Wind power plant · Noble, OK
Thunder Ranch Wind Project
Thunder Ranch Wind Project is a 298 MW wind power plant in Noble County, Oklahoma, operated by Thunder Ranch Wind Project, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 805 GWh, about what 63,000 average Oklahoma homes use in a year.
Thunder Ranch Wind Project in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 12th largest, about 2.2% of the state's 13 GW of wind capacity.
Noble County has 3 power plants of 1 MW or more with 1.7 GW in all; Thunder Ranch Wind Project is 18% of that and the largest of 2 wind plants there.
Its capacity factor of 31% in 2025 is close to the 32% typical for wind plants across the US.
The average electricity customer in Noble County goes 8.2 hours a year without power, the 29th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Thunder Ranch Wind Project (outlined) and other plants in Noble County, shaded. 36.522, -97.145.
Plant facts
- Operator
- Thunder Ranch Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Noble County, OK
- EIA plant ID
- 61269
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 298 MW | 2017 | – |
Nearby
Other plants in Noble County
Questions
Thunder Ranch Wind Project, answered
How much power does Thunder Ranch Wind Project produce?
Thunder Ranch Wind Project has 298 MW of capacity from one generator. In 2025 it generated 805 GWh, 31% of the most it could have made running flat out all year (its capacity factor).
How many homes does Thunder Ranch Wind Project power?
Its 2025 output of 805 GWh equals the yearly electricity use of about 63,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Thunder Ranch Wind Project?
Thunder Ranch Wind Project is in Noble County, Oklahoma, at about 36.522°, -97.145°. It is one of 3 power plants of 1 MW or more in the county. The average electricity customer in Noble County goes 8.2 hours a year without power, the 29th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Thunder Ranch Wind Project?
It is operated by Thunder Ranch Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Thunder Ranch Wind Project open?
Its oldest generator still running came online in 2017.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.