Data centers · Texas

Data centers in Texas

406 operating data center sites, 121 projects planned or under construction and 14 AI campuses planned to draw 8.9 GW. Texas ranks 2nd of 51 by mapped sites.

Operating sites40613 whole campuses
AI campuses141.7 GW drawn now
In the pipeline12156 under construction, 65 planned
Home price15.4¢/kWh+38% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Texas's AI data centers

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Frontier - Shackelford County Vantage Data Centers Shackelford Under construction 1.4 GW 2026
CloudBurst San Marcos GigaCenter (San Antonio Data Center I) CloudBurst (built by Evolve) Hays Under construction 1.2 GW 2026
Fermi Advanced Energy & Intelligence Campus Fermi America Carson Under construction 1.0 GW 2026
Meta El Paso Data Center Meta El Paso Under construction 1.0 GW 2028
CyrusOne / Constellation Freestone Energy Center Data Center Campus CyrusOne Freestone Under construction 760 MW 2027
Nexus - Apex DFW HB1 (Hubbard) Nexus Data Centers (tenant: Anthropic; backed by Google) Hill Under construction 600 MW 2027
PowerCampus Austin Skybox Williamson Under construction 600 MW 2026
Project Caprock Aligned Data Centers Hale Under construction 540 MW 2027
CyrusOne DFW10 CyrusOne Bosque Under construction 400 MW 2026
Pampa Natural ‑ Gas Data Center APR Energy Gray Under construction 400 MW 2026
Hut 8 Beacon Point Campus Hut 8 Nueces Under construction 352 MW 2027
PowerCampus Dallas Skybox Dallas Under construction 300 MW 2026
Rowan Cinco Data Center Rowan Digital Infrastructure Medina Under construction 300 MW 2027
Rowan Project Temple Rowan Digital Infrastructure Bell Under construction 300 MW 2027
CleanSpark Austin County AI Campus CleanSpark Austin Under construction 285 MW –
Stream Data Center: Wilmer II Hyperscale Campus (DFW C) Stream Data Centers Dallas Under construction 240 MW 2027
Stack Infrastructure DFW02 Stack Infrastructure Dallas Under construction 216 MW 2026
Pioneer Park (Phase 1 and 2) DataNovaX Wichita Under construction 202 MW –
PowerHouse Irving PowerHouse Dallas Under construction 201 MW 2026
AREP Powerhouse Las Colinas American Real Estate Partners Dallas Under construction 200 MW 2027

Local pushback

Bans and moratoriums

10 recorded as enacted, 8 proposed or under review, 5 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Austin · Travis Local Proposed Aug 27, 2026 Term not documented
San Antonio · Bexar Local Rejected Aug 26, 2026 Term not documented
Athens · Henderson Local Enacted Aug 23, 2026 No end date by design — a permanent ban or standing statute
Fort Worth · Tarrant Local Proposed Aug 11, 2026 Term not documented
Lavon · Collin Local Expired Aug 7, 2026 to Nov 5, 2026
Denton · Denton Local Proposed Aug 5, 2026 Term not documented
Lubbock · Lubbock Local Proposed Aug 3, 2026 Term not documented
Texas (Abbott directive) · Travis State Enacted Aug 3, 2026 Runs until a condition is met, not to a date
San Marcos · Hays Local Enacted Jun 16, 2026 No end date by design — a permanent ban or standing statute
Hill County · Hill Local Rescinded Jun 4, 2026 Term not documented
Harlingen · Cameron Local Enacted May 1, 2026 A stated duration, but the end date isn't recorded here
Hood County · Hood County Rejected Feb 25, 2026 Term not documented
Mesquite · Dallas Local Proposed Jan 1, 2026 Term not documented
Princeton · Collin Local Enacted Jan 1, 2026 No end date by design — a permanent ban or standing statute
Milam County · Milam County Enacted Jan 1, 2026 Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Dallas County679.5 h
Bexar County513.3 h
Taylor County468.4 h
Collin County305.3 h
Travis County277.9 h
Harris County2616 h
Tarrant County195.4 h
Ellis County197.7 h
Denton County164.5 h
Milam County615 h

