Google's AI campus in Armstrong County. It is not drawing power yet and is planned to reach 1.29 GW by October 2027.
Latest look · Apr 16, 2026
What the satellite shows
Progress is made on all buildings, Building 1 and 2 specically have begun to install cooling structures. The substation expansion seems to be nearing completion.
Build-out
Power, month by month
Who
Owners, users and builders
- Owner
- Google (speculative)
- Used by
- Google DeepMind (speculative)
- Built by
- Crusoe, Hoffman
- Energy companies
- Serena
- Chips
- B300, Rubin
- Address
- 10001 Lima Rd, Claude, TX 79019
- County
- Armstrong County (approximate)
Where
On the map of Texas
Placed at the centre of Claude, as no address could be matched, so the dot and the county are approximate.
Nearby
Power plants within 15 miles
| Plant | Source | Capacity | Distance |
|---|---|---|---|
| Goodnight | ● Wind | 266 MW | 2.3 mi |
| Grandview Wind Farm, LLC | ● Wind | 211 MW | 9.5 mi |
| Colbeck's Corner, LLC | ● Wind | 200 MW | 14.2 mi |
| Route 66 Wind Plant | ● Wind | 150 MW | 7.9 mi |
Timeline
Every observation
| Date | What Epoch AI saw | Power |
|---|---|---|
| Apr 16, 2026 | Progress is made on all buildings, Building 1 and 2 specically have begun to install cooling structures. The substation expansion seems to be nearing completion. | – |
| Dec 23, 2025 | Construction on Building 1 and 2 looks about halfway to completion. Foundations and utility trenches are visible for Building 3-4. Building 5-6 have an outline. The substation appears to be expanding. | – |
| Oct 16, 2025 | Building 1 and 2 under construction. | – |
| May 19, 2025 | Land clearing begins | – |
Plus 3 projected steps to October 2027, from Epoch AI's reading of the build plans.
How much power does Goodnight use?
It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 1.29 GW by October 2027.
Who owns Goodnight?
Google (speculative); used by Google DeepMind (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".
How reliable is the power around Goodnight?
In Armstrong County, the average customer is without power about 17 hours in a typical year in this site's outage record, with 51 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.
What power plants are near Goodnight?
4 plants within 15 miles total about 827 MW; the largest is Goodnight (266 MW, wind), 2.3 miles away. Nearness does not mean it supplies the campus.
Epoch AI's sources for this campus
- Amended tax abatement agreement, with updated blueprints on p.46
- Original tax abatement agreement, with original blueprints and specs on the last page
- TABS database, with "Llano" data centers in the city of Claude
- Press release reports Google investing in a new data center in Armstrong County
- Clean Air Act Initial Prevention of Significant Deterioration permit application.
Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.