Data centers · Indiana

Data centers in Indiana

39 operating data center sites, 30 projects planned or under construction and 3 AI campuses planned to draw 3.6 GW.

Operating sites392 whole campuses
AI campuses31.2 GW drawn now
In the pipeline307 under construction, 23 planned
Home price16.0¢/kWh+30% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

Indiana's AI data centers

CampusOwnerWhereNowPlanned
Anthropic-Amazon New CarlisleAmazonSt. Joseph County1.0 GW2.3 GW
Meta JeffersonvilleMetaClark County178 MW241 MW
Google Fort WayneGoogleAllen County–1.0 GW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Meta Lebanon Data Center Meta Boone Under construction 1.0 GW –
Morgan County Data Center Google Morgan Under construction 391 MW 2028
Google Michigan City Data Center (Project Maize) Google LaPorte Under construction 300 MW 2030
Microsoft Mishawaka/Granger Data Center Microsoft St. Joseph Under construction 110 MW 2029
Hobart IN Data Center Hobart Devco, LLC Lake Under construction – 2027
Microsoft datacenters - La Porte Microsoft LaPorte Under construction – –
PowerHouse Hobart PowerHouse Data Centers Lake Under construction – –
Amazon Web Services (AWS) Hobart Tech Park Amazon Web Services Lake Planned 2.4 GW 2028
Project Domino Meta Boone Planned 1.5 GW 2027
Surge Development Knightstown Data Center Surge Development Henry Planned 1.0 GW –
La Porte Data Center Microsoft LaPorte Planned 538 MW 2032
Sentinel Data Centers Project Shirley Eagle Creek Township Campus Sentinel Data Centers Porter Planned 500 MW –
Next Frontier / Fluidstack New Lebanon Data Center Next Frontier Sullivan Planned 430 MW 2027
Vantage IN Data Center Vantage Data Centers Hendricks Planned 400 MW –
Sabey Decatur Township Data Center Sabey Marion Planned 250 MW 2030
CoreWeave Digital Crossroads Data Center Decennial Group Lake Planned 180 MW 2027
DC BLOX Thunderbird Commerce Center Data Center DC BLOX Marion Planned 78 MW 2031
Metrobloks Martindale-Brightwood Data Center Metrobloks Marion Planned 72 MW 2027
Amazon Web Services (AWS) Wheatfield/Jasper County Campus Amazon Web Services Jasper Planned – –
JPG Data Center JPG Data Center Jefferson Planned – –

Local pushback

Bans and moratoriums

21 recorded as enacted, 2 proposed or under review, 1 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Evansville · Vanderburgh Local Enacted Oct 5, 2026 A stated duration, but the end date isn't recorded here
Indianapolis (Marion County) · Marion Local Enacted Aug 19, 2026 to Dec 31, 2027
Howard County · Howard Local Enacted Aug 18, 2026 to Aug 18, 2027
Warrick County · Warrick Local Enacted Aug 11, 2026 to Feb 7, 2027
Jeffersonville · Clark Local Enacted Aug 4, 2026 to Aug 4, 2027
New Albany · Floyd Local Enacted Jul 16, 2026 to Jul 16, 2027
Clarksville · Clark Town Enacted Jul 14, 2026 No end date by design — a permanent ban or standing statute
Boone County · Boone Local Enacted Jun 16, 2026 to Jun 15, 2027
Merrillville · Lake Local Enacted Jun 1, 2026 to May 31, 2027
Fayette County · Fayette Local Enacted May 18, 2026 to May 18, 2027
Miami County · Miami Local Enacted May 4, 2026 Term not documented
Cass County · Cass Local Enacted Apr 21, 2026 No end date by design — a permanent ban or standing statute
Marshall County · Marshall Local Enacted Apr 20, 2026 No end date by design — a permanent ban or standing statute
Grant County · Grant Local Enacted Mar 16, 2026 to Mar 16, 2028
Fulton County · Fulton Local Enacted Mar 2, 2026 to Mar 2, 2027

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
St. Joseph County128.5 h
Marion County94.1 h
Lake County34.7 h
Tippecanoe County33.3 h
Allen County33.7 h
Bartholomew County27.3 h
Monroe County18.3 h
Hancock County11.1 h
Hamilton County12.2 h
Porter County17.7 h

Every named site

The list

31 of 39 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Amazon AWS Data Center – St. Joseph Campus 287
DartPoints Columbus DartPoints Bartholomew Campus 4.3
Digital Crossroad Digital Crossroad Lake Building 2.6
IU Data Center Indiana University Monroe Building 2.2
Downtown Indianapolis Data Center IND02 DataBank Marion Civic Returns 0.7
– Verizon Hancock Building 0.5
Downtown Indianapolis Data Center IND01 DataBank Marion Civic Returns 0.4
Learning GIS! – Tippecanoe Point –
Agricultural and Biological Engineering – Tippecanoe Point –
Project Zodiac Google Allen Civic Returns –
1547 SBIN1 1547 Critical Systems Realty St. Joseph Operator's own list –
Cogent Indianapolis Data Center Cogent Communications Marion Operator's own list –
Cogent South Bend Edge Data Center Cogent Communications St. Joseph Operator's own list –
Expedient IND1 Expedient Hamilton Operator's own list –
US Signal IN03 South Bend US Signal St. Joseph Operator's own list –
US Signal IN02 Indianapolis US Signal Marion Operator's own list –
US Signal IN01 Indianapolis US Signal Marion Operator's own list –
Data Center – Porter EPA record –
Dc Blox Indianapolis Data Center Ind1-A – Marion EPA record –
Digital Crossroads Of America Data Center & Central Plant – Lake EPA record –
Frontier Communications Data Center Fw – Allen EPA record –
Hobart Data Center Mass Grading - 1 – Lake EPA record –
Lilly Ltc-N K323 Modular Data Center Addition – Marion EPA record –
T5 Data Center T5 Data Centers Clark EPA record –
AWS Northern Indiana expansion (New Carlisle) Amazon Web Services St. Joseph Point –

How many data centers are in Indiana?

39 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 21st most of any state. 2 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Indiana?

7 under construction and 23 planned or announced in the Civic Returns and Server Country databases; the 15 that publish a size add up to about 9.2 GW, besides 3 AI campuses tracked by Epoch AI. 6 projects have been cancelled.

Which Indiana county has the most data centers?

St. Joseph County, with 12 operating sites, then Marion County (9) and Lake County (3).

Who operates data centers in Indiana?

Among sites that name an operator: US Signal (3), DataBank (2), Cogent Communications (2), DartPoints (1), Digital Crossroad (1).

What AI data centers are in Indiana?

Anthropic-Amazon New Carlisle in New Carlisle (1.0 GW now, 2.3 GW planned); Meta Jeffersonville in Jeffersonville (178 MW now, 241 MW planned); Google Fort Wayne in Fort Wayne (not yet drawing power, 1.0 GW planned), by Epoch AI's estimates.

What do Indiana households pay for electricity?

16.0¢ per kWh on average in 2025 (US: 17.2¢), up 30% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.