Wind power plant · Grady, OK

Drift Sand Wind Project LLC

Drift Sand Wind Project LLC is a 108 MW wind power plant in Grady County, Oklahoma, operated by Enel Green Power NA, Inc.. Its oldest generator still running came online in 2016. In 2025 it generated 344 GWh, about what 27,000 average Oklahoma homes use in a year.

Capacity108 MWNameplate, September 2026
Generated344 GWhIn 2025
Capacity factor36%Share of the most it could make, 2025
Generators1Oldest from 2016

Drift Sand Wind Project LLC in context

Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 51st largest, about 0.8% of the state's 13 GW of wind capacity.

Grady County has 7 power plants of 1 MW or more with 486 MW in all; Drift Sand Wind Project LLC is 22% of that and the largest of 4 wind plants there.

Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.

The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010020030040050020182019202020212022202320242025GWh 344
01002003004005002019202120232025344

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Drift Sand Wind Project LLC (outlined) and other plants in Grady County, shaded. 34.828, -97.957.

Plant facts

Operator
Enel Green Power NA, Inc.
Sector
IPP Non-CHP
Grid operator
SWPP
County
Grady County, OK
EIA plant ID
59065
Where Oklahoma's power comes from → Oklahoma power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
WT1 Onshore Wind Turbine 108 MW 2016 –

Questions

Drift Sand Wind Project LLC, answered

How much power does Drift Sand Wind Project LLC produce?

Drift Sand Wind Project LLC has 108 MW of capacity from one generator. In 2025 it generated 344 GWh, 36% of the most it could have made running flat out all year (its capacity factor).

How many homes does Drift Sand Wind Project LLC power?

Its 2025 output of 344 GWh equals the yearly electricity use of about 27,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Drift Sand Wind Project LLC?

Drift Sand Wind Project LLC is in Grady County, Oklahoma, at about 34.828°, -97.957°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.

Who operates Drift Sand Wind Project LLC?

It is operated by Enel Green Power NA, Inc. (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.

When did Drift Sand Wind Project LLC open?

Its oldest generator still running came online in 2016.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.