Wind power plant · Grady, OK
Minco Wind II, LLC
Minco Wind II, LLC is a 101 MW wind power plant in Grady County, Oklahoma, operated by FPLE Wind, LLC. Its oldest generator still running came online in 2011. In 2025 it generated 323 GWh, about what 25,000 average Oklahoma homes use in a year.
Minco Wind II, LLC in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 54th largest, about 0.7% of the state's 13 GW of wind capacity.
Grady County has 7 power plants of 1 MW or more with 486 MW in all; Minco Wind II, LLC is 21% of that and the 2nd largest of 4 wind plants there.
Its capacity factor of 37% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Minco Wind II, LLC (outlined) and other plants in Grady County, shaded. 35.325, -98.071.
Plant facts
- Operator
- FPLE Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Grady County, OK
- EIA plant ID
- 57956
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 101 MW | 2011 | – |
Nearby
Other plants in Grady County
Questions
Minco Wind II, LLC, answered
How much power does Minco Wind II, LLC produce?
Minco Wind II, LLC has 101 MW of capacity from one generator. In 2025 it generated 323 GWh, 37% of the most it could have made running flat out all year (its capacity factor).
How many homes does Minco Wind II, LLC power?
Its 2025 output of 323 GWh equals the yearly electricity use of about 25,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Minco Wind II, LLC?
Minco Wind II, LLC is in Grady County, Oklahoma, at about 35.325°, -98.071°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Grady County goes 9.4 hours a year without power, the 17th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Minco Wind II, LLC?
It is operated by FPLE Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Minco Wind II, LLC open?
Its oldest generator still running came online in 2011.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.