Data centers · Texas
Data centers in Texas
406 operating data center sites, 121 projects planned or under construction and 14 AI campuses planned to draw 8.9 GW. Texas ranks 2nd of 51 by mapped sites.
The map
Every mapped site
AI campuses
Texas's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| OpenAI Stargate Abilene | Oracle | Taylor County | 824 MW | 1.2 GW |
| CoreWeave Denton TX | CoreWeave | Denton County | 262 MW | 395 MW |
| Meta Temple | Meta | Bell County | 178 MW | 231 MW |
| Coreweave Helios | CoreWeave | Dickens County | 132 MW | 800 MW |
| Google Midlothian | Ellis County | 103 MW | 123 MW | |
| Google Red Oak | Ellis County | 77 MW | 185 MW | |
| Microsoft SAT40 | Microsoft | Bexar County | 75 MW | 106 MW |
| Microsoft SAT14 | Microsoft | Bexar County | 47 MW | 66 MW |
| Vantage TX1 | – | Bexar County | 32 MW | 179 MW |
| OpenAI Stargate Shackelford | Oracle | Shackelford County | – | 2.0 GW |
| Goodnight | Armstrong County | – | 1.3 GW | |
| OpenAI Stargate Milam | Softbank | Milam County | – | 1.2 GW |
| Crusoe Abilene Expansion | Microsoft | Taylor County | – | 941 MW |
| Anthropic Barber Lake | Cipher Mining | Mitchell County | – | 300 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| Frontier - Shackelford County | Vantage Data Centers | Shackelford | Under construction | 1.4 GW | 2026 |
| CloudBurst San Marcos GigaCenter (San Antonio Data Center I) | CloudBurst (built by Evolve) | Hays | Under construction | 1.2 GW | 2026 |
| Fermi Advanced Energy & Intelligence Campus | Fermi America | Carson | Under construction | 1.0 GW | 2026 |
| Meta El Paso Data Center | Meta | El Paso | Under construction | 1.0 GW | 2028 |
| CyrusOne / Constellation Freestone Energy Center Data Center Campus | CyrusOne | Freestone | Under construction | 760 MW | 2027 |
| Nexus - Apex DFW HB1 (Hubbard) | Nexus Data Centers (tenant: Anthropic; backed by Google) | Hill | Under construction | 600 MW | 2027 |
| PowerCampus Austin | Skybox | Williamson | Under construction | 600 MW | 2026 |
| Project Caprock | Aligned Data Centers | Hale | Under construction | 540 MW | 2027 |
| CyrusOne DFW10 | CyrusOne | Bosque | Under construction | 400 MW | 2026 |
| Pampa Natural ‑ Gas Data Center | APR Energy | Gray | Under construction | 400 MW | 2026 |
| Hut 8 Beacon Point Campus | Hut 8 | Nueces | Under construction | 352 MW | 2027 |
| PowerCampus Dallas | Skybox | Dallas | Under construction | 300 MW | 2026 |
| Rowan Cinco Data Center | Rowan Digital Infrastructure | Medina | Under construction | 300 MW | 2027 |
| Rowan Project Temple | Rowan Digital Infrastructure | Bell | Under construction | 300 MW | 2027 |
| CleanSpark Austin County AI Campus | CleanSpark | Austin | Under construction | 285 MW | – |
| Stream Data Center: Wilmer II Hyperscale Campus (DFW C) | Stream Data Centers | Dallas | Under construction | 240 MW | 2027 |
| Stack Infrastructure DFW02 | Stack Infrastructure | Dallas | Under construction | 216 MW | 2026 |
| Pioneer Park (Phase 1 and 2) | DataNovaX | Wichita | Under construction | 202 MW | – |
| PowerHouse Irving | PowerHouse | Dallas | Under construction | 201 MW | 2026 |
| AREP Powerhouse Las Colinas | American Real Estate Partners | Dallas | Under construction | 200 MW | 2027 |
| ECP & KKR - Bosque County Campus | Energy Capital Partners | Bosque | Under construction | 190 MW | 2026 |
| Abernathy Data Center (Fluidstack JV) | Fluidstack (majority owner; acquired stake from TeraWulf); tenant: Anthropic | Hale | Under construction | 168 MW | 2026 |
| Atlantic Station | Skybox | Collin | Under construction | 100 MW | 2027 |
| CyrusOne DFW7 | CyrusOne | Tarrant | Under construction | 70 MW | 2026 |
| Prime Data Centers: DFW02-02 | Prime Data Centers | Dallas | Under construction | 48 MW | 2026 |
| Prime Data Centers: DFW04-01.01 | Prime Data Centers | Tarrant | Under construction | 48 MW | 2026 |
| Prime Data Centers: DFW04-02.01 | Prime Data Centers | Tarrant | Under construction | 48 MW | 2026 |
| Prime Data Centers: DFW04-03.01 | Prime Data Centers | Tarrant | Under construction | 48 MW | 2026 |
| QTS Irving DFW2-DC3 | QTS | Dallas | Under construction | 43 MW | 2027 |
| TRG Datacenters HOU2 & HOU3 | TRG Datacenters | Harris | Under construction | 24 MW | – |
| Oppidan 5MW Data Center | Oppidan | El Paso | Under construction | 5 MW | 2026 |
| Aligned Dallas DFW04 | Aligned | Collin | Under construction | – | 2026 |
| Aligned Data Centers - Mansfield DFW-03 | Aligned Data Centers | Tarrant | Under construction | – | 2025 |
| Armstrong County Data Center | Armstrong | Under construction | – | – | |
| Crusoe Childress campus | Crusoe | Childress | Under construction | – | – |
| CyrusOne Freestone County | CyrusOne | Freestone | Under construction | – | – |
