AI data center · Rosemount, Minnesota

Meta Rosemount

Meta's AI campus in Dakota County. It draws about 178 MW today and is planned to reach 241 MW by June 2026.

Power now178 MWAs of Jun 19, 2026
Planned peak241 MWJune 2026
Compute216kH100-equivalent chips now
Capital cost$6.7BSo far, 2025 dollars

Latest look · Jun 19, 2026

What the satellite shows

Buildings 1 and 2 are estimated to be operational.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW20252026
Power drawn by Meta Rosemount, from Epoch AI's dated observations.
0 MW100 MW200 MW300 MW20252026
Power drawn by Meta Rosemount, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
Meta
Used by
Meta
Chips
B200
Water use
0.00 million gallons a day (Epoch AI estimate)
Address
1772-2396 145th St, Rosemount, MN 55068, USA
County
Dakota County

Where

On the map of Minnesota

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
High Bridge● Natural gas644 MW13.6 mi
Black Dog● Natural gas563 MW10.7 mi
Inver Hills● Natural gas284 MW3 mi
LSP-Cottage Grove LP● Natural gas284 MW8.1 mi
St Paul Cogeneration● Biomass37 MW14.2 mi
Twin Cities Hydro LLC● Hydro18 MW14.1 mi
Thomson Reuters Campus Bldg A-D● Oil14 MW6.3 mi
West Group Data Center● Oil8 MW6.6 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
Jun 19, 2026Buildings 1 and 2 are estimated to be operational.241 MW
Mar 21, 2026Both buildings and their cooling infrastructure look complete, but the site probably is likely still under commissioning, and few cars are parked to the right of Building 1. We give another 3 months before it's operational.–
Feb 1, 2024Land clearing begins.–

How much power does Meta Rosemount use?

About 178 MW as of Jun 19, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 241 MW in its build plans by June 2026. Running all year, 178 MW would use about 1.6 TWh.

Who owns Meta Rosemount?

Meta; used by Meta. Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around Meta Rosemount?

In Dakota County, the average customer is without power about 1.7 hours in a typical year in this site's outage record, with 1 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Meta Rosemount?

8 plants within 15 miles total about 1.93 GW; the largest is High Bridge (644 MW, natural gas), 13.6 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.