County, GA | 47 | 6.2 h |
| Taylor County, TX | 46 | 8.4 h |
| Franklin County, OH | 41 | 6.5 h |
| Washington County, OR | 41 | 4.0 h |
| Grant County, WA | 40 | 0.3 h |
| Morrow County, OR | 38 | 2.4 h |
| Umatilla County, OR | 36 | 3.9 h |
| Licking County, OH | 35 | 3.5 h |
| Los Angeles County, CA | 34 | 4.5 h |
| DuPage County, IL | 34 | 2.7 h |
| Venango County, PA | 32 | 12 h |
| Polk County, IA | 31 | 3.9 h |
Operators
Who runs them
Operators as tagged in OpenStreetMap or named by Civic Returns (1,874 of 2,955 sites name one), with spellings merged.
| Operator | Mapped sites |
|---|---|
| Amazon Web Services | 260 |
| Cogent Communications | 143 |
| Digital Realty | 90 |
| Microsoft | 78 |
| QTS | 68 |
| 64 | |
| Meta | 64 |
| Equinix | 63 |
| DataBank | 62 |
| Lumen | 58 |
| CyrusOne | 56 |
| Flexential | 48 |
| Centersquare | 37 |
| CoreSite | 36 |
| EdgeConneX | 35 |
| TierPoint | 32 |
| NTT | 30 |
| STACK Infrastructure | 30 |
| Vantage | 26 |
| H5 Data Centers | 24 |
AI by state
Where the AI power is going
Local pushback
Bans and moratoriums
704 local and state moratoriums or bans on data centers are recorded as enacted in 47 states, 89 more are proposed or under review, and 94 have expired, been rejected or been lifted (AI GridWatch, as of Nov 16, 2026). A time-limited moratorium with no documented end date keeps showing as enacted, and many are extended, so check with the town or county before relying on one.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Bucksport, ME | Local | Enacted | Oct 8, 2026 | A stated duration, but the end date isn't recorded here |
| Easthampton, MA | Local | Enacted | Oct 7, 2026 | Term not documented |
| Grand Junction, CO | Local | Proposed | Oct 7, 2026 | Runs until a condition is met, not to a date |
| Raleigh, NC | Local | Enacted | Oct 6, 2026 | to Apr 6, 2027 |
| Charleston, IL | Local | Enacted | Oct 6, 2026 | to Oct 6, 2027 |
| San Francisco, CA | Local | Enacted | Oct 6, 2026 | A stated duration, but the end date isn't recorded here |
| Oakland, CA | Local | Enacted | Oct 6, 2026 | A stated duration, but the end date isn't recorded here |
| Humboldt County, CA | County | Enacted | Oct 6, 2026 | A stated duration, but the end date isn't recorded here |
| Menasha, WI | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| Delphos, OH | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| West Seneca, NY | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| Beaufort County, NC | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| Columbus County, NC | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| Evansville, IN | Local | Enacted | Oct 5, 2026 | A stated duration, but the end date isn't recorded here |
| Anne Arundel County, MD | Local | Enacted | Oct 1, 2026 | to Jan 31, 2028 |
| Blaine County, ID | Local | Enacted | Oct 1, 2026 | A stated duration, but the end date isn't recorded here |
| Baldwin County, AL | Local | Enacted | Oct 1, 2026 | A stated duration, but the end date isn't recorded here |
| Dixon, CA | Local | Enacted | Sep 30, 2026 | A stated duration, but the end date isn't recorded here |
| Mesa County, CO | Local | Enacted | Sep 29, 2026 | A stated duration, but the end date isn't recorded here |
| Janesville, WI | Local | Enacted | Sep 28, 2026 | to Sep 28, 2027 |
| Americus, GA | Local | Enacted | Sep 24, 2026 | A stated duration, but the end date isn't recorded here |
| New Hampshire (Senate), NH | State | Proposed | Sep 18, 2026 | Term not documented |
| Los Angeles County, CA | Local | Enacted | Sep 17, 2026 | Runs until a condition is met, not to a date |
| Arcata, CA | Local | Expired | Sep 16, 2026 | to Oct 31, 2026 |
| Sauk County, WI | County | Enacted | Sep 15, 2026 | A stated duration, but the end date isn't recorded here |
| Richmond, CA | Local | Expired | Sep 15, 2026 | to Oct 30, 2026 |
| Clarendon County, SC | Local | Enacted | Sep 14, 2026 | Term not documented |
| Upper Township, NJ | Local | Enacted | Sep 14, 2026 | No end date by design — a permanent ban or standing statute |
| Gilroy, CA | Local | Expired | Sep 14, 2026 | to Oct 29, 2026 |
| Lincoln County, WA | County | Enacted | Sep 10, 2026 | to Mar 10, 2027 |
| Lancaster County, NE | County | Withdrawn | Sep 10, 2026 | Term not documented |
| Jasper County, SC | County | Proposed | Sep 9, 2026 | Term not documented |
| Woodford County, KY | County | Enacted | Sep 9, 2026 | No end date by design — a permanent ban or standing statute |
| Levy County, FL | County | Enacted | Sep 9, 2026 | to Sep 30, 2027 |
| Trumbull, CT | Local | Enacted | Sep 9, 2026 | to Sep 9, 2028 |
