Where the power comes from · 2025
Oklahoma
Natural gas made 44% of the electricity generated in Oklahoma in 2025, the 19th highest natural gas share of any state. In 2005, coal made 53% of it; in 2025, 10%.
The mix
Oklahoma's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
Oklahoma's power plants
151 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in Oklahoma, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
Oklahoma's power plants emitted 306 kg of CO₂ for each MWh they generated in 2024, against 758 kg in 2005: the 21st lowest of 51. 29 million metric tons in all.
Oklahoma among the states
- Generation89.9 TWh18th
- Renewable share45%12th
- Carbon-free share45%24th
- Cleanest electricity (kg CO₂/MWh, 2024)30621st
- Natural gas share44%19th
- Wind share41%4th
- Coal share10%27th
- Hydro share2.7%25th
Plants
The largest plants in Oklahoma
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| GREC | Natural gas | Mayes | 1.8 GW | 4.0 TWh | – | 1985 |
| Muskogee | Natural gas | Muskogee | 1.7 GW | 2.9 TWh | 19% | 1977 |
| Seminole (OK) | Natural gas | Seminole | 1.7 GW | 2.0 TWh | 13% | 1971 |
| Northeastern | Natural gas | Rogers | 1.5 GW | 5.0 TWh | 39% | 1961 |
| Redbud Power Plant | Natural gas | Oklahoma | 1.4 GW | 4.3 TWh | 35% | 2004 |
| Kiamichi Energy Facility | Natural gas | Pittsburg | 1.4 GW | 5.2 TWh | 44% | 2003 |
| Oneta Energy Center | Natural gas | Wagoner | 1.2 GW | 4.8 TWh | 45% | 2002 |
| Sooner | Coal | Noble | 1.1 GW | 2.9 TWh | 29% | 1979 |
| Riverside (OK) | Natural gas | Tulsa | 1.1 GW | 746 GWh | 8% | 1974 |
| Chouteau | Natural gas | Mayes | 1.1 GW | 5.6 TWh | 59% | 2000 |
| Traverse Wind Project, LLC | Wind | Custer | 999 MW | 3.1 TWh | 36% | 2022 |
| Green Country Power Station | Natural gas | Tulsa | 904 MW | 3.7 TWh | 46% | 2002 |
| Skeleton Creek Energy Center Hybrid | Storage | Garfield | 752 MW | 899 GWh | – | 2020 |
| Southwestern | Natural gas | Caddo | 658 MW | 454 GWh | 8% | 1952 |
| Wagon Wheel Wind | Wind | Logan | 598 MW | 181 GWh | – | 2025 |
| Horseshoe Lake | Natural gas | Oklahoma | 564 MW | 443 GWh | 9% | 1969 |
| McClain Energy Facility | Natural gas | McClain | 551 MW | 1.4 TWh | 28% | 2001 |
| Anadarko Plant | Natural gas | Caddo | 540 MW | 661 GWh | 14% | 1977 |
| Mustang | Natural gas | Canadian | 465 MW | 491 GWh | 12% | 2015 |
| Hugo | Coal | Choctaw | 446 MW | 1.6 TWh | 41% | 1982 |
| Frontier Windpower II | Wind | Kay | 352 MW | 545 GWh | 18% | 2021 |
| River Valley | Coal | Le Flore | 350 MW | 474 GWh | 16% | 1990 |
| Tulsa | Natural gas | Tulsa | 348 MW | 295 GWh | 10% | 1956 |
| Spring Creek Energy Center | Natural gas | Logan | 346 MW | 124 GWh | 4% | 2001 |
| Mooreland | Natural gas | Woodward | 305 MW | 160 GWh | 6% | 1964 |
| Diamond Spring, LLC | Wind | Johnston | 304 MW | 733 GWh | 28% | 2020 |