| EdgeConneX AUS01 | EdgeConneX | Bastrop | Under construction | – | – |
| Element Critical Houston Two | Element Critical | Harris | Under construction | – | – |
| Flexential Dallas-Talty 1 Data Center | Flexential | Kaufman | Under construction | – | – |
| Fluidstack Cameron County Campus | Fluidstack | Cameron | Under construction | – | – |
| Galaxy Helios AI & HPC data center campus | Galaxy | Dickens | Under construction | – | – |
| Google Haskell, Texas | Haskell | Under construction | – | – | |
| Google Pampa, Texas | Gray | Under construction | – | – | |
| Google Wilbarger County Data Center | Wilbarger | Under construction | – | 2028 | |
| Haskell County Data Center 1 | Haskell | Under construction | – | – | |
| Haskell County Data Center 2 | Haskell | Under construction | – | – | |
| Matrix Data Center Campus | MSB Global Services | Hopkins | Under construction | – | 2026 |
| Meitner Energy Center | Google / Intersect | Gray | Under construction | – | 2028 |
| Microsoft - Medina County Data Centers | Microsoft | Medina | Under construction | – | 2027 |
| NTT Global Data Centers Dallas TX4 Data Center | NTT Global Data Centers | Dallas | Under construction | – | – |
| PowerHouse Circle T | PowerHouse Data Centers | Dallas | Under construction | – | – |
| PowerHouse Grand Prairie | PowerHouse Data Centers | Dallas | Under construction | – | – |
| Prime Data Centers: DFW02-01 | Prime Data Centers | Dallas | Under construction | – | 2026 |
| Project Raptor | Colovore | Williamson | Under construction | – | 2026 |
| Riot Platforms Corsicana AI/HPC expansion (168 MW Core & Shell) | Riot Platforms | Navarro | Under construction | – | – |
| Sabey Austin Data Center | Sabey | Hays | Under construction | – | 2024 |
| Sailfish Comanche Circle | Sailfish Digital Ventures | Hood | Planned | 3.2 GW | 2028 |
| LandBridge / PowerBridge Alpha Digital Data Center Campus | LandBridge | Reeves | Planned | 2.0 GW | 2028 |
| Tract Austin | Tract | Caldwell | Planned | 2.0 GW | 2028 |
| Project Aquila | RCM Hill LLC | Hill | Planned | 1.2 GW | – |
| Crusoe / Lancium Childress Campus | Crusoe / Lancium | Childress | Planned | 1.0 GW | – |
| QTS / Lancium Hall County Clean Campus | QTS Data Centers | Hall | Planned | 1.0 GW | – |
| Tract Applewhite Technology Park | Tract | Bexar | Planned | 720 MW | – |
| IREN Sweetwater 2 | IREN | Nolan | Planned | 600 MW | 2027 |
| Tract Medina Technology Park | Tract | Medina | Planned | 500 MW | 2028 |
| Prime Data Centers AUS01 (Lockhart Campus) | Prime Data Centers | Caldwell | Planned | 384 MW | – |
| Project Comal | KDC | Williamson | Planned | 360 MW | – |
| Archer: Dallas Campus | Archer Datacenters | Dallas | Planned | 300 MW | – |
| Calvano: Wichita Falls City | Calvano Development | Wichita | Planned | 300 MW | – |
| Data City | Energy Abundance Development Corporation | Webb | Planned | 300 MW | 2026 |
| Crow Holdings Dallas Data Center | Crow Holdings / CleanArc Data Centers | Dallas | Planned | 245 MW | 2027 |
| Nscale Ward County | Nscale | Ward | Planned | 240 MW | – |
| Crusoe Energy Nolan County Data Center | Crusoe Energy Systems | Nolan | Planned | 200 MW | – |
| Stream Data Centers - Graham / Plug Power Site | Stream Data Centers | Young | Planned | 164 MW | – |
| Pace Glasscock County Texas-First Data Center | Pace | Glasscock | Planned | 100 MW | – |
| Skybox Legacy Campus | Skybox | Dallas | Planned | 100 MW | – |
| EdgeConneX AUS02 | EdgeConneX | Bastrop | Planned | 96 MW | 2026 |
| Project Annie data center | Soluna | Lamar | Planned | 75 MW | – |
| Galaxy Project Merlin McGregor Data Center | Galaxy Digital | McLennan | Planned | 74 MW | 2028 |
| Stark Infrastructure DFW01C | Stack Infrastructure | Collin | Planned | 48 MW | – |
| Blueprint Projects: Taylor City | Blueprint Projects | Williamson | Planned | 30 MW | 2027 |
| ACS Fort Worth | ACS DC Hicks Field Road | Tarrant | Planned | – | 2034 |
| AWS - Round Rock Data Center | Amazon Web Services | Williamson | Planned | – | – |
| Aligned Dallas DFW03 | Aligned | Tarrant | Planned | – | 2027 |
| Amazon Data Services Creekside Campus | Amazon Data Services | Bastrop | Planned | – | – |
| American Tower Data Center - Highway 90 | American Tower | Bexar | Planned | – | – |
| BCG Cedar Creek Campus | BlackChamber Group | Bastrop | Planned | – | – |
| BT Gateway Data Center | BT Gateway Data Center LLC | Rockwall | Planned | – | 2027 |
| Black Mountain: Forest Hill | Black Mountain | Tarrant | Planned | – | – |
| Castroville Hwy 90 campus (SAT89 & SAT90) | Microsoft | Medina | Planned | – | 2027 |
| Castroville Potranco Rd. campus (SAT80-1/-2 & SAT82) | Microsoft | Medina | Planned | – | 2028 |