| Hawthorne, CA | Local | Enacted | Sep 9, 2026 | A stated duration, but the end date isn't recorded here |
| Clearfield, UT | City | Enacted | Sep 8, 2026 | to Mar 7, 2027 |
| Oregon (state land), OR | State | Enacted | Sep 8, 2026 | to Jul 1, 2027 |
| Glassboro, NJ | Local | Enacted | Sep 8, 2026 | No end date by design — a permanent ban or standing statute |
| Nottingham, NH | Local | Enacted | Sep 8, 2026 | A stated duration, but the end date isn't recorded here |
| Talbot County, MD | Local | Proposed | Sep 8, 2026 | Term not documented |
| Lake County, IL | Local | Enacted | Sep 8, 2026 | to May 8, 2027 |
| Putnam County, FL | County | Enacted | Sep 8, 2026 | to Sep 8, 2027 |
| Lake County, FL | Local | Enacted | Sep 8, 2026 | to Dec 7, 2026 |
| Foley, AL | City | Enacted | Sep 8, 2026 | to Mar 8, 2027 |
| Tarrant, AL | City | Enacted | Sep 8, 2026 | to Sep 8, 2027 |
| Hendersonville, NC | Local | Proposed | Sep 3, 2026 | Term not documented |
| Palmyra, MO | City | Enacted | Sep 3, 2026 | Term not documented |
| Biddeford, ME | City | Proposed | Sep 3, 2026 | No end date by design — a permanent ban or standing statute |
| Northampton, MA | City | Proposed | Sep 3, 2026 | Term not documented |
| Butte-Silver Bow, MT | County | Proposed | Sep 2, 2026 | Term not documented |
| Winchester, KY | City | Enacted | Sep 2, 2026 | to Sep 2, 2027 |
| Franklin County, GA | County | Enacted | Sep 2, 2026 | to Dec 31, 2028 |
| St. Croix County, WI | Local | Enacted | Sep 1, 2026 | to Sep 1, 2027 |
| Morristown, VT | Town | Enacted | Sep 1, 2026 | Term not documented |
| Defiance, OH | Local | Enacted | Sep 1, 2026 | A stated duration, but the end date isn't recorded here |
| Manchester Township, NJ | Local | Enacted | Sep 1, 2026 | No end date by design — a permanent ban or standing statute |
| Bow, NH | Town | Under Review | Sep 1, 2026 | Term not documented |
| Rochester, NH | Local | Enacted | Sep 1, 2026 | No end date by design — a permanent ban or standing statute |
| Brighton Township, MI | Local | Enacted | Sep 1, 2026 | A stated duration, but the end date isn't recorded here |
How complete
Our count beside other trackers
No agency counts data centers, so every tracker differs in what it counts. Pew Research counted 3,068 operating US data centers in Data Center Map's listings (February 2026; states shown are Pew's top 15). The US Data Center Map (dcmap.us) counts 4,771 operating, under-construction and planned sites (October 2026). This map has 2,955 operating or permitted sites and 3,885 counting projects in development. Commercial directories list single colocation suites and small enterprise server rooms that public records and maps rarely show.
| State | Ours, operating | Pew / Data Center Map, operating | Ours, with projects | dcmap.us, with projects |
|---|---|---|---|---|
| Virginia | 435 | 398 | 582 | 591 |
| Texas | 406 | 296 | 527 | 561 |
| California | 236 | 277 | 258 | 343 |
| Ohio | 130 | 166 | 168 | 238 |
| Georgia | 103 | 94 | 186 | 232 |
| Arizona | 110 | 98 | 136 | 176 |
| New York | 67 | 148 | 86 | 168 |
| Illinois | 107 | 139 | 141 | 164 |
| Florida | 65 | 120 | 80 | 141 |
| Pennsylvania | 73 | 78 | 119 | 132 |
| Washington | 90 | 124 | 100 | 117 |
| Indiana | 39 | 38 | 69 | 106 |
| New Jersey | 93 | – | 102 | 103 |
| Oregon | 147 | 115 | 156 | 101 |
| North Carolina | 61 | 72 | 79 | 99 |
| Minnesota | 42 | – | 60 | 89 |
| Missouri | 48 | – | 63 | 88 |
| Colorado | 65 | – | 74 | 87 |
| Michigan | 33 | – | 50 | 75 |
| Tennessee | 39 | – | 48 | 74 |
| Nevada | 50 | – | 64 | 73 |
| Utah | 41 | – | 59 | 69 |
| Iowa | 79 | 64 | 95 | 67 |
| Maryland | 26 | – | 38 | 62 |
| Oklahoma | 23 | – | 40 | 60 |
| Massachusetts | 29 | – | 32 | 56 |
| Wisconsin | 18 | – | 29 | 54 |
| Nebraska | 36 | – | 39 | 50 |
| Kentucky | 19 | – | 30 | 45 |
| Wyoming | 30 | – | 35 | 39 |
| North Dakota | 19 | – | 28 | 37 |
| Mississippi | 23 | – | 32 | 36 |
| Kansas | 14 | – | 28 | 36 |
| South Carolina | 17 | – | 30 | 32 |
| Alabama | 23 | – | 39 | 31 |
| Connecticut | 9 | – | 19 | 31 |
| New Mexico | 28 | – | 32 | 28 |
| Louisiana | 14 | – | 19 | 28 |
| West Virginia | 4 | – | 14 | 27 |
| New Hampshire | 7 | – | 8 | 24 |
| Hawaii | 6 | – | 10 | 23 |
| Arkansas | 10 | – | 16 | 22 |
| Idaho | 8 | – | 12 | 22 |
| Alaska | 0 | – | 6 | 20 |
| Montana | 12 | – | 14 | 19 |
| South Dakota | 6 | – | 9 | 17 |
| Delaware | 5 | – | 8 | 16 |
| Maine | 4 | – | 9 | 15 |
| Rhode Island | 2 | – | 3 | 14 |
| District of Columbia | 2 | – | 2 | 13 |
| Vermont | 2 | – | 2 | 9 |
Their figures: Pew Research Center from Data Center Map; US Data Center Map, data as of Oct 2026. Quoted, not copied: their site lists are not used here.
