Wind power plant · Pontotoc, OK

Pontotoc Wind

Pontotoc Wind is a 148 MW wind power plant in Pontotoc County, Oklahoma, operated by Avangrid Power LLC. Its oldest generator still running came online in 2026.

Capacity148 MWNameplate, September 2026
Generated–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Pontotoc Wind in context

Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 41st largest, about 1.1% of the state's 13 GW of wind capacity.

Pontotoc County has 2 power plants of 1 MW or more with 153 MW in all; Pontotoc Wind is 97% of that.

The average electricity customer in Pontotoc County goes 5.2 hours a year without power, the 52nd most of 75 counties in Oklahoma. The county's page has the full outage record.

Where it is

Pontotoc Wind (outlined) and other plants in Pontotoc County, shaded. 34.636, -96.864.

Plant facts

Operator
Avangrid Power LLC
Sector
IPP Non-CHP
Grid operator
SPA
County
Pontotoc County, OK
EIA plant ID
67224
Where Oklahoma's power comes from → Oklahoma power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
20101 Onshore Wind Turbine 148 MW 2026 –

Nearby

Other plants in Pontotoc County

People's · 5.0 MW

Questions

Pontotoc Wind, answered

How much power does Pontotoc Wind produce?

Pontotoc Wind has 148 MW of capacity from one generator. No full year of generation is reported yet.

Where is Pontotoc Wind?

Pontotoc Wind is in Pontotoc County, Oklahoma, at about 34.636°, -96.864°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Pontotoc County goes 5.2 hours a year without power, the 52nd most of 75 counties in Oklahoma. The county's page has the full outage record.

Who operates Pontotoc Wind?

It is operated by Avangrid Power LLC (EIA sector: IPP Non-CHP), and it feeds balancing authority SPA.

When did Pontotoc Wind open?

Its oldest generator still running came online in 2026.