| Caddo Wind | Wind | Caddo | 303 MW | 984 GWh | 37% | 2022 |
| Seven Cowboy Wind Project, LLC | Wind | Washita | 302 MW | 1.2 TWh | 44% | 2023 |
| Chisholm View Wind Project | Wind | Garfield | 300 MW | 857 GWh | 33% | 2012 |
| Balko Wind LLC | Wind | Beaver | 300 MW | 802 GWh | 31% | 2015 |
| Red Dirt Wind Project | Wind | Kingfisher | 299 MW | 778 GWh | 30% | 2017 |
| Kay Wind, LLC | Wind | Kay | 299 MW | 799 GWh | 31% | 2015 |
| Kingfisher Wind LLC | Wind | Kingfisher | 298 MW | 956 GWh | 37% | 2016 |
| Thunder Ranch Wind Project | Wind | Noble | 298 MW | 805 GWh | 31% | 2017 |
| Comanche (OK) | Natural gas | Comanche | 294 MW | 331 GWh | 13% | 1962 |
| Canadian Hills Wind | Wind | Canadian | 294 MW | 446 GWh | 17% | 2012 |
| Maverick Wind Project, LLC | Wind | Major | 288 MW | 856 GWh | 34% | 2021 |
| Salina | Storage | Mayes | 259 MW | -33.8 GWh | – | 1968 |
| 25 Mile Creek | Wind | Ellis | 250 MW | 1.1 TWh | 49% | 2023 |
| Rush Springs Wind | Wind | Stephens | 250 MW | 902 GWh | 41% | 2016 |
| King Plains Wind Project | Wind | Garfield | 248 MW | 593 GWh | 27% | 2020 |
| Armadillo Flats Wind Project, LLC | Wind | Garfield | 247 MW | 750 GWh | 35% | 2018 |
| Crossroads Wind Farm | Wind | Dewey | 228 MW | 375 GWh | 19% | 2012 |
| Mammoth Plains | Wind | Dewey | 226 MW | 623 GWh | 32% | 2014 |
| Great Western Wind Energy, LLC | Wind | Ellis | 225 MW | 885 GWh | 45% | 2016 |
| Willow Creek Wind (OK) | Wind | Noble | 220 MW | 149 GWh | – | 2025 |
| Horizon Hill Wind Project | Wind | Logan | 202 MW | 624 GWh | 35% | 2024 |
| White Rock East Wind Project | Wind | Caddo | 202 MW | 683 GWh | 39% | 2024 |
| Goodwell Wind Project LLC | Wind | Texas | 200 MW | 701 GWh | 40% | 2015 |
| Frontier Windpower | Wind | Kay | 200 MW | 485 GWh | 28% | 2016 |
| Ponderosa Wind Energy Center | Wind | Beaver | 200 MW | 911 GWh | 52% | 2020 |
| Seiling Wind I | Wind | Dewey | 199 MW | 454 GWh | 26% | 2014 |
| Sundance Wind Project, LLC | Wind | Woods | 199 MW | 566 GWh | 33% | 2021 |
| Persimmon Creek Wind Farm 1, LLC | Wind | Woodward | 199 MW | 826 GWh | 48% | 2018 |
| Elk City LLC | Wind | Roger Mills | 198 MW | 527 GWh | 30% | 2009 |
| Bluestem | Wind | Beaver | 198 MW | 759 GWh | 44% | 2016 |
| Tinker | Natural gas | Oklahoma | 178 MW | 10 GWh | – | 1971 |
| Rock Falls Wind Farm LLC | Wind | Kay | 155 MW | 374 GWh | 28% | 2017 |
| Twelvemile Solar 1 | Solar | Mayes | 152 MW | – | – | 2026 |
| Keenan II Renewable Energy Co LLC | Wind | Woodward | 152 MW | 247 GWh | 19% | 2010 |
| Grant Wind, LLC | Wind | Grant | 152 MW | 496 GWh | 37% | 2016 |
| Blue Canyon Windpower II | Wind | Comanche | 151 MW | 566 GWh | 43% | 2005 |
| Osage Wind, LLC | Wind | Osage | 150 MW | 480 GWh | 37% | 2015 |
| Origin Wind | Wind | Murray | 150 MW | 296 GWh | 23% | 2014 |
