Data centers · Minnesota
Data centers in Minnesota
42 operating data center sites, 18 projects planned or under construction and 1 AI campus planned to draw 241 MW.
The map
Every mapped site
AI campuses
Minnesota's AI data centers
| Campus | Owner | Where | Now | Planned |
|---|---|---|---|---|
| Meta Rosemount | Meta | Dakota County | 178 MW | 241 MW |
The pipeline
Projects on the way
From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.
Local pushback
Bans and moratoriums
18 recorded as enacted, 0 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.
| Where | Level | Status | Date | Runs |
|---|---|---|---|---|
| Carlton County · Carlton | Local | Enacted | Aug 24, 2026 | to Aug 24, 2027 |
| Pine County · Pine | County | Enacted | Aug 18, 2026 | to Aug 18, 2027 |
| Hastings · Dakota | Local | Enacted | Aug 17, 2026 | to Aug 17, 2027 |
| Elk River · Sherburne | City | Enacted | Aug 3, 2026 | to Aug 3, 2027 |
| Minnetrista · Hennepin | City | Enacted | Aug 3, 2026 | to Aug 3, 2027 |
| Mankato · Blue Earth | City | Enacted | Jul 13, 2026 | to Jul 13, 2027 |
| Apple Valley · Dakota | City | Enacted | Jul 9, 2026 | to Jul 9, 2027 |
| Washington County · Washington | Local | Enacted | Jul 1, 2026 | A stated duration, but the end date isn't recorded here |
| Inver Grove Heights · Dakota | Local | Enacted | Jun 26, 2026 | to Jun 26, 2027 |
| Le Sueur County · Le Sueur | County | Enacted | May 26, 2026 | to May 26, 2027 |
| Minneapolis · Hennepin | Local | Enacted | May 22, 2026 | to Nov 21, 2026 |
| Wright County · Wright | Local | Enacted | May 19, 2026 | to May 19, 2027 |
| Rosemount · Dakota | City | Enacted | Apr 21, 2026 | to Apr 21, 2027 |
| Carver · Carver | Local | Enacted | Apr 6, 2026 | to Apr 6, 2027 |
| Eagan · Dakota | Local | Enacted | Feb 1, 2026 | to Feb 17, 2027 |
| Waite Park · Stearns | City | Enacted | Jan 1, 2026 | to May 4, 2027 |
| Freeborn County · Freeborn | County | Enacted | Aug 19, 2025 | to Aug 19, 2027 |
| St. Joseph · Stearns | Local | Enacted | – | A stated duration, but the end date isn't recorded here |
By county
Where the data centers cluster
| County | Mapped sites | Hours without power a year |
|---|---|---|
| Hennepin County | 14 | 3.1 h |
| Dakota County | 9 | 1.7 h |
| Carver County | 5 | 2.5 h |
| Ramsey County | 4 | 3.0 h |
| Scott County | 2 | 1.2 h |
| Anoka County | 1 | 2.0 h |
| Olmsted County | 1 | 1.2 h |
| St. Louis County | 1 | 4.1 h |
| Rice County | 1 | 2.8 h |
| Crow Wing County | 1 | 4.0 h |
Every named site
The list
40 of 42 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).
| Site | Operator | County | Source | Acres |
|---|---|---|---|---|
| UHG Data Center | – | Carver | Building | 6.9 |
| Flexential Minneapolis - Chaska | Flexential | Carver | Building | 3.1 |
| Lightedge Data Center | – | Carver | Building | 2.8 |
| DataBank | – | Hennepin | Building | 2.6 |
| H5 Minneapolis | H5 Data Centers | Ramsey | Building | 2.5 |
| Minnesota Gateway Data Center | – | Hennepin | Building | 2.0 |
| Encompass Minneapolis Facility | – | Anoka | Building | 1.7 |
| Verizon - Bloomington Network | Verizon | Hennepin | Building | 1.6 |
| StreamData Center | – | Carver | Building | 1.5 |
| – | Verizon | Hennepin | Building | 1.2 |
| East Twin Cities Data Cente MSP2 | DataBank | Dakota | Civic Returns | 1.1 |
| Epic / Mayo Data Center | – | Olmsted | Building | 1.1 |
| EdgeConneX MSP01 | EdgeConneX | Hennepin | Civic Returns | 0.8 |
| Centersquare MSP1 | Centersquare | Scott | Civic Returns | 0.7 |
| Ark Duluth Data Center | – | St. Louis | Building | 0.6 |
| West Twin Cities Data Cente MSP1 | DataBank | Hennepin | Civic Returns | 0.6 |
| Advanced Operations Center | University of Minnesota | Hennepin | Building | 0.5 |
| Lumen Minneapolis 3 | Lumen | Hennepin | Building | 0.3 |
| Cogent Minneapolis Office & Data Center | Cogent Communications | Hennepin | Operator's own list | – |
| Cogent St. Paul Data Center | Cogent Communications | Ramsey | Operator's own list | – |
| LightEdge Minneapolis Data Center | LightEdge | Carver | Operator's own list | – |
| US Signal MN01 Minneapolis | US Signal | Hennepin | Operator's own list | – |
| Eagan 5 Mw Data Center | – | Dakota | EPA record | – |
| Fairview Data Center | – | Hennepin | EPA record | – |
| General Mills Data Center - Minneapolis | – | Hennepin | EPA record | – |
| Hb Fuller Co - Data Center - Arden Hills | – | Ramsey | EPA record | – |
| Healthpartners Data Center | – | Dakota | EPA record | – |
| Compass Datacenters Msp 1A & | Compass Datacenters | Scott | EPA record | – |
| Archer Datacenters Faribault | – | Rice | EPA record | – |
| Brooklyn Park Datacenter | – | Hennepin | EPA record | – |
| Becker Data Center Project | – | Crow Wing | EPA record | – |
| Hormel Remote Data Center | – | Steele | EPA record | – |
| Iron Gate Data Centers - Eagan | – | Dakota | EPA record | – |
| Kroll Ontrack - Data Center Iii | – | Hennepin | EPA record | – |
| Medtronic Data Center | – | Washington | EPA record | – |
| Shoreview Data Center | – | Ramsey | EPA record | – |
| Usps Itasc Data Center Resili | – | Dakota | EPA record | – |
| Vaultas - St. Cloud Data Center | – | Stearns | Overture place | – |
| West Group Data Center F | Ryan Companies US, Inc. | Dakota | EIA plant record | – |
| Thomson Reuters Data Center Bldg ES101 | CADC MSP01, LLC | Dakota | EIA plant record | – |
How many data centers are in Minnesota?
42 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 19th most of any state. The map covers most large sites, not every server room, so the true number is higher.
How many data centers are being built in Minnesota?
2 under construction and 16 planned or announced in the Civic Returns and Server Country databases; the 11 that publish a size add up to about 1.3 GW, besides 1 AI campus tracked by Epoch AI. 6 projects have been cancelled.
Which Minnesota county has the most data centers?
Hennepin County, with 14 operating sites, then Dakota County (9) and Carver County (5).
Who operates data centers in Minnesota?
Among sites that name an operator: Verizon (2), DataBank (2), Cogent Communications (2), Flexential (1), H5 Data Centers (1).
What AI data centers are in Minnesota?
Meta Rosemount in Rosemount (178 MW now, 241 MW planned), by Epoch AI's estimates.
What do Minnesota households pay for electricity?
15.8¢ per kWh on average in 2025 (US: 17.2¢), up 20% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.
Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.