| Cipher Digital Reveille | Cipher Digital | La Salle | Planned | – | – |
| CloudHQ SAT Campus | CloudHQ | Bexar | Planned | – | – |
| Compass Datacenters Red Oak campus | Compass Datacenters | Ellis | Planned | – | – |
| CyrusOne SAT14A (Castroville) | CyrusOne | Medina | Planned | – | 2027 |
| Data Center THM1A | Jones | Planned | – | 2027 | |
| Digital Commerce Park One | Cawley Partners | Dallas | Planned | – | – |
| GigaPop Data Center | Gigabit Fiber | Ellis | Planned | – | 2026 |
| Hays County Data Center TBD | Highlander SM One | Hays | Planned | – | – |
| InfraTech Capital Data Center Campus | InfraTech Capital (consortium; anchor hyperscaler tenant not yet named) | Carson | Planned | – | – |
| Irving Data Center | Microsoft | Dallas | Planned | – | 2027 |
| Jarvis Media Group: Montgomery Data Center | Jarvis Media Group | Montgomery | Planned | – | – |
| Kroozin at SH-249 | Altaf Makanojiya | Harris | Planned | – | – |
| Nightpeak Old Ocean Data Center | Nightpeak Energy | Brazoria | Planned | – | 2027 |
| Palomino Alpha Guadalupe County Data Center | Palomino Alpha LLC | Guadalupe | Planned | – | 2034 |
| Prime Data Centers: DFW02-03 | Prime Data Centers | Dallas | Planned | – | 2027 |
| Project Eagle | Amazon (AWS) | Wharton | Planned | – | 2027 |
| Provident Data Centers Hillsboro Campus | Provident Realty Advisors | Hill | Planned | – | – |
| QTS Howard County | QTS | Howard | Planned | – | – |
| QTS Irving DFW2-DC4 | QTS | Dallas | Planned | – | 2027 |
| QTS Irving DFW2-DC5 | QTS | Dallas | Planned | – | 2025 |
| SAT93 & SAT94 Microsoft | Microsoft | Medina | Planned | – | 2029 |
| Skybox Datacenters Atlantic Station | Skybox Datacenters | Collin | Planned | – | – |
| Skybox Datacenters PowerCampus Dallas | Skybox Datacenters | Dallas | Planned | – | – |
| Skybox Datacenters PowerCampus Texas | Skybox Datacenters | Wichita | Planned | – | – |
| Soluna Project Annie | Soluna | Aransas | Planned | – | – |
| Soluna Project Grace | Soluna | Briscoe | Planned | – | – |
| Soluna Project Rosa | Soluna | Scurry | Planned | – | – |
| South Dallas One (Power Foundry) | GridFree AI | Hill | Planned | – | 2027 |
| Texas Critical Data Centers (TCDC) - Ector County | Texas Critical Data Centers | Ector | Planned | – | 2026 |
| University of Texas | University of Texas | El Paso | Planned | – | – |
| Zydeco Hutto Data Center | Zydeco | Williamson | Cancelled | 70 MW | – |
| West Erwin Street data center (Barrio Resources) | – | Smith | Cancelled | – | – |
Local pushback
Bans and moratoriums
10 recorded as enacted, 8 proposed or under review, 5 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Austin · Travis | Local | Proposed | Aug 27, 2026 | Term not documented |
| San Antonio · Bexar | Local | Rejected | Aug 26, 2026 | Term not documented |
| Athens · Henderson | Local | Enacted | Aug 23, 2026 | No end date by design — a permanent ban or standing statute |
| Fort Worth · Tarrant | Local | Proposed | Aug 11, 2026 | Term not documented |
| Lavon · Collin | Local | Expired | Aug 7, 2026 | to Nov 5, 2026 |
| Denton · Denton | Local | Proposed | Aug 5, 2026 | Term not documented |
| Lubbock · Lubbock | Local | Proposed | Aug 3, 2026 | Term not documented |
| Texas (Abbott directive) · Travis | State | Enacted | Aug 3, 2026 | Runs until a condition is met, not to a date |
| San Marcos · Hays | Local | Enacted | Jun 16, 2026 | No end date by design — a permanent ban or standing statute |
| Hill County · Hill | Local | Rescinded | Jun 4, 2026 | Term not documented |
| Harlingen · Cameron | Local | Enacted | May 1, 2026 | A stated duration, but the end date isn't recorded here |
| Hood County · Hood | County | Rejected | Feb 25, 2026 | Term not documented |
| Mesquite · Dallas | Local | Proposed | Jan 1, 2026 | Term not documented |
| Princeton · Collin | Local | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Milam County · Milam | County | Enacted | Jan 1, 2026 | Term not documented |
| Corpus Christi · Nueces | Local | Proposed | Jan 1, 2026 | Term not documented |
| El Paso · El Paso | Local | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Lewisville · Denton | Local | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Forney · Kaufman | Local | Proposed | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Tom Green County · Tom Green | County | Rejected | Jan 1, 2026 | Term not documented |
| Austin County · Austin | County | Enacted | Jan 1, 2026 | Term not documented |
| Brownsville · Cameron | Local | Proposed | Jan 1, 2026 | Term not documented |
| Hays County · Hays | Local | Enacted | Jan 1, 2026 | to Dec 31, 2026 |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Dallas County | 67 | 9.5 h |
| Bexar County | 51 | 3.3 h |