How many data centers are in the US?
This map has 2,955 operating or permitted data center sites in 51 states: 1,743 from OpenStreetMap (read Nov 17, 2026; buildings inside a mapped campus count with it), 461 from data center operators' own published facility lists, 492 from EPA facility records (most hold air permits for their backup generators), 185 from the Civic Returns dataset, and 73 from named map features, Overture Maps places, Wikidata and EIA power plant records, each kept only when it is not already on the map. There is no official count. Pew Research's count of one commercial directory (Data Center Map, February 2026) found about 3,000 operating facilities, a list that also takes in small colocation suites, so treat this map as most of the large sites rather than every server room.
How many data centers are being built?
259 projects are under construction and 671 more are planned or announced in the Civic Returns and Server Country databases, on top of the AI campuses Epoch AI tracks. 450 of them publish a size, adding up to about 215.4 GW; announced sizes are often a campus's full build-out over many years. 109 projects have been cancelled or withdrawn.
How much electricity do data centers use?
About 176 TWh in 2023, or 4.4% of all US electricity, by Lawrence Berkeley National Laboratory's 2024 report to Congress, up from 58 TWh in 2014. Its scenarios put 2028 at 325 to 580 TWh, 6.7% to 12% of the country's electricity.
Which state has the most data centers?
Virginia, with 435 mapped sites, followed by Texas (406), California (236), Oregon (147). Loudoun County, VA alone has 209.
What is the largest AI data center in the US?
By power drawn today, Anthropic-Amazon New Carlisle (Amazon) in New Carlisle, IN, at about 1.0 GW by Epoch AI's estimate. By planned size, Microsoft Fairwater Wisconsin in Mount Pleasant, WI, planned to reach about 2.7 GW by May 2028.
How much power do AI data centers use?
The 77 US AI campuses Epoch AI tracks draw about 12.6 GW between them today, up from 6.0 GW a year earlier. Their build plans add up to about 43.4 GW by January 2030. For scale, 1.0 GW running all year uses about 8.8 TWh, roughly what 800,000 US homes use.
Do data centers cause power outages?
Not in this record: outages come overwhelmingly from storms and damage to local wires. 8 of the 10 counties with the most mapped data centers have fewer hours without power a year than the median US county (6.5 h); Loudoun County averages 2.6 h. The open question is cost and supply: grid operators and utilities are building plants and lines for this demand, and who pays for them is being argued before state regulators. The state table below puts each state's household electricity price beside its data centers; it shows the two side by side and does not show that one causes the other.
Sources: 461 sites from data center operators' own published facility lists (facility name and address, read from each operator's website). EPA ECHO facility records (public domain): 492 sites whose industry code is data processing and hosting or whose name names a data center or data center operator, each checked by name; these include sites permitted but not yet finished. Overture Maps places (CDLA-Permissive-2.0), Wikidata (CC0) and EIA-860. Operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026, processed the way Pacific Northwest National Laboratory's IM3 Open Source Data Center Atlas does: buildings and points inside a mapped campus count with that campus, and each site is placed in a county by its centre. 185 operating sites and 465 projects from Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0, audited to Oct 18, 2026); its operating sites within half a mile of an OpenStreetMap site are left out as likely the same. 449 further projects from the Server Country project database (CC BY 4.0, snapshot Oct 2, 2026) where they match nothing in Civic Returns; they have no coordinates and sit at their city or county. AI campuses from Epoch AI, "AI data centers" (CC BY 4.0), as of Nov 17, 2026, placed by address (Census geocoder or OpenStreetMap Nominatim) or, where there is none, their city; projects Epoch tracks are counted only there. Moratoriums and further projects: AI GridWatch (CC BY 4.0) and Megawattlas (CC BY 4.0), matched against the other lists. National electricity use: LBNL, 2024 United States Data Center Energy Usage Report. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. See also surging demand, power plants and electric bills.