Wind power plant · Caddo, OK
Minco Wind III, LLC
Minco Wind III, LLC is a 101 MW wind power plant in Caddo County, Oklahoma, operated by FPLE Wind, LLC. Its oldest generator still running came online in 2012. In 2025 it generated 449 GWh, about what 35,000 average Oklahoma homes use in a year.
Minco Wind III, LLC in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 55th largest, about 0.7% of the state's 13 GW of wind capacity.
Caddo County has 11 power plants of 1 MW or more with 2.1 GW in all; Minco Wind III, LLC is 5% of that and the 3rd largest of 6 wind plants there.
Its capacity factor of 51% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Caddo County goes 25 hours a year without power, the 1st most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Minco Wind III, LLC (outlined) and other plants in Caddo County, shaded. 35.372, -98.183.
Plant facts
- Operator
- FPLE Wind, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Caddo County, OK
- EIA plant ID
- 58203
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| 1 | Onshore Wind Turbine | 101 MW | 2012 | – |
Questions
Minco Wind III, LLC, answered
How much power does Minco Wind III, LLC produce?
Minco Wind III, LLC has 101 MW of capacity from one generator. In 2025 it generated 449 GWh, 51% of the most it could have made running flat out all year (its capacity factor).
How many homes does Minco Wind III, LLC power?
Its 2025 output of 449 GWh equals the yearly electricity use of about 35,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Minco Wind III, LLC?
Minco Wind III, LLC is in Caddo County, Oklahoma, at about 35.372°, -98.183°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Caddo County goes 25 hours a year without power, the 1st most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Minco Wind III, LLC?
It is operated by FPLE Wind, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Minco Wind III, LLC open?
Its oldest generator still running came online in 2012.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.