AI data center · Papillion, Nebraska

Google Papillion

Google's AI campus in Sarpy County. It draws about 237 MW today and is planned to reach 284 MW by August 2024.

Power now237 MWAs of May 4, 2026
Planned peak284 MWAugust 2024
Compute101kH100-equivalent chips now
Capital cost$9.0BSo far, 2025 dollars

Latest look · May 4, 2026

What the satellite shows

Building 4 shell mostly complete, Building 5 steel framing is underway.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW400 MW202120222023202420252026
Power drawn by Google Papillion, from Epoch AI's dated observations.
0 MW100 MW200 MW300 MW400 MW202120222023202420252026
Power drawn by Google Papillion, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Google
Used by
Google DeepMind (speculative)
Investors
Google
Chips
TPU v4, TPU v5e, TPU v5p
Water use
0.09 million gallons a day (Epoch AI estimate)
Address
14651-15249 Gold Coast Rd 68138 Papillion Nebraska, USA
County
Sarpy County (approximate)

Where

On the map of Nebraska

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed at the centre of Papillion, as no address could be matched, so the dot and the county are approximate.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Walter Scott Jr Energy Center● Coal1.65 GW12.6 mi
North Omaha● Coal645 MW14.6 mi
Turtle Creek● Natural gas528 MW5.9 mi
Cass County● Natural gas345 MW14.8 mi
Sarpy County● Natural gas338 MW5.9 mi
Standing Bear Lake● Natural gas163 MW12 mi
Jones Street● Oil130 MW11 mi
Missouri River Wastewater Treatment● Biomass3 MW8.8 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
May 4, 2026Building 4 shell mostly complete, Building 5 steel framing is underway.284 MW
Nov 3, 2025Land cleared for Building 4 and 5.284 MW
Aug 3, 2024Building 3 looks operational.284 MW
Feb 15, 2024Building 2 assumed operational due to vapor from cooling towers. Building 3 5/7 cooling towers installed.95 MW
Jan 23, 2023Building 1 assumed operational due to vapor from cooling towers. Building 2 4/7 cooling towers installed. Building 3 roof complete coverage but unfinished.95 MW
Oct 16, 2022Building 2 under construction. Building 3 begins construction.–
Mar 4, 2020Land clearing begins for Building 1 of expansion.–

How much power does Google Papillion use?

About 237 MW as of May 4, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 284 MW in its build plans by August 2024. Running all year, 237 MW would use about 2.1 TWh.

Who owns Google Papillion?

Google; used by Google DeepMind (speculative). Investors: Google. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Google Papillion?

In Sarpy County, the average customer is without power about 6.5 hours in a typical year in this site's outage record, with 8 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Google Papillion?

8 plants within 15 miles total about 3.80 GW; the largest is Walter Scott Jr Energy Center (1.65 GW, coal), 12.6 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.