Solar power plant · Kiowa, OK
North Fork Solar Project
North Fork Solar Project is a 120 MW solar power plant in Kiowa County, Oklahoma, operated by North Fork Solar Project, LLC. Its oldest generator still running came online in 2024. In 2025 it generated 294 GWh, about what 23,000 average Oklahoma homes use in a year.
North Fork Solar Project in context
Among the 21 solar plants in Oklahoma in the EIA's inventory, it is the 3rd largest, about 13% of the state's 932 MW of solar capacity.
Kiowa County has 3 power plants of 1 MW or more with 369 MW in all; North Fork Solar Project is 33% of that and the largest of 2 solar plants there.
Its capacity factor of 28% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Kiowa County goes 15 hours a year without power, the 6th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
North Fork Solar Project (outlined) and other plants in Kiowa County, shaded. 34.618, -98.983.
Plant facts
- Operator
- North Fork Solar Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Kiowa County, OK
- EIA plant ID
- 66866
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| NFORK | Solar Photovoltaic | 120 MW | 2024 | – |
Nearby
Other plants in Kiowa County
Questions
North Fork Solar Project, answered
How much power does North Fork Solar Project produce?
North Fork Solar Project has 120 MW of capacity from one generator. In 2025 it generated 294 GWh, 28% of the most it could have made running flat out all year (its capacity factor).
How many homes does North Fork Solar Project power?
Its 2025 output of 294 GWh equals the yearly electricity use of about 23,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is North Fork Solar Project?
North Fork Solar Project is in Kiowa County, Oklahoma, at about 34.618°, -98.983°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Kiowa County goes 15 hours a year without power, the 6th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates North Fork Solar Project?
It is operated by North Fork Solar Project, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did North Fork Solar Project open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.