Wind power plant · Kiowa, OK
Rocky Ridge Wind Project
Rocky Ridge Wind Project is a 149 MW wind power plant in Kiowa County, Oklahoma, operated by Rocky Ridge Wind Project LLC. Its oldest generator still running came online in 2012. In 2025 it generated 322 GWh, about what 25,000 average Oklahoma homes use in a year.
Rocky Ridge Wind Project in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 39th largest, about 1.1% of the state's 13 GW of wind capacity.
Kiowa County has 3 power plants of 1 MW or more with 369 MW in all; Rocky Ridge Wind Project is 40% of that.
Its capacity factor of 25% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Kiowa County goes 15 hours a year without power, the 6th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Rocky Ridge Wind Project (outlined) and other plants in Kiowa County, shaded. 35.136, -99.003.
Plant facts
- Operator
- Rocky Ridge Wind Project LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Kiowa County, OK
- EIA plant ID
- 58078
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GE 1. | Onshore Wind Turbine | 149 MW | 2012 | – |
Nearby
Other plants in Kiowa County
Questions
Rocky Ridge Wind Project, answered
How much power does Rocky Ridge Wind Project produce?
Rocky Ridge Wind Project has 149 MW of capacity from one generator. In 2025 it generated 322 GWh, 25% of the most it could have made running flat out all year (its capacity factor).
How many homes does Rocky Ridge Wind Project power?
Its 2025 output of 322 GWh equals the yearly electricity use of about 25,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Rocky Ridge Wind Project?
Rocky Ridge Wind Project is in Kiowa County, Oklahoma, at about 35.136°, -99.003°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Kiowa County goes 15 hours a year without power, the 6th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Rocky Ridge Wind Project?
It is operated by Rocky Ridge Wind Project LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Rocky Ridge Wind Project open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.