| Taylor County | 46 | 8.4 h |
| Collin County | 30 | 5.3 h |
| Travis County | 27 | 7.9 h |
| Harris County | 26 | 16 h |
| Tarrant County | 19 | 5.4 h |
| Ellis County | 19 | 7.7 h |
| Denton County | 16 | 4.5 h |
| Milam County | 6 | 15 h |
Every named site
The list
319 of 406 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| DFW2-DC1 Project | – | Dallas | Campus | 194 |
| Microsoft Texas Research Park Campus | Microsoft | Bexar | Campus, 6 buildings | 166 |
| Argo Data Center | – | Dickens | Campus | 145 |
| Fort Worth Data Center | Meta | Tarrant | Civic Returns | 57 |
| MARA Data Center | Marathon Digital Holdings | Hood | Campus | 40 |
| Vantage San Antonio I | Vantage | Bexar | Campus, 3 buildings | 38 |
| CyrusOne SAT10 & SAT11 | CyrusOne | Bexar | Campus, 2 buildings | 21 |
| Facebook Fort Worth Datacenter | Meta | Tarrant | Building | 17 |
| CyrusOne DFW1 | CyrusOne | Denton | Civic Returns | 15 |
| DataBank Plano Data Center | DataBank | Collin | Campus | 15 |
| Facebook Fort Worth Datacenter | Meta | Tarrant | Building | 15 |
| Microsoft San Antonio | Microsoft | Bexar | Building | 11 |
| Texas Cryptologic Center | National Security Agency | Bexar | Campus, 3 buildings | 10 |
| Facebook Fort Worth Datacenter | Meta | Tarrant | Building | 10.0 |
| Core Scientific: Denton 1 | Core Scientific | Denton | Civic Returns | 9.7 |
| Cortex supercomputer | – | Travis | Building | 9.3 |
| – | DXC Technology | Harris | Building | 8.1 |
| Skybox Houston One | Skybox | Harris | Campus | 7.9 |
| – | CyrusOne | Collin | Building | 7.8 |
| Stark Infrastructure DFW01A | STACK Infrastructure | Collin | Civic Returns | 7.3 |
| Core Scientific: Austin 1 | Core Scientific | Travis | Civic Returns | 7.2 |
| Cyxtera Dallas-Fort Worth Data Center | Cyxtera | Tarrant | Building | 7.0 |
| QTS Irving - Dallas Data Center Campus | QTS | Dallas | Building | 7.0 |
| Ellis | Building | 6.6 | ||
| Ellis | Building | 6.5 | ||
| Stream Data Centers DFWA | Stream Data Centers | Dallas | Building | 6.4 |
| QTS Data Center | QTS | Tarrant | Building | 6.4 |
| – | DXC Technology | Harris | Building | 6.0 |
| Microsoft | Microsoft | Bexar | Building | 5.9 |
| Digital Realty | Digital Realty | Dallas | Building | 5.9 |
| Compass Data Center | – | Ellis | Building | 5.8 |
| Compass Data Center | – | Ellis | Building | 5.8 |
| Compass Data Center | – | Ellis | Building | 5.8 |
| Compass Data Center | – | Ellis | Building | 5.8 |
| Compass Data Center | – | Ellis | Building | 5.8 |
| Compass Data Center | – | Ellis | Building | 5.7 |
| Compass Data Center | – | Ellis | Building | 5.7 |
| Compass Data Center | – | Ellis | Building | 5.7 |
| Compass Data Center | – | Ellis | Building | 5.7 |
| Compass Data Center | – | Ellis | Building | 5.7 |
| Microsoft | Microsoft | Bexar | Building | 5.6 |
| Microsoft SAT 81 | Microsoft | Medina | Building | 5.6 |
| Microsoft SAT 82 | Microsoft | Medina | Building | 5.6 |
| Microsoft SAT 80 | Microsoft | Medina | Building | 5.6 |
| CITIGROUP TECHNOLOGY INC | – | Denton | Building | 5.5 |
| Equinix Infomart | Equinix | Dallas | Building | 5.5 |
| Digital Realty Dallas DFW18 | Digital Realty | Dallas | Building | 5.1 |
| Flexential Dallas - Plano | Flexential | Collin | Building | 5.0 |
| Aligned Data Centers DFW-04 | Aligned | Collin | Building | 4.9 |
| NTT | NTT | Dallas | Building | 4.7 |
| Digital Realty | Digital Realty | Dallas | Building | 4.6 |
| NTT | NTT | Dallas | Building | 4.6 |
| CyrusOne DFW2 | CyrusOne | Denton | Civic Returns | 4.6 |
| Microsoft | Microsoft | Bexar | Building | 4.5 |
| Cipher Black Pearl Data Center | Cipher Digital Inc. | Winkler | Building | 4.4 |
| Alinged Data Center DFW-03 | Aligned | Tarrant | Building | 4.3 |
| – | CyrusOne | Travis | Building | 4.1 |
| Verizon Wireless Mew Building | – | Tarrant | Building | 4.0 |
| CyrusOne HOU3 | CyrusOne | Harris | Civic Returns | 4.0 |
| Switch: The Rock | Switch | Williamson | Building | 4.0 |
| CyrusOne HOU4 | CyrusOne | Harris | Civic Returns | 4.0 |
| NTT | NTT | Dallas | Building | 3.9 |
| – | CyrusOne | Tarrant | Building | 3.9 |
| Edged DFW Data Center | Edged | Dallas | Civic Returns | 3.7 |
| Stream Data Center: Austin I | Stream Data Centers | Travis | Civic Returns | 3.6 |
| Stack Infrastructure DFW01B | STACK Infrastructure | Collin | Civic Returns | 3.6 |
| TRG Houston Data Center | TRG | Harris | Civic Returns | 3.4 |
| Ellis | Building | 3.3 | ||
| Skybox Austin Data Center 1 | Skybox | Travis | Civic Returns | 3.2 |
| Centersquare DFW3 | Centersquare | Dallas | Civic Returns | 3.2 |
| QTS San Antonio II | QTS | Bexar | Building | 3.2 |
| Ellis | Building | 3.2 | ||
| Data Foundry - Texas 1 | – | Travis | Building | 3.1 |
