Data centers · Kentucky

Data centers in Kentucky

19 operating data center sites, 11 projects planned or under construction.

Operating sites192 whole campuses
AI campuses0None tracked by Epoch AI
In the pipeline113 under construction, 8 planned
Home price13.1¢/kWh+24% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
PowerHouse Louisville PowerHouse Jefferson Under construction 402 MW 2026
TeraWulf Justified Data Campus (Hawesville) TeraWulf (tenant: Anthropic) Hancock Under construction 401 MW 2027
TeraWulf Justified Data TeraWulf Hancock Under construction – –
Mason County Technology Campus Fortune 100 Company (undisclosed) Mason Planned 2.2 GW –
TeraWulf Muskie Data Campus TeraWulf Greenup Planned 1.0 GW 2030
DartPoints Lexington Data Center DartPoints Operating Company Fayette Planned 70 MW –
MD Squared Power Pikeville Data Center MD Squared Power LLC Pike Planned 30 MW –
Cave City data center (Kentucky Industrial Alliance) Kentucky Industrial Alliance LLC Barren Planned – –
Franklin-Simpson Data Storage and Service Center TenKey LandCo I LLC Simpson Planned – –
Mercer County Data Center (Handy Road) American Farm Investors Mercer Planned – –
Paducah DOE Data Center Campus Brookfield / NextEra Energy (DOE site partnership) McCracken Planned – 2028
Project Lincoln Western Hospitality Partners Oldham Cancelled – –

Local pushback

Bans and moratoriums

28 recorded as enacted, 0 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Woodford County · Woodford County Enacted Sep 9, 2026 No end date by design — a permanent ban or standing statute
Winchester · Clark City Enacted Sep 2, 2026 to Sep 2, 2027
Louisville · Jefferson Local Enacted Aug 13, 2026 to Feb 13, 2027
Jessamine County · Jessamine Local Enacted Aug 4, 2026 to Aug 4, 2027
London · Laurel Local Enacted Aug 3, 2026 to Sep 30, 2028
Clark County · Clark County Enacted Aug 1, 2026 A stated duration, but the end date isn't recorded here
Rowan County · Rowan County Enacted Aug 1, 2026 A stated duration, but the end date isn't recorded here
Lyon County · Lyon Local Enacted Aug 1, 2026 A stated duration, but the end date isn't recorded here
Nicholasville · Jessamine Local Enacted Aug 1, 2026 A stated duration, but the end date isn't recorded here
Mercer County · Mercer Local Enacted Aug 1, 2026 A stated duration, but the end date isn't recorded here
Logan County · Logan Local Enacted Jul 30, 2026 to Jul 30, 2027
Georgetown · Scott City Enacted Jul 14, 2026 to Dec 31, 2026
Boyd County · Boyd County Enacted Jul 9, 2026 to Jan 9, 2027
Bell County · Bell Local Enacted Jul 2, 2026 to Jul 2, 2028
Nelson County · Nelson County Enacted Jul 1, 2026 A stated duration, but the end date isn't recorded here

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Jefferson County65.8 h
Boone County32.3 h
McCracken County22.5 h
Marshall County25.3 h
Hopkins County19.8 h
Floyd County115 h
Fayette County17.2 h
Calloway County15.3 h
Shelby County12.7 h
Pike County116 h

Every named site

The list

17 of 19 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
– CyrusOne Boone Building 3.2
Core Scientific: Calvert 1, 2 & 3 Core Scientific Marshall Civic Returns 1.4
Flexential Louisville - Downtown Flexential Jefferson Building 0.8
Flexential Louisville - East Flexential Jefferson Building 0.8
East Kentucky Network Datacenter – Floyd Building 0.4
Cogent Louisville Data Center Cogent Communications Jefferson Operator's own list –
Cogent Louisville Edge Data Center Cogent Communications Jefferson Operator's own list –
Cogent Lexington Edge Data Center Cogent Communications Fayette Operator's own list –
Core Scientific Calvert 1, 2, & 3 Core Scientific Marshall Operator's own list –
Data Canopy Louisville, KY Data Canopy Jefferson Operator's own list –
MARA Murray Kentucky MARA Calloway Operator's own list –
Riot Platforms Kentucky - Commerce Drive Riot Platforms McCracken Operator's own list –
Lg&E Ku System Control & Data Center – Shelby EPA record –
Amazon Data Services Inc Amazon Web Services Boone EPA record –
Amazon Data Services Inc Amazon Web Services Boone EPA record –
Pikeville Medical Center Data Center – Pike EPA record –
Humana Data Center – Jefferson EPA record –

How many data centers are in Kentucky?

19 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 33rd most of any state. 2 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Kentucky?

3 under construction and 8 planned or announced in the Civic Returns and Server Country databases; the 6 that publish a size add up to about 4.1 GW. 1 project has been cancelled.

Which Kentucky county has the most data centers?

Jefferson County, with 6 operating sites, then Boone County (3) and McCracken County (2).

Who operates data centers in Kentucky?

Among sites that name an operator: Cogent Communications (3), Core Scientific (2), Flexential (2), Amazon Web Services (2), CyrusOne (1).

What do Kentucky households pay for electricity?

13.1¢ per kWh on average in 2025 (US: 17.2¢), up 24% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.