Data centers · Nebraska
Data centers in Nebraska
36 operating data center sites, 3 projects planned or under construction and 4 AI campuses planned to draw 1.2 GW.
The map
Every mapped site
AI campuses
Nebraska's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Google Omaha | Douglas County | 237 MW | 474 MW | |
| Google Papillion | Sarpy County | 237 MW | 284 MW | |
| Google Lincoln | Lancaster County | 141 MW | 339 MW | |
| Meta Sarpy | Meta | Sarpy County | 80 MW | 105 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
| Project | Developer | County | Status | Announced size | Year |
|---|---|---|---|---|---|
| AAIM Nebraska 2 Data Center | AAIM Data Centers | Adams | Under construction | 13 MW | 2025 |
| Fortitude Mining Grand Island Data Center | Fortitude Mining | Hall | Under construction | 12 MW | 2026 |
| Sequitor Edge Kearney Data Center | Sequitor Edge | Buffalo | Planned | 5 MW | 2027 |
Local pushback
Bans and moratoriums
16 recorded as enacted, 2 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Lancaster County · Lancaster | County | Withdrawn | Sep 10, 2026 | Term not documented |
| Nehawka · Cass | Town | Enacted | Aug 26, 2026 | No end date by design — a permanent ban or standing statute |
| Cass County · Cass | County | Enacted | Aug 11, 2026 | to Aug 11, 2027 |
| Gage County · Gage | County | Enacted | Aug 5, 2026 | to Apr 5, 2027 |
| Logan County · Logan | County | Enacted | Jul 15, 2026 | to Jul 15, 2027 |
| Cherry County · Cherry | County | Enacted | Jul 14, 2026 | to Jan 14, 2027 |
| Seward County · Seward | Local | Enacted | Jun 30, 2026 | to Jun 30, 2027 |
| Butler County · Butler | County | Enacted | Jun 1, 2026 | A stated duration, but the end date isn't recorded here |
| Otoe County · Otoe | County | Enacted | May 20, 2026 | to May 20, 2027 |
| Hall County · Hall | County | Proposed | – | Term not documented |
| Garfield County · Garfield | County | Proposed | – | Term not documented |
| Kearney County · Kearney | County | Enacted | – | Term not documented |
| Johnson County · Nemaha | County | Enacted | – | Term not documented |
| Harlan County · Harlan | County | Enacted | – | Term not documented |
| Hayes County · Hayes | County | Enacted | – | Term not documented |
| Furnas County · Furnas | County | Enacted | – | Term not documented |
| Dundy County · Dundy | County | Enacted | – | Term not documented |
| Custer County · Custer | County | Enacted | – | Term not documented |
| Box Butte County · Box Butte | County | Enacted | – | Term not documented |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Sarpy County | 20 | 6.5 h |
| Douglas County | 12 | 8.6 h |
| Lancaster County | 1 | 0.5 h |
| Buffalo County | 1 | 0.7 h |
| Hall County | 1 | – |
| Kearney County | 1 | – |
Every named site
The list
35 of 36 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| Lincoln Hyperscale Campus - Phase 1 | Lancaster | Civic Returns | 18 | |
| Meta Sarpy Data center | Meta | Sarpy | Building | 15 |
| Meta Sarpy Data center | Meta | Sarpy | Building | 14 |
| Meta Sarpy Data center | Meta | Sarpy | Building | 14 |
| Meta Sarpy Data center | Meta | Sarpy | Building | 12 |
| Sarpy | Building | 6.8 | ||
| Sarpy | Building | 6.8 | ||
| Sarpy | Building | 6.7 | ||
| Douglas | Building | 6.6 | ||
| Douglas | Building | 6.6 | ||
| Douglas | Building | 6.6 | ||
| Meta Sarpy Data center | Meta | Sarpy | Building | 6.5 |
| Yahoo | – | Sarpy | Building | 5.4 |
| Travelers Insurance | – | Sarpy | Building | 4.2 |
| Sarpy | Building | 3.5 | ||
| Tierpoint Omaha - Bellevue Data Center | TierPoint | Sarpy | Civic Returns | 2.3 |
| Verizon | – | Douglas | Building | 2.0 |
| Scott Data Center | – | Douglas | Building | 1.9 |
| First National Technical Center | – | Douglas | Building | 1.6 |
| Tierpoint Omaha - Midlands Data Center | TierPoint | Sarpy | Civic Returns | 1.4 |
| Omaha Switch | Cogent Communications | Douglas | Campus | 1.4 |
| Union Pacific Jack Koraleski Technology, Research & Development Center | – | Douglas | Building | 1.2 |
| Fidelity | – | Sarpy | Building | 0.9 |
| – | Verizon | Douglas | Building | 0.9 |
| 1623 Farnam | News-Press & Gazette Company | Douglas | Building | 0.8 |
| Verizon | – | Douglas | Building | 0.3 |
| Cogent Grand Island Edge Data Center | Cogent Communications | Hall | Operator's own list | – |
| H5 Data Centers Omaha, NE | H5 Data Centers | Sarpy | Operator's own list | – |
| LightEdge Omaha Data Center | LightEdge | Sarpy | Operator's own list | – |
| MARA Minden Nebraska | MARA | Kearney | Operator's own list | – |
| Meta Sarpy Data Center | Meta | Sarpy | Operator's own list | – |
| Ensono Omaha Data Center | – | Douglas | EPA record | – |
| Fireball Group Llc Data Center | – | Sarpy | EPA record | – |
| Papillion 5 Mw Data Center | – | Sarpy | EPA record | – |
| Pinnacle Bank Data Center | – | Sarpy | EPA record | – |
How many data centers are in Nebraska?
36 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 23rd most of any state. 2 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Nebraska?
2 under construction and 1 planned or announced in the Civic Returns and Server Country databases; the 3 that publish a size add up to about 29 MW, besides 4 AI campuses tracked by Epoch AI.
Which Nebraska county has the most data centers?
Sarpy County, with 20 operating sites, then Douglas County (12) and Lancaster County (1).
Who operates data centers in Nebraska?
Among sites that name an operator: Google (8), Meta (6), TierPoint (2), Cogent Communications (2), Verizon (1).
What AI data centers are in Nebraska?
Google Omaha in Omaha (237 MW now, 474 MW planned); Google Papillion in Papillion (237 MW now, 284 MW planned); Google Lincoln in Lincoln (141 MW now, 339 MW planned); Meta Sarpy in Springfield (80 MW now, 105 MW planned), by Epoch AI's estimates.
What do Nebraska households pay for electricity?
12.1¢ per kWh on average in 2025 (US: 17.2¢), up 13% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.