Data centers · Oklahoma

Data centers in Oklahoma

23 operating data center sites, 17 projects planned or under construction and 2 AI campuses planned to draw 623 MW.

Operating sites230 whole campuses
AI campuses2368 MW drawn now
In the pipeline178 under construction, 9 planned
Home price13.2¢/kWh+28% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Oklahoma's AI data centers

CampusOwnerWhereNowPlanned
Google Pryor (North)GoogleMayes County368 MW442 MW
CoreWeave Muskogee OKCoreWeaveMuskogee County–181 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Polaris Technologies Bitcoin Mining Data Center Polaris Technologies Inc. Muskogee Under construction 200 MW 2025
Core Scientific: Muskogee 1 Core Scientific Muskogee Under construction 100 MW 2026
Google Stillwater, Oklahoma Google Payne Under construction – –
Google Tulsa, Oklahoma Google Tulsa Under construction – –
Meta Tulsa Data Center Meta Tulsa Under construction – –
Project Anthem Meta Wagoner Under construction – 2028
Project Clydesdale Quartz Mountain Properties LLC Tulsa Under construction – 2027
Project Clydesdale (Tulsa County/Owasso) Beale Infrastructure Tulsa Under construction – unkn
Potentia Oklahoma Campus 02 Potentia Inc. Rogers Planned 2.0 GW 2027
Project Open Sky Cloverleaf Infrastructure Canadian Planned 1.5 GW –
Beltline Energy Yukon Data Center Beltline Energy Canadian Planned 500 MW –
Project Mustang Claremore Data Center Beale Infrastructure Rogers Planned 450 MW 2028
BLE Landholdings Piedmont Data Center BLE Landholdings LLC Canadian Planned – –
Beltline Energy Luther Data Center Beltline Energy Oklahoma Planned – –
Google Muskogee County Data Center Campuses Google Muskogee Planned – –
Google Project Spring Sand Springs Data Center Google Tulsa Planned – 2029
Google Stillwater Google Payne Planned – 2028
Project Atlas Coweta Data Center Beale Infrastructure Wagoner Cancelled 400 MW –
Broken Arrow East Data Center Prospect Unknown Tulsa Cancelled – –

Local pushback

Bans and moratoriums

13 recorded as enacted, 0 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Shawnee · Pottawatomie City Enacted Aug 19, 2026 to Dec 31, 2027
Cherokee Nation · Cherokee Tribal Enacted Aug 10, 2026 No end date by design — a permanent ban or standing statute
Choctaw · Oklahoma City Enacted Jul 21, 2026 to Jul 21, 2027
Kickapoo Tribe of Oklahoma · Lincoln Tribal Enacted Jul 1, 2026 No end date by design — a permanent ban or standing statute
Norman · Cleveland Local Enacted Jun 23, 2026 to Jun 9, 2027
Luther · Oklahoma Local Enacted Jun 17, 2026 to Dec 31, 2026
Broken Arrow · Tulsa Local Enacted Jun 15, 2026 to Dec 31, 2026
Edmond · Oklahoma Local Enacted Jun 8, 2026 to Dec 31, 2026
Choctaw County · Choctaw County Enacted May 18, 2026 to May 18, 2027
Oklahoma (SB 1488) · Oklahoma State Rejected May 14, 2026 No end date by design — a permanent ban or standing statute
Oklahoma City · Oklahoma Local Enacted Apr 22, 2026 to Dec 31, 2026
Pawhuska · Osage City Enacted Apr 14, 2026 to Dec 31, 2026
Tulsa · Tulsa Local Enacted Mar 25, 2026 to Dec 31, 2026
Seminole Nation of Oklahoma · Pottawatomie Local Enacted Jan 1, 2026 No end date by design — a permanent ban or standing statute

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Tulsa County108.4 h
Oklahoma County617 h
Muskogee County16.2 h
Bryan County17.7 h
Mayes County17.6 h
Creek County16.9 h
Canadian County18.4 h
Kingfisher County112 h
Latimer County111 h

Every named site

The list

21 of 23 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Cherokee Data Center – Tulsa Building 9.5
Tierpoint Oklahoma City Data OKC 2 TierPoint Oklahoma Civic Returns 1.6
Tierpoint Oklahoma City Data OKC TierPoint Oklahoma Civic Returns 0.5
TierPoint – Tulsa Building 0.4
Choctaw Nation of Oklahoma Data Center – Bryan Building 0.3
Rack59 Data Center – Oklahoma Point –
TulsaConnect DC3 – Tulsa Point –
TulsaConnect – Tulsa Point –
Windstream – Tulsa Point –
TulsaConnect – Tulsa Point –
OCOSA – Tulsa Point –
Pryor Creek Campus Google Mayes Civic Returns –
Cogent Oklahoma City Data Center Cogent Communications Oklahoma Operator's own list –
Cogent Tulsa Edge Data Center Cogent Communications Creek Operator's own list –
Cogent Oklahoma City Edge Data Center Cogent Communications Canadian Operator's own list –
Lumen Tulsa, OK Lumen Tulsa Operator's own list –
TierPoint Tulsa - State Farm Data Center TierPoint Tulsa Operator's own list –
Edgex Data Centers Llc / 4442 Newcastle Rd – Oklahoma EPA record –
Hertz Data Center – Oklahoma EPA record –
Pioneer Telephone Coop Inc / Kingfisher Data Center I Ii – Kingfisher EPA record –
Talihina Data Center – Latimer EPA record –

How many data centers are in Oklahoma?

23 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 31st most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Oklahoma?

8 under construction and 9 planned or announced in the Civic Returns and Server Country databases; the 6 that publish a size add up to about 4.8 GW, besides 2 AI campuses tracked by Epoch AI. 2 projects have been cancelled.

Which Oklahoma county has the most data centers?

Tulsa County, with 10 operating sites, then Oklahoma County (6) and Muskogee County (1).

Who operates data centers in Oklahoma?

Among sites that name an operator: TierPoint (3), Cogent Communications (3), Google (1), Lumen (1).

What AI data centers are in Oklahoma?

Google Pryor (North) in Pryor (368 MW now, 442 MW planned); CoreWeave Muskogee OK in Muskogee (not yet drawing power, 181 MW planned), by Epoch AI's estimates.

What do Oklahoma households pay for electricity?

13.2¢ per kWh on average in 2025 (US: 17.2¢), up 28% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.