Wind power plant · Washita, OK
Seven Cowboy Wind Project, LLC
Seven Cowboy Wind Project, LLC is a 302 MW wind power plant in Washita County, Oklahoma, operated by Seven Cowboy Wind Project, LLC. Its oldest generator still running came online in 2023. In 2025 it generated 1.2 TWh, about what 92,000 average Oklahoma homes use in a year.
Seven Cowboy Wind Project, LLC in context
Among the 70 wind plants in Oklahoma in the EIA's inventory, it is the 6th largest, about 2.2% of the state's 13 GW of wind capacity.
Washita County has 2 power plants of 1 MW or more with 376 MW in all; Seven Cowboy Wind Project, LLC is 80% of that and the largest of 2 wind plants there.
Its capacity factor of 44% in 2025 is higher than the 32% typical for wind plants across the US.
The average electricity customer in Washita County goes 15 hours a year without power, the 7th most of 75 counties in Oklahoma. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Seven Cowboy Wind Project, LLC (outlined) and other plants in Washita County, shaded. 35.218, -99.104.
Plant facts
- Operator
- Seven Cowboy Wind Project, LLC
- Sector
- IPP Non-CHP
- Grid operator
- SWPP
- County
- Washita County, OK
- EIA plant ID
- 65971
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | 302 MW | 2023 | – |
Nearby
Other plants in Washita County
Questions
Seven Cowboy Wind Project, LLC, answered
How much power does Seven Cowboy Wind Project, LLC produce?
Seven Cowboy Wind Project, LLC has 302 MW of capacity from one generator. In 2025 it generated 1.2 TWh, 44% of the most it could have made running flat out all year (its capacity factor).
How many homes does Seven Cowboy Wind Project, LLC power?
Its 2025 output of 1.2 TWh equals the yearly electricity use of about 92,000 average Oklahoma homes (1,064 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Seven Cowboy Wind Project, LLC?
Seven Cowboy Wind Project, LLC is in Washita County, Oklahoma, at about 35.218°, -99.104°. It is one of 2 power plants of 1 MW or more in the county. The average electricity customer in Washita County goes 15 hours a year without power, the 7th most of 75 counties in Oklahoma. The county's page has the full outage record.
Who operates Seven Cowboy Wind Project, LLC?
It is operated by Seven Cowboy Wind Project, LLC (EIA sector: IPP Non-CHP), and it feeds the Southwest Power Pool.
When did Seven Cowboy Wind Project, LLC open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2023–2025). Homes equivalent uses the average Oklahoma home's 1,064 kWh a month in 2025. Methodology.