Wind power plant · Grady, OK
Drift Sand Wind Project LLC
Drift Sand Wind Project LLC is a 108 MW wind power plant in Grady County, Oklahoma, operated by Enel Green Power NA, Inc.. Its oldest generator still running came online in 2016. In 2025 it generated 344 GWh, about what 27,000 average Oklahoma homes use in a year.
Drift Sand Wind Project LLC in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 51st largest, about 0.8% of the state's 13 GW of wind capacity.
Grady County has 7 power plants of 1 MW or more with 486 MW in all; Drift Sand Wind Project LLC is 22% of that and the largest of 4 wind plants there.
Its capacity factor of 36% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Drift Sand Wind Project LLC (outlined) and other plants in Grady County, shaded. 34.828, -97.957.
Plant facts
- Operator
- Enel Green Power NA, Inc.
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Grady County, OK
- EIA plant ID
- 59065
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 108 MW | 2016 | – |
Nearby
Other plants in Grady County
Questions
Drift Sand Wind Project LLC, answered
How much power does Drift Sand Wind Project LLC produce?
Drift Sand Wind Project LLC has 108 MW of capacity from one generator. In 2025 it generated 344 GWh, 36% of the most it could have made running flat out all year (its capacity factor).
How many homes does Drift Sand Wind Project LLC power?
Its 2025 output of 344 GWh equals the yearly electricity use of about 27,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Drift Sand Wind Project LLC?
Drift Sand Wind Project LLC is in Grady County, Oklahoma, at about 34.828°, -97.957°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Drift Sand Wind Project LLC?
It is operated by Enel Green Power NA, Inc. (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Drift Sand Wind Project LLC open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.