AI data center · Abilene, Texas

OpenAI Stargate Shackelford

Oracle's AI campus in Shackelford County. It is not drawing power yet and is planned to reach 1.96 GW by November 2028.

Power now–As of Sep 4, 2026
Planned peak1.96 GWNovember 2028
Compute–H100-equivalent chips now
Capital cost–So far, 2025 dollars

Latest look · Sep 4, 2026

What the satellite shows

Buildings 1-5 shells complete and fully roofed. Buildings 1-3 appear to be actively installing cooling and backup generators nearby. The pads for Buildings 6-10 to the north have also been visibly cleared, with foundations for Buildings 6 and 7 underway.

Build-out

Power, month by month

0 MW500 MW1 GW1.5 GW2 GW2.5 GW202620272028Today
Power drawn by OpenAI Stargate Shackelford, from Epoch AI's dated observations and (hatched) its projections.
0 MW500 MW1 GW1.5 GW2 GW2.5 GW202620272028Today
Power drawn by OpenAI Stargate Shackelford, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Owner
Oracle
Used by
OpenAI
Project
Stargate
Investors
Oracle, OpenAI
Chips
Rubin
Address
175 Private Road 1604, Abilene, TX 79601, Shackelford County
County
Shackelford County

Where

On the map of Texas

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of the county its address names; the exact site is not mapped here.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Mesquite Wind Power LLC● Wind200 MW11 mi
Hackberry Wind Farm● Wind166 MW6.7 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Sep 4, 2026Buildings 1-5 shells complete and fully roofed. Buildings 1-3 appear to be actively installing cooling and backup generators nearby. The pads for Buildings 6-10 to the north have also been visibly cleared, with foundations for Buildings 6 and 7 underway.–
Apr 14, 2026Steel framing is underway for Buildings 1-3, and roofing is underway for Building 1.–
Jan 18, 2026The layout of Buildings 1-5 is visible. Steel framing has just started on Building 1.–
Aug 1, 2025Land clearing begins.–

Plus 10 projected steps to November 2028, from Epoch AI's reading of the build plans.

How much power does OpenAI Stargate Shackelford use?

It is not drawing power yet in Epoch AI's timeline; it is planned to reach about 1.96 GW by November 2028.

Who owns OpenAI Stargate Shackelford?

Oracle; used by OpenAI. Investors: Oracle, OpenAI. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around OpenAI Stargate Shackelford?

In Shackelford County, the average customer is without power about 11 hours in a typical year in this site's outage record, with 63 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near OpenAI Stargate Shackelford?

2 plants within 15 miles total about 366 MW; the largest is Mesquite Wind Power LLC (200 MW, wind), 11 miles away. Nearness does not mean it supplies the campus.