Every named site

The list

319 of 406 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
DFW2-DC1 Project – Dallas Campus 194
Microsoft Texas Research Park Campus Microsoft Bexar Campus, 6 buildings 166
Argo Data Center – Dickens Campus 145
Fort Worth Data Center Meta Tarrant Civic Returns 57
MARA Data Center Marathon Digital Holdings Hood Campus 40
Vantage San Antonio I Vantage Bexar Campus, 3 buildings 38
CyrusOne SAT10 & SAT11 CyrusOne Bexar Campus, 2 buildings 21
Facebook Fort Worth Datacenter Meta Tarrant Building 17
CyrusOne DFW1 CyrusOne Denton Civic Returns 15
DataBank Plano Data Center DataBank Collin Campus 15
Facebook Fort Worth Datacenter Meta Tarrant Building 15
Microsoft San Antonio Microsoft Bexar Building 11
Texas Cryptologic Center National Security Agency Bexar Campus, 3 buildings 10
Facebook Fort Worth Datacenter Meta Tarrant Building 10.0
Core Scientific: Denton 1 Core Scientific Denton Civic Returns 9.7
Cortex supercomputer – Travis Building 9.3
– DXC Technology Harris Building 8.1
Skybox Houston One Skybox Harris Campus 7.9
– CyrusOne Collin Building 7.8
Stark Infrastructure DFW01A STACK Infrastructure Collin Civic Returns 7.3
Core Scientific: Austin 1 Core Scientific Travis Civic Returns 7.2
Cyxtera Dallas-Fort Worth Data Center Cyxtera Tarrant Building 7.0
QTS Irving - Dallas Data Center Campus QTS Dallas Building 7.0
Google Google Ellis Building 6.6
Google Google Ellis Building 6.5

How many data centers are in Texas?

406 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 2nd most of any state. 13 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Texas?

56 under construction and 65 planned or announced in the Civic Returns and Server Country databases; the 56 that publish a size add up to about 26.6 GW, besides 14 AI campuses tracked by Epoch AI. 2 projects have been cancelled.

Which Texas county has the most data centers?

Dallas County, with 67 operating sites, then Bexar County (51) and Taylor County (46).

Who operates data centers in Texas?

Among sites that name an operator: Cogent Communications (19), CyrusOne (16), Digital Realty (14), DataBank (13), Lumen (11).

What AI data centers are in Texas?

OpenAI Stargate Abilene in Abilene (824 MW now, 1.2 GW planned); CoreWeave Denton TX in Denton (262 MW now, 395 MW planned); Meta Temple in Temple (178 MW now, 231 MW planned); Coreweave Helios in Afton (132 MW now, 800 MW planned); Google Midlothian in Midlothian (103 MW now, 123 MW planned); Google Red Oak in Red Oak (77 MW now, 185 MW planned); Microsoft SAT40 in San Antonio (75 MW now, 106 MW planned); Microsoft SAT14 in San Antonio (47 MW now, 66 MW planned); Vantage TX1 in San Antonio (32 MW now, 179 MW planned); OpenAI Stargate Shackelford in Abilene (not yet drawing power, 2.0 GW planned); Goodnight in Claude (not yet drawing power, 1.3 GW planned); OpenAI Stargate Milam in Burlington (not yet drawing power, 1.2 GW planned); Crusoe Abilene Expansion in Abilene (not yet drawing power, 941 MW planned); Anthropic Barber Lake in Colorado City (not yet drawing power, 300 MW planned), by Epoch AI's estimates.

What do Texas households pay for electricity?

15.4¢ per kWh on average in 2025 (US: 17.2¢), up 38% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.