| Richardson Data Center | KDC Real Estate Development | Dallas | Civic Returns | 3.0 |
| CyrusOne DFW6 | CyrusOne | Dallas | Civic Returns | 2.9 |
| Core Scientific: Cottonwood 1 & 2 | Core Scientific | Reeves | Civic Returns | 2.9 |
| NTT | NTT | Dallas | Building | 2.8 |
| Digital Realty Dallas DFW29 | Digital Realty | Dallas | Building | 2.8 |
| Digital Realty Dallas DFW28 | Digital Realty | Dallas | Building | 2.8 |
| Digital Realty Dallas DFW35 | Digital Realty | Dallas | Building | 2.7 |
| – | CyrusOne | Collin | Building | 2.7 |
| Evoque Allen DA1 | Centersquare | Collin | Building | 2.6 |
| – | DXC Technology | Harris | Building | 2.6 |
| Vantage Data Centers TX21 | Vantage | Bexar | Building | 2.6 |
| Vantage Data Centers TX22 | Vantage | Bexar | Building | 2.6 |
| Rackspace Richardson DFW3 | – | Dallas | Building | 2.6 |
| Westway Park I Data Center: HOU 1 | DataBank | Harris | Civic Returns | 2.5 |
| Amazon AWS SAT - 12807 Donop | Amazon Web Services | Bexar | Building | 2.5 |
| Digital Realty Dallas DFW16 | Digital Realty | Dallas | Building | 2.5 |
| CyrusOne San Antonio II | CyrusOne | Bexar | Building | 2.5 |
| Aligned DFW-01 | Aligned | Collin | Building | 2.5 |
| Data Foundry | – | Harris | Building | 2.4 |
| Amazon | – | Bexar | Building | 2.4 |
| Data Foundry - Texas 2 | – | Travis | Building | 2.4 |
| CyrusOne San Antonio I | CyrusOne | Bexar | Building | 2.3 |
| CyrusOne San Antonio III | CyrusOne | Bexar | Building | 2.3 |
| Lowe's Data Center | – | Bexar | Building | 2.2 |
| CyrusOne San Antonio IV | – | Bexar | Building | 2.1 |
| EdgeConneX HOU01 | EdgeConneX | Harris | Civic Returns | 2.1 |
| Prime DFW01-01 | Prime | Dallas | Building | 2.0 |
| Aligned DFW-02 | Aligned | Collin | Building | 2.0 |
| LightEdge Austin II | – | Travis | Building | 2.0 |
| Digital Realty Dallas DFW17 | Digital Realty | Dallas | Building | 1.9 |
| Lumen Dallas - 3180 Irving Blvd. | Lumen | Dallas | Building | 1.8 |
| Digital Realty Austin AUS11 | – | Travis | Building | 1.8 |
| Westway Park II Data Center: HOU 2 | DataBank | Harris | Civic Returns | 1.8 |
| Charles Schwab Data Center | – | Denton | Building | 1.8 |
| – | CyrusOne | Travis | Building | 1.8 |
| Experian McKinney Data Center | – | Collin | Building | 1.8 |
| Lumen Austin 1 | – | Travis | Building | 1.7 |
| Stream San Antonio II | – | Bexar | Building | 1.6 |
| TierPoint Dallas Data Center | TierPoint | Dallas | Building | 1.6 |
| – | Frost Bank | Bexar | Building | 1.6 |
| Flexential Dallas - Richardson | Flexential | Collin | Building | 1.6 |
| DataBank Dallas Empire Central Data Center | DataBank | Dallas | Building | 1.5 |
| Houston Galleria Data Center: HOU 5 | DataBank | Harris | Civic Returns | 1.5 |
| Element Critical | – | Travis | Building | 1.4 |
| Amazon Web Services | Amazon Web Services | Tarrant | Building | 1.2 |
| Data Foundry Austin 1 Data Center | – | Travis | Building | 1.2 |
| Live Oak Data Center | – | Dallas | Building | 1.1 |
| Prime DFW01-01 | Prime | Dallas | Building | 1.1 |
| Rellis Campus Data and Research Center | Rellis Campus Data and Research Center | Brazos | Civic Returns | 1.1 |
| DataBank | – | Dallas | Building | 1.0 |
| Novartis | – | Tarrant | Building | 1.0 |
| Westway Park III Data Center: HOU 3 | DataBank | Harris | Civic Returns | 1.0 |
| Compass Data Center | – | Ellis | Building | 1.0 |
| – | HEB | Bexar | Building | 0.8 |
| Alpheus DataCenter | – | Travis | Building | 0.8 |
| – | TierPoint | Collin | Building | 0.7 |
| CoreSpace Dallas | – | Dallas | Building | 0.7 |
| LightEdge Austin I | – | Travis | Building | 0.7 |
| Ezell Drive Campu | Amazon Web Services | Dallas | Civic Returns | 0.7 |
| Rice Data Center | – | Harris | Building | 0.6 |
| H5 Data Centers San Antonio | H5 Data Centers | Bexar | Building | 0.5 |
| Stream DFW IV | Stream Data Centers | Collin | Building | 0.5 |
| Dallas LBJ Data Center DFW7 | DataBank | Dallas | Civic Returns | 0.4 |
| Arlington Data Center | D.R. Horton | Tarrant | Civic Returns | 0.4 |
| Waco Data Center ACT1 | DataBank | McLennan | Civic Returns | 0.3 |
| Lumen Dallas 6 | Lumen | Dallas | Building | 0.3 |
| Lumen San Antonio 2 | Lumen | Bexar | Building | 0.3 |
| Dallas Love Field Data Center DFW6 | DataBank | Dallas | Civic Returns | 0.3 |
| MDC | – | El Paso | Building | 0.2 |
| Thin-nology | – | Travis | Building | 0.2 |
| Austin Data Center: AUS1 | DataBank | Williamson | Civic Returns | 0.2 |
| Willis Data Center | Comcast | Montgomery | Civic Returns | 0.1 |
| Lumen Austin 3 | Lumen | Travis | Building | 0.1 |
| BBT Midland Data Center | BBT | Midland | Civic Returns | 0.0 |
| Danik Data Center | Mahesh Patel | Dallas | Civic Returns | 0.0 |
