Wind power plant · Beaver, OK
Bluestem
Bluestem is a 198 MW wind power plant in Beaver County, Oklahoma, operated by Bluestem Wind Energy, LLC. Its oldest generator still running came online in 2016. In 2025 it generated 759 GWh, about what 59,000 average Oklahoma homes use in a year.
Bluestem in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 32nd largest, about 1.5% of the state's 13 GW of wind capacity.
Beaver County has 4 power plants of 1 MW or more with 798 MW in all; Bluestem is 25% of that and the 3rd largest of 4 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Beaver County goes 8.4 hours a year without power, the 25th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Bluestem (outlined) and other plants in Beaver County, shaded. 36.552, -100.588.
Plant facts
- Operator
- Bluestem Wind Energy, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Beaver County, OK
- EIA plant ID
- 60256
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 198 MW | 2016 | – |
Nearby
Other plants in Beaver County
Questions
Bluestem, answered
How much power does Bluestem produce?
Bluestem has 198 MW of capacity from one generator. In 2025 it generated 759 GWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Bluestem power?
Its 2025 output of 759 GWh equals the yearly electricity use of about 59,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Bluestem?
Bluestem is in Beaver County, Oklahoma, at about 36.552°, -100.588°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Beaver County goes 8.4 hours a year without power, the 25th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Bluestem?
It is operated by Bluestem Wind Energy, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Bluestem open?
Its oldest generator still running came online in 2016.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.