AI data center · Pryor, Oklahoma

Google Pryor (North)

Google's AI campus in Mayes County. It draws about 368 MW today and is planned to reach 442 MW by September 2026.

Power now368 MWAs of Sep 6, 2026
Planned peak442 MWSeptember 2026
Compute637kH100-equivalent chips now
Capital cost$14BSo far, 2025 dollars

Latest look · Sep 6, 2026

What the satellite shows

Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW400 MW500 MW20252026
Power drawn by Google Pryor (North), from Epoch AI's dated observations.
0 MW100 MW200 MW300 MW400 MW500 MW20252026
Power drawn by Google Pryor (North), from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Google
Used by
Google DeepMind (speculative)
Chips
TPU v5p, TPU v5e
Water use
2.28 million gallons a day (Epoch AI estimate)
Address
4581 Webb St, Pryor, OK 74361
County
Mayes County

Where

On the map of Oklahoma

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
GREC● Natural gas1.79 GW4.2 mi
Chouteau● Natural gas1.07 GW3.2 mi
Salina● Storage259 MW12.7 mi
Twelvemile Solar 1● Solar152 MW8.4 mi
Markham● Hydro128 MW8.3 mi
Huckleberry Solar● Solar125 MW3.9 mi
Mayes County Solar● Solar102 MW6.3 mi
Saltbranch Solar 1● Solar73 MW8.4 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Sep 6, 2026Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.442 MW
May 26, 2026Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.63 MW
Oct 19, 2025The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.63 MW
Jan 28, 2025Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).63 MW
Jul 19, 2024Building 1 is operational, based on default roof-to-operational time.63 MW

How much power does Google Pryor (North) use?

About 368 MW as of Sep 6, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 442 MW in its build plans by September 2026. Running all year, 368 MW would use about 3.2 TWh.

Who owns Google Pryor (North)?

Google; used by Google DeepMind (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Google Pryor (North)?

In Mayes County, the average customer is without power about 7.6 hours in a typical year in this site's outage record, with 18 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Google Pryor (North)?

8 plants within 15 miles total about 3.82 GW; the largest is GREC (1.79 GW, natural gas), 4.2 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.