Wind power plant · Major, OK
Maverick Wind Project, LLC
Maverick Wind Project, LLC is a 288 MW wind power plant in Major County, Oklahoma, operated by Public Service Co of Oklahoma. Its oldest generator still running came online in 2021. In 2025 it generated 856 GWh, about what 67,000 average Oklahoma homes use in a year.
Maverick Wind Project, LLC in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 14th largest, about 2.1% of the state's 13 GW of wind capacity.
Its capacity factor of 34% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Major County goes 5.1 hours a year without power, the 53rd most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Maverick Wind Project, LLC (outlined) and other plants in Major County, shaded. 36.294, -98.165.
Plant facts
- Operator
- Public Service Co of Oklahoma
- Sector
- Electric Utility
- Grid operator
- SWPP
- County
- Major County, OK
- EIA plant ID
- 63494
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | 288 MW | 2021 | – |
Questions
Maverick Wind Project, LLC, answered
How much power does Maverick Wind Project, LLC produce?
Maverick Wind Project, LLC has 288 MW of capacity from one generator. In 2025 it generated 856 GWh, 34% of the most it could have made running flat out all year (its capacity factor).
How many homes does Maverick Wind Project, LLC power?
Its 2025 output of 856 GWh equals the yearly electricity use of about 67,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Maverick Wind Project, LLC?
Maverick Wind Project, LLC is in Major County, Oklahoma, at about 36.294°, -98.165°. The average electricity customer in Major County goes 5.1 hours a year without power, the 53rd most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Maverick Wind Project, LLC?
It is operated by Public Service Co of Oklahoma (EIA sector: Electric Utility), and it feeds the Southwest Power Pool.
When did Maverick Wind Project, LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2021–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.