Wind power plant · Shackelford, TX

Mesquite Wind Power LLC

Mesquite Wind Power LLC is a 200 MW wind power plant in Shackelford County, Texas, operated by Mesquite Wind LLC. Its oldest generator still running came online in 2007. In 2025 it generated 346 GWh, about what 26,000 average Texas homes use in a year.

Capacity200 MWNameplate, September 2026
Generated346 GWhIn 2025
Capacity factor20%Share of the most it could make, 2025
Generators1Oldest from 2007

Mesquite Wind Power LLC in context

Among the 230 wind plants in Texas in the EIA's inventory, it is the 98th largest, about 0.4% of the state's 45 GW of wind capacity.

Shackelford County has 3 power plants of 1 MW or more with 566 MW in all; Mesquite Wind Power LLC is 35% of that and the largest of 3 wind plants there.

Its capacity factor of 20% in 2025 is lower than the 32% typical for wind plants across the US.

The average electricity customer in Shackelford County goes 11 hours a year without power, the 108th most of 240 counties in Texas. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

020040060020182019202020212022202320242025GWh 346
02004006002019202120232025346

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Mesquite Wind Power LLC (outlined) and other plants in Shackelford County, shaded. 32.626, -99.493.

Plant facts

Operator
Mesquite Wind LLC
Sector
IPP Non-CHP
Grid operator
ERCO
County
Shackelford County, TX
EIA plant ID
56395
Where Texas's power comes from → Texas power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
1 Onshore Wind Turbine 200 MW 2007 –

Nearby

Other plants in Shackelford County

Questions

Mesquite Wind Power LLC, answered

How much power does Mesquite Wind Power LLC produce?

Mesquite Wind Power LLC has 200 MW of capacity from one generator. In 2025 it generated 346 GWh, 20% of the most it could have made running flat out all year (its capacity factor).

How many homes does Mesquite Wind Power LLC power?

Its 2025 output of 346 GWh equals the yearly electricity use of about 26,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Mesquite Wind Power LLC?

Mesquite Wind Power LLC is in Shackelford County, Texas, at about 32.626°, -99.493°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Shackelford County goes 11 hours a year without power, the 108th most of 240 counties in Texas. The county's page has the full outage record.

Who operates Mesquite Wind Power LLC?

It is operated by Mesquite Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.

When did Mesquite Wind Power LLC open?

Its oldest generator still running came online in 2007.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.