| GVTC | GVTC | Bexar | Building | 0.0 |
| VIRTBIZ | – | Dallas | Point | – |
| Stream Data Centers Houston | – | Montgomery | Point | – |
| Precision Prints Lufkin Datacenter | – | Angelina | Point | – |
| IONIC Digital Cedarvale | IONIC Digital | Ward | Campus | – |
| IREN Sweetwater 1 | IREN | Nolan | Civic Returns | – |
| IREN Horizon 1 | IREN | Childress | Civic Returns | – |
| Sangha West Texas Site | Sangha Renewables | Ector | Civic Returns | – |
| Stream Data Center: DFW II | Stream Data Centers | Dallas | Civic Returns | – |
| Stream Data Center: DFW I | Stream Data Centers | Dallas | Civic Returns | – |
| Stream Data Center: DFW III | Stream Data Centers | Dallas | Civic Returns | – |
| Hut 8 King Mountain (crypto mining) | Hut 8 (50% JV with NextEra) | Upton | Civic Returns | – |
| 1547 MCTX1 | 1547 Critical Systems Realty | Hidalgo | Operator's own list | – |
| TACC (UT Austin) Texas Advanced Computing Center, J.J. Pickle Research Campus | TACC (UT Austin) | Travis | Operator's own list | – |
| Aligned Data Centers DFW-04 | Aligned Data Centers | Collin | Operator's own list | – |
| Aligned Data Centers LBB-01 | Aligned Data Centers | Hale | Operator's own list | – |
| Bitdeer Rockdale | Bitdeer | Milam | Operator's own list | – |
| Centersquare DFW1 | Centersquare | Tarrant | Operator's own list | – |
| Cipher Digital Black Pearl | Cipher Digital | Winkler | Operator's own list | – |
| Cogent Austin Office & Data Center | Cogent Communications | Travis | Operator's own list | – |
| Cogent Austin 2 Data Center | Cogent Communications | Travis | Operator's own list | – |
| Cogent San Antonio Edge Data Center | Cogent Communications | Bexar | Operator's own list | – |
| Cogent Austin 3 Edge Data Center | Cogent Communications | Travis | Operator's own list | – |
| Cogent Irving Data Center | Cogent Communications | Dallas | Operator's own list | – |
| Cogent Dallas 2 Data Center | Cogent Communications | Dallas | Operator's own list | – |
| Cogent Plano Edge Data Center | Cogent Communications | Collin | Operator's own list | – |
| Cogent El Paso Data Center | Cogent Communications | El Paso | Operator's own list | – |
| Cogent Abilene Edge Data Center | Cogent Communications | Taylor | Operator's own list | – |
| Cogent Amarillo Edge Data Center | Cogent Communications | Randall | Operator's own list | – |
| Cogent Midland Edge Data Center | Cogent Communications | Midland | Operator's own list | – |
| Cogent Fort Worth Data Center | Cogent Communications | Tarrant | Operator's own list | – |
| Cogent Waco Edge Data Center | Cogent Communications | McLennan | Operator's own list | – |
| Cogent Fort Worth Edge Data Center | Cogent Communications | Montague | Operator's own list | – |
| Cogent North Freeway Office & Data Center | Cogent Communications | Harris | Operator's own list | – |
| Cogent McAllen Edge Data Center | Cogent Communications | Hidalgo | Operator's own list | – |
| Cogent Corpus Christi Edge Data Center | Cogent Communications | Nueces | Operator's own list | – |
| Cogent Houston Edge Data Center | Cogent Communications | Harris | Operator's own list | – |
| Cogent Bryan Edge Data Center | Cogent Communications | Brazos | Operator's own list | – |
| ColoCrossing Dallas | ColoCrossing | Dallas | Operator's own list | – |
| Cologix DAL1 | Cologix | Dallas | Operator's own list | – |
| Core Scientific Austin 1 | Core Scientific | Travis | Operator's own list | – |
| Core Scientific Denton 1 | Core Scientific | Denton | Operator's own list | – |
| Core Scientific Cottonwood 1 & 2 | Core Scientific | Reeves | Operator's own list | – |
| Data Canopy Allen, TX | Data Canopy | Collin | Operator's own list | – |
| Data Canopy Austin, TX | Data Canopy | Travis | Operator's own list | – |
| Data Canopy Carrollton, TX (DFW) | Data Canopy | Denton | Operator's own list | – |
| Data Canopy Houston, TX | Data Canopy | Harris | Operator's own list | – |
| DataBank Dallas Infomart Data Center | DataBank | Dallas | Operator's own list | – |
| DataBank DFW11 (Red Oak Data Center) | DataBank | Ellis | Operator's own list | – |
| DataBank North Dallas Data Center | DataBank | Dallas | Operator's own list | – |
| 365 Data Centers Richardson, TX | 365 Data Centers | Dallas | Operator's own list | – |
| Digital Realty DFW10 | Digital Realty | Dallas | Operator's own list | – |
| Digital Realty DFW11 | Digital Realty | Denton | Operator's own list | – |
| Digital Realty DFW12 | Digital Realty | Dallas | Operator's own list | – |
| Digital Realty DFW26 | Digital Realty | Denton | Operator's own list | – |
| Digital Realty DFW36 | Digital Realty | Dallas | Operator's own list | – |
| Digital Realty IAH10 | Digital Realty | Harris | Operator's own list | – |
