Data centers · Florida
Data centers in Florida
65 operating data center sites, 15 projects planned or under construction. Florida ranks 15th of 51 by mapped sites.
The map
Every mapped site
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
Local pushback
Bans and moratoriums
26 recorded as enacted, 10 proposed or under review, 3 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Levy County · Levy | County | Enacted | Sep 9, 2026 | to Sep 30, 2027 |
| Putnam County · Putnam | County | Enacted | Sep 8, 2026 | to Sep 8, 2027 |
| Lake County · Lake | Local | Enacted | Sep 8, 2026 | to Dec 7, 2026 |
| Indiantown · Martin | Village | Rejected | Sep 1, 2026 | Term not documented |
| Miami Lakes · Miami-Dade | Town | Proposed | Sep 1, 2026 | Term not documented |
| Orange County · Orange | County | Proposed | Sep 1, 2026 | Term not documented |
| Marion County · Marion | County | Proposed | Aug 31, 2026 | Term not documented |
| Tallahassee · Leon | City | Rejected | Aug 27, 2026 | Term not documented |
| Hendry County · Hendry | County | Proposed | Aug 27, 2026 | Term not documented |
| Washington County · Washington | Local | Enacted | Aug 20, 2026 | to Aug 20, 2027 |
| Hillsborough County · Hillsborough | County | Proposed | Aug 6, 2026 | Term not documented |
| Edgewater · Volusia | City | Proposed | Aug 4, 2026 | No end date by design — a permanent ban or standing statute |
| Lakeland · Polk | Local | Enacted | Aug 3, 2026 | to Aug 3, 2027 |
| Flagler County · Flagler | Local | Enacted | Aug 3, 2026 | to Aug 3, 2027 |
| Escambia County · Escambia | Local | Enacted | Aug 1, 2026 | No end date by design — a permanent ban or standing statute |
| DeSoto County · DeSoto | Local | Enacted | Jul 29, 2026 | to Jul 29, 2027 |
| Manatee County · Manatee | Local | Enacted | Jul 28, 2026 | Term not documented |
| Santa Rosa County · Santa Rosa | Local | Enacted | Jul 23, 2026 | to Jul 23, 2027 |
| Pasco County · Pasco | Local | Enacted | Jul 14, 2026 | to Jul 14, 2027 |
| Sarasota County · Sarasota | Local | Enacted | Jul 8, 2026 | to Jul 8, 2027 |
| Taylor County · Taylor | Local | Rejected | Jul 7, 2026 | Term not documented |
| Palm Beach County · Palm Beach | Local | Enacted | Jul 1, 2026 | to Jul 31, 2027 |
| Zephyrhills · Pasco | Local | Enacted | Jun 22, 2026 | to Jun 22, 2027 |
| Citrus County · Citrus | Local | Enacted | May 26, 2026 | to May 26, 2027 |
| St. Johns County · St. Johns | County | Proposed | Jan 1, 2026 | Term not documented |
| Collier County · Collier | County | Enacted | Jan 1, 2026 | Runs until a condition is met, not to a date |
| Hernando County · Hernando | County | Enacted | Jan 1, 2026 | to Jun 22, 2027 |
| Leon County · Leon | County | Enacted | Jan 1, 2026 | to Jan 14, 2028 |
| Bay County · Bay | County | Enacted | Jan 1, 2026 | to Jan 8, 2027 |
| Holmes County · Holmes | County | Enacted | Jan 1, 2026 | to Jun 16, 2027 |
| Wakulla County · Wakulla | County | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Walton County · Walton | County | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Jackson County · Jackson | County | Enacted | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| Nassau County · Nassau | County | Enacted | Jan 1, 2026 | to Jun 8, 2027 |
| Clay County · Clay | County | Enacted | Jan 1, 2026 | to Jun 23, 2027 |
| Volusia County · Volusia | County | Proposed | Jan 1, 2026 | No end date by design — a permanent ban or standing statute |
| North Port · Sarasota | Local | Proposed | Jan 1, 2026 | Term not documented |
| Martin County · Martin | County | Proposed | Jan 1, 2026 | Term not documented |
| Madison County · Madison | County | Enacted | Jan 1, 2026 | to Jul 22, 2027 |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Miami-Dade County | 15 | 3.2 h |
| Orange County | 11 | 6.7 h |
| Hillsborough County | 9 | 6.6 h |
| Duval County | 6 | 2.2 h |
| Broward County | 6 | 1.4 h |
| Polk County | 3 | 9.9 h |
| Palm Beach County | 3 | 2.7 h |
| Brevard County | 3 | 4.7 h |
| Leon County | 2 | 13 h |
| Volusia County | 2 | 16 h |
Every named site
The list
62 of 65 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| JAX2 | Cologix | Duval | Civic Returns | 2.9 |
| NAP of the Americas | – | Miami-Dade | Building | 2.8 |
| Tierpoint Jacksonville Data Center | TierPoint | Duval | Civic Returns | 2.8 |
| 1 | Cologix | Polk | Civic Returns | 2.4 |
| Cyxtera Tampa TP1 | Cyxtera | Hillsborough | Building | 2.2 |
| Flexential Fort Lauderdale | Flexential | Broward | Building | 1.7 |
| EdgeConneX MIA02 | EdgeConneX | Miami-Dade | Civic Returns | 1.5 |
| T-Mobile Everglades MSO Data Center | – | Broward | Building | 1.1 |
