AI data center · Goodyear, Arizona

Stream Phoenix

AI campus in Maricopa County. It draws about 64 MW today and is planned to reach 267 MW by January 2030.

Power now64 MWAs of May 1, 2026
Planned peak267 MWJanuary 2030
Compute46kH100-equivalent chips now
Capital cost$2.4BSo far, 2025 dollars

Latest look · May 1, 2026

What the satellite shows

Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.

Build-out

Power, month by month

0 MW100 MW200 MW300 MW20232024202520262027202820292030Today
Power drawn by Stream Phoenix, from Epoch AI's dated observations and (hatched) its projections.
0 MW100 MW200 MW300 MW2024202620282030Today
Power drawn by Stream Phoenix, from Epoch AI's dated observations and (hatched) its projections.

Who

Owners, users and builders

Chips
H100
Water use
0.00 million gallons a day (Epoch AI estimate)
Address
2950 S. Litchfield Road
County
Maricopa County

Where

On the map of Arizona

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
West Phoenix● Natural gas1.21 GW11.9 mi
Agua Fria● Natural gas738 MW9.8 mi
Sierra Estrella Energy Storage● Storage250 MW5.4 mi
Justice Energy Storage● Storage150 MW9.3 mi
Pluto Energy Storage● Storage75 MW5.7 mi
El Sol BESS● Storage50 MW6.9 mi
Luke Solar● Solar11 MW3.4 mi
Buckeye Union HS District 201● Solar3 MW13.2 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
May 1, 2026Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.77 MW
Jan 31, 2026Major construction has finished on AI building 1, and AI building 6 has been expedited, as depicted by satellite imagery.–
Oct 30, 2022Construction beginning, as can be seen on satellite. Major renovations on western side of the non AI building (PX1), including adding generators and cooling towers.–

Plus 1 projected step to January 2030, from Epoch AI's reading of the build plans.

How much power does Stream Phoenix use?

About 64 MW as of May 1, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 267 MW in its build plans by January 2030. Running all year, 64 MW would use about 0.6 TWh.

How reliable is the power around Stream Phoenix?

In Maricopa County, the average customer is without power about 1.5 hours in a typical year in this site's outage record, with 3 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near Stream Phoenix?

8 plants within 15 miles total about 2.50 GW; the largest is West Phoenix (1.21 GW, natural gas), 11.9 miles away. Nearness does not mean it supplies the campus.

Epoch AI's sources for this campus

Source: Epoch AI, "AI data centers", CC BY 4.0, read Nov 17, 2026. Power, compute and cost are Epoch's estimates; timeline rows after today are its projections. Power plants: EIA-860M. Outage record: ORNL EAGLE-I.