| Rocky Ridge Wind Project | Wind | Kiowa | 149 MW | 322 GWh | 25% | 2012 |
| Boiling Springs Wind Farm | Wind | Woodward | 148 MW | 577 GWh | 44% | 2020 |
| Pontotoc Wind | Wind | Pontotoc | 148 MW | – | – | 2026 |
| Grant Plains Wind, LLC | Wind | Grant | 147 MW | 473 GWh | 37% | 2016 |
| Weatherford Wind Energy Center | Wind | Custer | 147 MW | 610 GWh | 47% | 2005 |
| Rockhaven Wind Project, LLC | Wind | Murray | 140 MW | 470 GWh | 38% | 2021 |
| Ponca City | Natural gas | Kay | 134 MW | 32 GWh | 3% | 1966 |
| Dempsey Ridge Wind Farm | Wind | Roger Mills | 132 MW | 118 GWh | 10% | 2012 |
| Frontier | Natural gas | Oklahoma | 131 MW | 525 GWh | 46% | 1989 |
| Pensacola | Hydro | Mayes | 130 MW | 422 GWh | 37% | 1940 |
| Taloga Wind LLC | Wind | Dewey | 130 MW | 188 GWh | 17% | 2011 |
| Minco Wind IV, LLC | Wind | Canadian | 130 MW | 517 GWh | 45% | 2018 |
| Markham | Hydro | Mayes | 128 MW | 288 GWh | 26% | 1964 |
| Huckleberry Solar | Solar | Mayes | 125 MW | – | – | 2026 |
| Red Hills Wind Project LLC | Wind | Roger Mills | 123 MW | 190 GWh | 18% | 2008 |
| Charles D. Lamb Energy Center | Natural gas | Kay | 122 MW | 118 GWh | 11% | 2015 |
| Centennial Wind Farm | Wind | Harper | 120 MW | 157 GWh | 15% | 2006 |
| North Fork Solar Project | Solar | Kiowa | 120 MW | 294 GWh | 28% | 2024 |
| Glass Sands Wind Facility | Wind | Murray | 117 MW | 421 GWh | 41% | 2021 |
| Georgia-Pacific Muskogee | Natural gas | Muskogee | 114 MW | 369 GWh | 37% | 1979 |
| Weleetka | Natural gas | Okfuskee | 110 MW | 13 GWh | 1% | 1963 |
| Robert S Kerr | Hydro | Sequoyah | 110 MW | 450 GWh | 47% | 1971 |
| Drift Sand Wind Project LLC | Wind | Grady | 108 MW | 344 GWh | 36% | 2016 |
| Oklahoma Wind Energy Center | Wind | Woodward | 102 MW | 141 GWh | 16% | 2003 |
| Mayes County Solar | Solar | Mayes | 102 MW | – | – | 2026 |
| OU Spirit Wind Farm | Wind | Woodward | 101 MW | 127 GWh | 14% | 2009 |
| Minco Wind II, LLC | Wind | Grady | 101 MW | 323 GWh | 37% | 2011 |
| Minco Wind III, LLC | Wind | Caddo | 101 MW | 449 GWh | 51% | 2012 |
| Broken Bow Dam | Hydro | McCurtain | 100 MW | 196 GWh | 22% | 1970 |
| Arbuckle Mountain Wind Farm LLC | Wind | Murray | 100 MW | 292 GWh | 33% | 2015 |
| Wildhorse Mountain Wind Facility | Wind | Pushmataha | 100 MW | 382 GWh | 44% | 2019 |
| Ponderosa Wind II | Wind | Beaver | 100 MW | 449 GWh | 51% | 2024 |
| Kiowa County Solar Project | Solar | Kiowa | 100 MW | 236 GWh | – | 2025 |
| Blue Canyon Windpower VI LLC | Wind | Caddo | 100 MW | 212 GWh | 24% | 2011 |
| White Rock West Wind Project | Wind | Caddo | 100 MW | 362 GWh | 42% | 2023 |
| Minco Wind I, LLC | Wind | Grady | 99 MW | 326 GWh | 38% | 2010 |
Coming next
Planned projects
