Wind power plant · Garfield, OK

Breckinridge Wind Project LLC

Breckinridge Wind Project LLC is a 99 MW wind power plant in Garfield County, Oklahoma, operated by NextEra Energy Resources Breckinridge. Its oldest generator still running came online in 2015. In 2025 it generated 292 GWh, about what 23,000 average Oklahoma homes use in a year.

Capacity99 MWNameplate, September 2026
Generated292 GWhIn 2025
Capacity factor34%Share of the most it could make, 2025
Generators1Oldest from 2015

Breckinridge Wind Project LLC in context

Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 64th largest, about 0.7% of the state's 13 GW of wind capacity.

Garfield County has 7 power plants of 1 MW or more with 1.7 GW in all; Breckinridge Wind Project LLC is 6% of that and the 4th largest of 4 wind plants there.

Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Garfield County goes 4.5 hours a year without power, the 59th most of 75 counties in Oklahoma. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 292
01002003004005002019202120232025292

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Breckinridge Wind Project LLC (outlined) and other plants in Garfield County, shaded. 36.477, -97.686.

Plant facts

Operator
NextEra Energy Resources Breckinridge
Sector
IPP Non-CHP
Grid operator
SWPP
County
Garfield County, OK
EIA plant ID
58994
Where Oklahoma's power comes from → Oklahoma power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
BWP Onshore Wind Turbine 99 MW 2015 –

Questions

Breckinridge Wind Project LLC, answered

How much power does Breckinridge Wind Project LLC produce?

Breckinridge Wind Project LLC has 99 MW of capacity from one generator. In 2025 it generated 292 GWh, 34% of the most it could have made running flat out all year (its capacity factor).

How many homes does Breckinridge Wind Project LLC power?

Its 2025 output of 292 GWh equals the yearly electricity use of about 23,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Breckinridge Wind Project LLC?

Breckinridge Wind Project LLC is in Garfield County, Oklahoma, at about 36.477°, -97.686°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Garfield County goes 4.5 hours a year without power, the 59th most of 75 counties in Oklahoma. The county's page has the full outage record.

Who operates Breckinridge Wind Project LLC?

It is operated by NextEra Energy Resources Breckinridge (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Breckinridge Wind Project LLC open?

Its oldest generator still running came online in 2015.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.