Wind power plant · Shackelford, TX
Post Oak Wind LLC
Post Oak Wind LLC is a 200 MW wind power plant in Shackelford County, Texas, operated by Mesquite Wind LLC. Its oldest generator still running came online in 2008. In 2025 it generated 414 GWh, about what 31,000 average Texas homes use in a year.
Post Oak Wind LLC in context
Among the 230 wind plants in Texas in the EIA's inventory, it is the 99th largest, about 0.4% of the state's 45 GW of wind capacity.
Shackelford County has 3 power plants of 1 MW or more with 566 MW in all; Post Oak Wind LLC is 35% of that and the 2nd largest of 3 wind plants there.
Its capacity factor of 24% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Shackelford County goes 11 hours a year without power, the 108th most of 240 counties in Texas. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Post Oak Wind LLC (outlined) and other plants in Shackelford County, shaded. 32.514, -99.656.
Plant facts
- Operator
- Mesquite Wind LLC
- Sector
- IPP Non-CHP
- Grid operator
- ERCO
- County
- Shackelford County, TX
- EIA plant ID
- 56483
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 200 MW | 2008 | – |
Nearby
Other plants in Shackelford County
Questions
Post Oak Wind LLC, answered
How much power does Post Oak Wind LLC produce?
Post Oak Wind LLC has 200 MW of capacity from one generator. In 2025 it generated 414 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Post Oak Wind LLC power?
Its 2025 output of 414 GWh equals the yearly electricity use of about 31,000 average Texas homes (1,110 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Post Oak Wind LLC?
Post Oak Wind LLC is in Shackelford County, Texas, at about 32.514°, -99.656°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Shackelford County goes 11 hours a year without power, the 108th most of 240 counties in Texas. The county's page has the full outage record.
Who operates Post Oak Wind LLC?
It is operated by Mesquite Wind LLC (EIA sector: IPP Non-CHP), and it feeds ERCOT, the Texas grid.
When did Post Oak Wind LLC open?
Its oldest generator still running came online in 2008.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Texas home's 1,110 kWh a month in 2025. Methodology.