Data centers · Arizona

Data centers in Arizona

110 operating data center sites, 26 projects planned or under construction and 3 AI campuses planned to draw 767 MW. Arizona ranks 6th of 51 by mapped sites.

Operating sites1103 whole campuses
AI campuses3449 MW drawn now
In the pipeline269 under construction, 17 planned
Home price15.3¢/kWh+20% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned

AI campuses

Arizona's AI data centers

CampusOwnerWhereNowPlanned
Microsoft GoodyearMicrosoftMaricopa County202 MW263 MW
Google MesaGoogleMaricopa County183 MW237 MW
Stream Phoenix–Maricopa County64 MW267 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Novva Mesa Arizona Novva Maricopa Under construction 300 MW 2026
Phoenix - El Mirage Compass Datacenters Maricopa Under construction 108 MW –
Prime Data Centers PHX01-01 Prime Data Centers Maricopa Under construction 48 MW –
Compass Datacenters Phoenix (El Mirage) campus Compass Datacenters Maricopa Under construction – –
Compass Datacenters Phoenix (Goodyear) campus Compass Datacenters Maricopa Under construction – –
Meta Mesa Data Center Meta Maricopa Under construction – –
Project Blue Data Center Beale Infrastructure Pima Under construction – 2027
QTS Phoenix 2 QTS Maricopa Under construction – –
QTS Phoenix 3 QTS Maricopa Under construction – –
Tract Phoenix Tract Maricopa Planned 1.8 GW –
Hassayampa Ranch Data Center Arizona Land Consulting Maricopa Planned 1.5 GW –
Huntley Page Data Center Huntley LLC Coconino Planned 1.0 GW –
Vermaland La Osa Data Center Park Vermaland, LLC Pinal Planned 1.0 GW –
Project Baccara Takanock, LLC Maricopa Planned 700 MW 2030
Southwest Crossing Data Center Ryan Companies Pinal Planned 400 MW –
Phoenix Campus (Menlo Digital) Menlo Digital Maricopa Planned 257 MW 2026
Stark Infrastructure PHX02 Campus Stack Infrastructure Maricopa Planned 246 MW –
Prime Data Centers: Phoenix Campus Prime Data Centers Maricopa Planned 240 MW 2025
EdgeConneX PHX11 EdgeConneX Maricopa Planned 115 MW 2027
Aligned Phoenix PHX 05 Aligned Maricopa Planned – –

Local pushback

Bans and moratoriums

2 recorded as enacted, 1 proposed or under review, 0 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Hualapai Indian Reservation · Mohave Tribal Enacted Aug 20, 2026 No end date by design — a permanent ban or standing statute
Pima County · Pima County Proposed Aug 11, 2026 Term not documented
Arizona (tax incentives) · Gila State Enacted Jul 1, 2026 to Jun 30, 2029

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Maricopa County1021.5 h
Pima County71.4 h
Cochise County10.6 h

Every named site

The list

103 of 110 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
Apple Data Center Apple Maricopa Building 31
Apple Mesa Data Center (Global Command Center) Apple Maricopa Civic Returns 30
Iron Mountain AZP-1 Iron Mountain Maricopa Campus 29
Microsoft El Mirage Campus Microsoft Maricopa Civic Returns 25
EdgeConneX PHX02 Data Center EdgeConneX Maricopa Building 15
Aligned Energy Data Center – Maricopa Building 12
Microsoft Goodyear Campus Microsoft Maricopa Civic Returns 11
Iron Mountain AZP-2 Iron Mountain Maricopa Campus 11
Stream Data Centers PHX-1 – Maricopa Building 9.4
Digital Realty Phoenix PHX15 Digital Realty Maricopa Building 6.7
PHX-11 Microsoft Maricopa Building 5.7
PHX-12 Microsoft Maricopa Building 5.7
PHX-13 Microsoft Maricopa Building 5.7
PHX-14 Microsoft Maricopa Building 5.6
PHX-10 Microsoft Maricopa Building 5.6
Vantage Data Centers Vantage Maricopa Building 5.5
Iron Mountain AZP-3 Iron Mountain Maricopa Civic Returns 5.3
Edged Phoenix Edged Maricopa Civic Returns 4.8
QTS QTS Maricopa Building 3.7
QTS QTS Maricopa Building 3.6
Iron Mountain Records Storage Iron Mountain Maricopa Building 3.3
– CyrusOne Maricopa Building 3.3
– CyrusOne Maricopa Building 3.2
– CyrusOne Maricopa Building 3.1
NTT Phoenix PH4 NTT Maricopa Civic Returns 2.9

How many data centers are in Arizona?

110 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 6th most of any state. 3 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in Arizona?

9 under construction and 17 planned or announced in the Civic Returns and Server Country databases; the 13 that publish a size add up to about 7.7 GW, besides 3 AI campuses tracked by Epoch AI.

Which Arizona county has the most data centers?

Maricopa County, with 102 operating sites, then Pima County (7) and Cochise County (1).

Who operates data centers in Arizona?

Among sites that name an operator: CyrusOne (10), Microsoft (8), Iron Mountain (5), QTS (5), NTT (4).

What AI data centers are in Arizona?

Microsoft Goodyear in Goodyear (202 MW now, 263 MW planned); Google Mesa in Mesa (183 MW now, 237 MW planned); Stream Phoenix in Goodyear (64 MW now, 267 MW planned), by Epoch AI's estimates.

What do Arizona households pay for electricity?

15.3¢ per kWh on average in 2025 (US: 17.2¢), up 20% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.