| Evocative DAL1 | Evocative | Collin | Operator's own list | – |
| Evocative DAL6 | Evocative | Collin | Operator's own list | – |
| Flexential Dallas - Downtown Dallas data center | Flexential | Dallas | Operator's own list | – |
| Google Midlothian, Texas | Ellis | Operator's own list | – | |
| HorizonIQ US - South Central (Dallas) | HorizonIQ | Collin | Operator's own list | – |
| Hut 8 Vega | Hut 8 | Potter | Operator's own list | – |
| Hut 8 King Mountain JV (50%) | Hut 8 | Upton | Operator's own list | – |
| IREN Childress | IREN | Childress | Operator's own list | – |
| LightEdge Dallas Data Center | LightEdge | Denton | Operator's own list | – |
| LightEdge Austin Data Center #1 | LightEdge | Travis | Operator's own list | – |
| Lumen El Paso, TX | Lumen | El Paso | Operator's own list | – |
| Lumen Harlingen, TX | Lumen | Cameron | Operator's own list | – |
| Lumen Laredo, TX | Lumen | Webb | Operator's own list | – |
| Lumen Lubbock, TX | Lumen | Lubbock | Operator's own list | – |
| Lumen Stratford, TX | Lumen | Sherman | Operator's own list | – |
| Lumen Waco, TX | Lumen | McLennan | Operator's own list | – |
| Lumen Wichita Falls, TX | Lumen | Wichita | Operator's own list | – |
| MARA Garden City Texas | MARA | Glasscock | Operator's own list | – |
| NTT Global Data Centers Dallas TX1 Data Center | NTT Global Data Centers | Dallas | Operator's own list | – |
| Riot Platforms Corsicana Facility | Riot Platforms | Navarro | Operator's own list | – |
| Sabey Data Centers SDC Austin | Sabey Data Centers | Williamson | Operator's own list | – |
| Soluna Project Dorothy 1A | Soluna | Briscoe | Operator's own list | – |
| TierPoint Fort Worth Data Center - Dallas | TierPoint | Denton | Operator's own list | – |
| Wowrack Dallas | Wowrack | Dallas | Operator's own list | – |
| Cipher Mining Odessa Data Center | – | Ector | EPA record | – |
| Longhorn Data Center | – | Taylor | EPA record | – |
| Sdc Dfw-Vii Data Center Phase 2 | – | Dallas | EPA record | – |
| Amazon Data Center Sh 211 | Amazon Web Services | Bexar | EPA record | – |
| Cyrusone Freestone Campus | CyrusOne | Freestone | EPA record | – |
| Cyrusone Sat 14 | CyrusOne | Medina | EPA record | – |
| Edgecore Datacenter - Fujitsu Campus Addition | – | Collin | EPA record | – |
| Abilene Data Center Buildings 9 & 10 | – | Taylor | EPA record | – |
| Abilene Data Center Buildings B9B10 | – | Taylor | EPA record | – |
| Aig Data Center | – | Potter | EPA record | – |
| Aig Technologies Data Center | – | Tarrant | EPA record | – |
| Alborz Data Center | – | Castro | EPA record | – |
| Arep Las Colinas Data Center | – | Dallas | EPA record | – |
| Aus02 Data Center | – | Bell | EPA record | – |
| Aus04 Data Center | – | Bell | EPA record | – |
| Bank Of America - Coit Data Center | – | Collin | EPA record | – |
| Bank Of America - Rtx Modular Data Center | – | Collin | EPA record | – |
| Barber Lake Data Center Project | – | Mitchell | EPA record | – |
| Beacon Point Data Center Project | – | Nueces | EPA record | – |
| Beacon Pointe Data Center | – | Nueces | EPA record | – |
| Bear Data Center | – | Andrews | EPA record | – |
| Borden County Data Center | – | Borden | EPA record | – |
| Carterville - Blockchain Data Center | – | Glasscock | EPA record | – |
| Chief Data Center | – | Andrews | EPA record | – |
| Cingular Wireless Llc - Midway Data Center(Dal3152) | – | Dallas | EPA record | – |
| Circe Permian Data Center | – | Ward | EPA record | – |
| Cisco Systems Office Building 9 Data Center | – | Collin | EPA record | – |
| Cloudburst Data Centers | – | Guadalupe | EPA record | – |
| Core Scientific Data Center Expansion | – | Denton | EPA record | – |
| Core Scientific Data Center Site 1 And 2 Denton Texas | – | Denton | EPA record | – |
| D R Horton Data Center | – | Tarrant | EPA record | – |
| Data Center Fort Worth | – | Tarrant | EPA record | – |
| Data Center Laydown Yard Dillon Rogers Phase 1 & Phase 2 | – | Taylor | EPA record | – |
| Data Center Park | – | Dallas | EPA record | – |
| Data Center Phase 1 - Early Works Package | – | Fisher | EPA record | – |
| Data Center Portable Batch Plant | – | Taylor | EPA record | – |
| Dfw Vii Data Center | – | Denton | EPA record | – |
| Edwards Aquifer Research And Data Center | – | Hays | EPA record | – |
| Energy Control And Data Center | – | Harris | EPA record | – |
| Experian Data Center | – | Collin | EPA record | – |
| Freebird Data Center | – | Milam | EPA record | – |
| Freebird Data Center | – | Milam | EPA record | – |
| Gccisd New Technology Data Center | – | Harris | EPA record | – |
| Georgetown Data Center | – | Williamson | EPA record | – |
| Goodland Data Center Offsites | – | Ellis | EPA record | – |