The largest generators reported as planned in Oklahoma, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Ripley Energy Center | Natural gas | Payne | 419 MW | 2027 |
| Comanche (OK) | Natural gas | Comanche | 409 MW | 2029 |
| Comanche (OK) | Natural gas | Comanche | 409 MW | 2029 |
| High Spring Solar Energy | Solar | Muskogee | 400 MW | 2027 |
| Comanche (OK) | Natural gas | Comanche | 278 MW | 2029 |
| Comanche (OK) | Natural gas | Comanche | 278 MW | 2029 |
| Roy Solar | Solar | Stephens | 258 MW | 2027 |
| Rumble Solar | Solar | Grady | 250 MW | 2026 |
| Horseshoe Lake | Natural gas | Oklahoma | 224 MW | 2026 |
| Horseshoe Lake | Natural gas | Oklahoma | 224 MW | 2026 |
| Horseshoe Lake | Natural gas | Oklahoma | 224 MW | 2029 |
| Horseshoe Lake | Natural gas | Oklahoma | 224 MW | 2029 |
| Rush Springs Solar | Solar | Stephens | 200 MW | 2026 |
| Twelvemile Solar 3 | Solar | Mayes | 200 MW | 2026 |
| Willow Creek Energy Storage | Storage | Pawnee | 200 MW | 2026 |
| Solstice Solar LLC | Storage | Le Flore | 200 MW | 2029 |
| Solstice Solar LLC | Solar | Le Flore | 200 MW | 2029 |
| Mammoth Plains Energy Storage | Storage | Dewey | 150 MW | 2027 |
| Panhandle Solar | Solar | Texas | 102 MW | 2026 |
| Mammoth Plains Energy Storage II | Storage | Dewey | 101 MW | 2029 |
| Fiddle Leaf Solar, LLC | Solar | Delaware | 80 MW | 2027 |
Shut down
Retired since 2010
The largest generators retired in Oklahoma since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| GREC | Coal | 540 MW | 2020 |
| Northeastern | Coal | 473 MW | 2016 |
| Mustang | Natural gas | 253 MW | 2017 |
| Horseshoe Lake | Natural gas | 220 MW | 2024 |
| Muskogee | Natural gas | 173 MW | 2010 |
| Horseshoe Lake | Natural gas | 163 MW | 2024 |
| Mustang | Natural gas | 133 MW | 2017 |
| Tulsa | Natural gas | 95 MW | 2012 |
| Mustang | Natural gas | 82 MW | 2015 |
| KODE Novus I | Wind | 80 MW | 2022 |
| Mustang | Natural gas | 63 MW | 2015 |
| Weleetka | Natural gas | 53 MW | 2019 |
| Anadarko Plant | Natural gas | 50 MW | 2024 |
| Ponca | Natural gas | 48 MW | 2022 |
| KODE Novus II | Wind | 40 MW | 2022 |
| Horseshoe Lake | Natural gas | 27 MW | 2017 |
| Seminole (OK) | Natural gas | 23 MW | 2015 |
| Anadarko Plant | Natural gas | 17 MW | 2024 |
| Anadarko Plant | Natural gas | 17 MW | 2024 |
| Enid | Natural gas | 15 MW | 2012 |
| Enid | Natural gas | 15 MW | 2012 |
| Enid | Natural gas | 15 MW | 2012 |
| Enid | Natural gas | 15 MW | 2012 |
| Boomer Lake Station | Natural gas | 13 MW | 2016 |
| Woodward | Natural gas | 11 MW | 2012 |
| Boomer Lake Station | Natural gas | 10 MW | 2015 |
| Oklahoma State University | Natural gas | 5.0 MW | 2017 |
| Ponca City Refinery | Other | 4.0 MW | 2010 |
| Ponca City Refinery | Other | 4.0 MW | 2010 |
| Nine Mile Gas Processing Plant | Natural gas | 2.8 MW | 2016 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.