Data centers · Minnesota

Data centers in Minnesota

42 operating data center sites, 18 projects planned or under construction and 1 AI campus planned to draw 241 MW.

Operating sites420 whole campuses
AI campuses1178 MW drawn now
In the pipeline182 under construction, 16 planned
Home price15.8¢/kWh+20% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Minnesota's AI data centers

CampusOwnerWhereNowPlanned
Meta RosemountMetaDakota County178 MW241 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Centra MSP1 Data Center Centra Dakota Under construction – 2027
Tract Farmington Technology Park Tract Dakota Under construction – –
Monticello Tech/Monticello Industrial Park Monticello Tech, LLC Wright Planned 400 MW 2030
Becker Data Center Microsoft Sherburne Planned 325 MW 2026
MSP Campus CloudHQ Carver Planned 200 MW –
Scannell Technology Park Scannell Properties, LLC Wright Planned 150 MW 2027
Archer: Minneapolis Campus Archer Datacenters Rice Planned 120 MW 2025
Shakopee Capital Dean Lakes Data Center Shakopee Capital LLC Scott Planned 50 MW –
Elk River Industrial Boulevard Data Center Elk River Capital LLC Sherburne Planned 33 MW –
Cloud Capital Minneapolis Data Center Expansion Cloud Capital Hennepin Planned 31 MW –
BlockchAIn Crow Wing County Data Center BlockchAIn Digital Infrastructure Inc. Crow Wing Planned 25 MW 2026
Oppidan MN Data Center Oppidan Dakota Planned 5 MW 2026
T5/QLevr Inver Grove Heights Data Center QLevr LLC Dakota Planned 5 MW –
Hampton Data Center Oppidan Investment Co. Dakota Planned – –
Hermantown Data Center Google St. Louis Planned – 2030
Microsoft Becker Data Center Microsoft Corporation Sherburne Planned – –
Pine Island Data Center (Project Skyway) Google Goodhue Planned – 2028
Tract Cannon Falls Technology Park Tract Goodhue Planned – –
Nobles County Powered Data Park Geronimo Power Nobles Cancelled 400 MW –
AWS Becker Amazon Sherburne Cancelled 383 MW –

Local pushback

Bans and moratoriums

18 recorded as enacted, 0 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Carlton County · Carlton Local Enacted Aug 24, 2026 to Aug 24, 2027
Pine County · Pine County Enacted Aug 18, 2026 to Aug 18, 2027
Hastings · Dakota Local Enacted Aug 17, 2026 to Aug 17, 2027
Elk River · Sherburne City Enacted Aug 3, 2026 to Aug 3, 2027
Minnetrista · Hennepin City Enacted Aug 3, 2026 to Aug 3, 2027
Mankato · Blue Earth City Enacted Jul 13, 2026 to Jul 13, 2027
Apple Valley · Dakota City Enacted Jul 9, 2026 to Jul 9, 2027
Washington County · Washington Local Enacted Jul 1, 2026 A stated duration, but the end date isn't recorded here
Inver Grove Heights · Dakota Local Enacted Jun 26, 2026 to Jun 26, 2027
Le Sueur County · Le Sueur County Enacted May 26, 2026 to May 26, 2027
Minneapolis · Hennepin Local Enacted May 22, 2026 to Nov 21, 2026
Wright County · Wright Local Enacted May 19, 2026 to May 19, 2027
Rosemount · Dakota City Enacted Apr 21, 2026 to Apr 21, 2027
Carver · Carver Local Enacted Apr 6, 2026 to Apr 6, 2027
Eagan · Dakota Local Enacted Feb 1, 2026 to Feb 17, 2027

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Hennepin County143.1 h
Dakota County91.7 h
Carver County52.5 h
Ramsey County43.0 h
Scott County21.2 h
Anoka County12.0 h
Olmsted County11.2 h
St. Louis County14.1 h
Rice County12.8 h
Crow Wing County14.0 h

Every named site

The list

40 of 42 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
UHG Data Center – Carver Building 6.9
Flexential Minneapolis - Chaska Flexential Carver Building 3.1
Lightedge Data Center – Carver Building 2.8
DataBank – Hennepin Building 2.6
H5 Minneapolis H5 Data Centers Ramsey Building 2.5
Minnesota Gateway Data Center – Hennepin Building 2.0
Encompass Minneapolis Facility – Anoka Building 1.7
Verizon - Bloomington Network Verizon Hennepin Building 1.6
StreamData Center – Carver Building 1.5
– Verizon Hennepin Building 1.2
East Twin Cities Data Cente MSP2 DataBank Dakota Civic Returns 1.1
Epic / Mayo Data Center – Olmsted Building 1.1
EdgeConneX MSP01 EdgeConneX Hennepin Civic Returns 0.8
Centersquare MSP1 Centersquare Scott Civic Returns 0.7
Ark Duluth Data Center – St. Louis Building 0.6
West Twin Cities Data Cente MSP1 DataBank Hennepin Civic Returns 0.6
Advanced Operations Center University of Minnesota Hennepin Building 0.5
Lumen Minneapolis 3 Lumen Hennepin Building 0.3
Cogent Minneapolis Office & Data Center Cogent Communications Hennepin Operator's own list –
Cogent St. Paul Data Center Cogent Communications Ramsey Operator's own list –
LightEdge Minneapolis Data Center LightEdge Carver Operator's own list –
US Signal MN01 Minneapolis US Signal Hennepin Operator's own list –
Eagan 5 Mw Data Center – Dakota EPA record –
Fairview Data Center – Hennepin EPA record –
General Mills Data Center - Minneapolis – Hennepin EPA record –

How many data centers are in Minnesota?

42 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 19th most of any state. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Minnesota?

2 under construction and 16 planned or announced in the Civic Returns and Server Country databases; the 11 that publish a size add up to about 1.3 GW, besides 1 AI campus tracked by Epoch AI. 6 projects have been cancelled.

Which Minnesota county has the most data centers?

Hennepin County, with 14 operating sites, then Dakota County (9) and Carver County (5).

Who operates data centers in Minnesota?

Among sites that name an operator: Verizon (2), DataBank (2), Cogent Communications (2), Flexential (1), H5 Data Centers (1).

What AI data centers are in Minnesota?

Meta Rosemount in Rosemount (178 MW now, 241 MW planned), by Epoch AI's estimates.

What do Minnesota households pay for electricity?

15.8¢ per kWh on average in 2025 (US: 17.2¢), up 20% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.