| Harlingen Data Center Bp | – | Cameron | EPA record | – |
| Hcsc Corporate Data Center | – | Denton | EPA record | – |
| Hewlett Packard Austin Data Center 2 | – | Travis | EPA record | – |
| Hutto Data Center Campus | – | Williamson | EPA record | – |
| King Mountain Data Center - Ne Site | – | Midland | EPA record | – |
| King Mountain Data Center - Se Site | – | Upton | EPA record | – |
| King Mountain Data Center - Sw Site | – | Upton | EPA record | – |
| Lan01 Lancaster Data Center | – | Dallas | EPA record | – |
| Lancaster Data Center | – | Dallas | EPA record | – |
| Lewisville Data Center | – | Denton | EPA record | – |
| Mfe-A-Kati 2 Data Center Development | – | Hidalgo | EPA record | – |
| Microsoft Sat 8990 Data Center Project Site | Microsoft | Medina | EPA record | – |
| Milam Data Center Building 1 | – | Milam | EPA record | – |
| Nexus Data Center - Apex Project | – | Hill | EPA record | – |
| Nexus Data Center Hubbard | – | Hill | EPA record | – |
| Nscale Data Center - Ward County | – | Ward | EPA record | – |
| Oppidan El Paso Data Center | – | El Paso | EPA record | – |
| Paris Data Center Project | – | Lamar | EPA record | – |
| Plano Data Center | – | Collin | EPA record | – |
| Project Borden County Data Center | – | Borden | EPA record | – |
| Redi-Mix Na4 Data Center Sn D0883 | – | Tarrant | EPA record | – |
| Redi-Mix Na4 Data Center Sn Do883 | – | Tarrant | EPA record | – |
| Ringo - Blockchain Data Center | – | Reagan | EPA record | – |
| Royse City Data Center | – | Hunt | EPA record | – |
| Sat 40 Data Center | – | Bexar | EPA record | – |
| Sb Energy - Orion Data Center | – | Milam | EPA record | – |
| Sharka Data Center | – | Ellis | EPA record | – |
| Srm Data Center Cbp | – | Wheeler | EPA record | – |
| Sungard Internet Data Center | – | Travis | EPA record | – |
| T-Mobile Frisco Switch Rbo Noc Data Center | – | Collin | EPA record | – |
| Qts Dfw Dc5 | QTS | Dallas | EPA record | – |
| Qts Llc | QTS | Harris | EPA record | – |
| Qts Wtx1 | QTS | Hall | EPA record | – |
| Flexential - Austin Data Center | Flexential | Travis | Overture place | – |
| Equinix Data Center | Equinix | Dallas | Overture place | – |
| Sidus Group Dallas Data Center | – | Dallas | Overture place | – |
| Centersquare Data Centers Headquarters | Centersquare | Dallas | Overture place | – |
| Compass Datacenters | Compass Datacenters | Dallas | Overture place | – |
| Secret NSA data center | – | Harris | Overture place | – |
| Trinicom Communications Data Center | – | Harris | Overture place | – |
| Quasar Data Center | – | Harris | Overture place | – |
| Equinix Data Center | Equinix | Harris | Overture place | – |
| Stream Data Centers | Stream Data Centers | Dallas | Overture place | – |
| Verizon Datacenter | – | Dallas | Overture place | – |
| Grayson Government Data Center | – | Grayson | Overture place | – |
How many data centers are in Texas?
406 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 2nd most of any state. 13 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Texas?
56 under construction and 65 planned or announced in the Civic Returns and Server Country databases; the 56 that publish a size add up to about 26.6 GW, besides 14 AI campuses tracked by Epoch AI. 2 projects have been cancelled.
Which Texas county has the most data centers?
Dallas County, with 67 operating sites, then Bexar County (51) and Taylor County (46).
Who operates data centers in Texas?
Among sites that name an operator: Cogent Communications (19), CyrusOne (16), Digital Realty (14), DataBank (13), Lumen (11).
What AI data centers are in Texas?
OpenAI Stargate Abilene in Abilene (824 MW now, 1.2 GW planned); CoreWeave Denton TX in Denton (262 MW now, 395 MW planned); Meta Temple in Temple (178 MW now, 231 MW planned); Coreweave Helios in Afton (132 MW now, 800 MW planned); Google Midlothian in Midlothian (103 MW now, 123 MW planned); Google Red Oak in Red Oak (77 MW now, 185 MW planned); Microsoft SAT40 in San Antonio (75 MW now, 106 MW planned); Microsoft SAT14 in San Antonio (47 MW now, 66 MW planned); Vantage TX1 in San Antonio (32 MW now, 179 MW planned); OpenAI Stargate Shackelford in Abilene (not yet drawing power, 2.0 GW planned); Goodnight in Claude (not yet drawing power, 1.3 GW planned); OpenAI Stargate Milam in Burlington (not yet drawing power, 1.2 GW planned); Crusoe Abilene Expansion in Abilene (not yet drawing power, 941 MW planned); Anthropic Barber Lake in Colorado City (not yet drawing power, 300 MW planned), by Epoch AI's estimates.
What do Texas households pay for electricity?
15.4¢ per kWh on average in 2025 (US: 17.2¢), up 38% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.