| UF Research Computing Center | University of Florida | Alachua | Building | 0.8 |
| Flexential Tampa - North | Flexential | Hillsborough | Building | 0.7 |
| Cologix Jacksonville JAX1 | – | Duval | Building | 0.7 |
| EdgeConneX MIA01 | EdgeConneX | Miami-Dade | Civic Returns | 0.6 |
| EdgeConneX JAX01 | EdgeConneX | Duval | Civic Returns | 0.4 |
| EdgeConneX TAL01 | EdgeConneX | Leon | Civic Returns | 0.3 |
| E-Foam | – | Orange | Building | 0.2 |
| NocRoom Miami IT Services | – | Miami-Dade | Point | – |
| NocRoom Miami IT Services | – | Miami-Dade | Point | – |
| Flexential Jacksonville | Flexential | Duval | Point | – |
| Flexential Tampa - West | Flexential | Hillsborough | Point | – |
| HostDime | – | Orange | Point | – |
| Atlantic.net | – | Orange | Point | – |
| Centersquare TPA1 | Centersquare | Hillsborough | Operator's own list | – |
| Cogent Boca Raton Office & Data Center | Cogent Communications | Palm Beach | Operator's own list | – |
| Cogent Miami Office & Data Center | Cogent Communications | Miami-Dade | Operator's own list | – |
| Cogent Hollywood, FL Data Center | Cogent Communications | Broward | Operator's own list | – |
| Cogent Orlando Data Center | Cogent Communications | Orange | Operator's own list | – |
| Cogent Daytona Edge Data Center | Cogent Communications | Volusia | Operator's own list | – |
| Cogent Tampa Data Center | Cogent Communications | Hillsborough | Operator's own list | – |
| Cogent Pensacola Edge Data Center | Cogent Communications | Escambia | Operator's own list | – |
| Cogent Tallahassee Edge Data Center | Cogent Communications | Leon | Operator's own list | – |
| Cologix LAK1 | Cologix | Polk | Operator's own list | – |
| Colohouse (Hivelocity) Hivelocity Tampa 1 | Colohouse (Hivelocity) | Hillsborough | Operator's own list | – |
| Colohouse (Hivelocity) Hivelocity Tampa 2 | Colohouse (Hivelocity) | Hillsborough | Operator's own list | – |
| CoreSite MI1 | CoreSite | Miami-Dade | Operator's own list | – |
| CoreSite MI2 | CoreSite | Miami-Dade | Operator's own list | – |
| CoreSite OR1 | CoreSite | Orange | Operator's own list | – |
| DataBank Downtown Miami Data Center | DataBank | Miami-Dade | Operator's own list | – |
| 365 Data Centers Boca Raton, FL | 365 Data Centers | Palm Beach | Operator's own list | – |
| 365 Data Centers Fort Lauderdale, FL | 365 Data Centers | Broward | Operator's own list | – |
| Digital Realty MIA10 | Digital Realty | Miami-Dade | Operator's own list | – |
| H5 Data Centers Tampa, FL | H5 Data Centers | Hillsborough | Operator's own list | – |
| Lumen Daytona Beach, FL | Lumen | Volusia | Operator's own list | – |
| Lumen Melbourne, FL | Lumen | Brevard | Operator's own list | – |
| Lumen Orlando, FL | Lumen | Orange | Operator's own list | – |
| Lumen West Palm Beach, FL | Lumen | Palm Beach | Operator's own list | – |
| QTS Miami | QTS | Miami-Dade | Operator's own list | – |
| Volico FLL1 | Volico | Broward | Operator's own list | – |
| Volico MIA1 | Volico | Miami-Dade | Operator's own list | – |
| Coresite Real Estate Or1 Llc | CoreSite | Orange | EPA record | – |
| A T & T Orlando Data Center | – | Orange | EPA record | – |
| Comcast Data Center | – | Orange | EPA record | – |
| Comcast Miramar Data Center | – | Broward | EPA record | – |
| Csx Transportation Inc Data Center | – | Duval | EPA record | – |
| Iron Mountain Miami Data Center | – | Miami-Dade | EPA record | – |
| Kennedy Data Center | – | Brevard | EPA record | – |
| Lee Health Lab & Data Center | – | Lee | EPA record | – |
| Pasco County Data Center | – | Pasco | EPA record | – |
| Telcofacilities Data Center | – | Lee | EPA record | – |
| Verizon Orlando Data Center | – | Orange | EPA record | – |
| Viera Data Center - Phase 1 | – | Brevard | EPA record | – |
| Ybor Data Center | – | Hillsborough | EPA record | – |
| Equinix Data Center | Equinix | Miami-Dade | Overture place | – |
How many data centers are in Florida?
65 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 15th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Florida?
3 under construction and 12 planned or announced in the Civic Returns and Server Country databases; the 10 that publish a size add up to about 4.7 GW. 5 projects have been cancelled.
Which Florida county has the most data centers?
Miami-Dade County, with 15 operating sites, then Orange County (11) and Hillsborough County (9).
Who operates data centers in Florida?
Among sites that name an operator: Cogent Communications (8), Flexential (4), EdgeConneX (4), CoreSite (4), Lumen (4).
What do Florida households pay for electricity?
15.2¢ per kWh on average in 2025 (US: 17.2¢), up 32% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.