Data centers · North Carolina

Data centers in North Carolina

61 operating data center sites, 18 projects planned or under construction and 1 AI campus planned to draw 91 MW.

Operating sites612 whole campuses
AI campuses165 MW drawn now
In the pipeline186 under construction, 12 planned
Home price14.0¢/kWh+26% since 2018

The map

Every mapped site

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI) Under construction Planned Cancelled

AI campuses

North Carolina's AI data centers

CampusOwnerWhereNowPlanned
CoreWeave Marble NCCoreWeaveCherokee County65 MW91 MW

The pipeline

Projects on the way

From Civic Returns, Server Country, AI GridWatch, Megawattlas and the operators' own lists. Size is the developer's announced figure, often a full build-out over years. Projects with no published location are mapped at their city or county.

ProjectDeveloperCountyStatusAnnounced sizeYear
Microsoft Catawba County Campus Microsoft Catawba Under construction 720 MW 2034
Lyle Creek Data Center Microsoft Catawba Under construction 448 MW 2027
Raeden: Gateway Research Park ImpactData Guilford Under construction 20 MW 2026
Amazon Web Services (AWS) Richmond County Campus Amazon Web Services Richmond Under construction – 2029
CyrusOne Lee County CyrusOne Lee Under construction – –
QTS York County QTS Mecklenburg Under construction – –
Fayetteville Data Center Campus Energy Storage Solutions Cumberland Planned 900 MW 2027
Eco TIP West Moncure Data Center Eco TIP West LLC Chatham Planned 750 MW 2029
PowerHouse Charlotte PowerHouse Mecklenburg Planned 300 MW 2027
Boyd Farms Data Center Microsoft Catawba Planned 270 MW 2028
Digital Realty CLT10 East Trade Expansion Digital Realty Mecklenburg Planned 12 MW –
DC Blox - High Point Data Center DC Blox Guilford Planned 10 MW –
Compass Datacenters Statesville Campus Compass Datacenters Iredell Planned – 2028
Drox Rural Hall Data Center (Project Iron Spur) The Drox Group Forsyth Planned – –
Microsoft Person County Mega Park Microsoft Person Planned – –
Natelli Henderson Data Center Natelli Investments Vance Planned – –
Project Delta Stokes County Data Center Engineered Land Solutions Stokes Planned – –
Terra Nexus data center campus (316 Old Cheraw Highway) – Richmond Planned – –
Kingsboro Data Center Campus Energy Storage Solutions Edgecombe Cancelled 900 MW –
Natelli Investments New Hill Digital Campus (Wake County) Natelli Investments LLC Wake Cancelled 250 MW –

Local pushback

Bans and moratoriums

38 recorded as enacted, 3 proposed or under review, 6 expired, rejected or lifted (AI GridWatch). A time-limited moratorium with no documented end date keeps showing as enacted; check with the town or county.

WhereLevelStatusDateRuns
Raleigh · Wake Local Enacted Oct 6, 2026 to Apr 6, 2027
Beaufort County · Beaufort Local Enacted Oct 5, 2026 A stated duration, but the end date isn't recorded here
Columbus County · Columbus Local Enacted Oct 5, 2026 A stated duration, but the end date isn't recorded here
Hendersonville · Henderson Local Proposed Sep 3, 2026 Term not documented
Cary · Wake Local Enacted Aug 28, 2026 to Feb 28, 2028
Whiteville · Columbus Local Enacted Aug 25, 2026 to Aug 25, 2027
Durham County · Durham Local Enacted Aug 24, 2026 to May 18, 2027
Greensboro · Guilford Local Enacted Aug 18, 2026 to Feb 14, 2027
Yadkin County · Yadkin Local Enacted Aug 17, 2026 to Aug 17, 2028
Alamance County · Alamance Local Enacted Aug 17, 2026 to Aug 17, 2027
Waxhaw · Union Local Enacted Aug 11, 2026 to Aug 11, 2027
Fayetteville · Cumberland Local Rejected Aug 10, 2026 Term not documented
Farmville · Pitt Local Enacted Aug 3, 2026 to Aug 3, 2027
Edgecombe County · Edgecombe Local Enacted Aug 3, 2026 to Aug 3, 2028
Statesville · Iredell Local Proposed Aug 1, 2026 Term not documented

By county

Where the data centers cluster

CountyMapped sitesHours without power a year
Mecklenburg County135.4 h
Catawba County97.1 h
Durham County95.5 h
Wake County93.0 h
Rutherford County527 h
Forsyth County35.3 h
Caldwell County213 h
Cherokee County214 h
Richmond County216 h
Rockingham County111 h

Every named site

The list

55 of 61 operating sites carry a name or operator; the rest are on the map above only. Area is the mapped outline (land for a campus, roof for a building).

SiteOperatorCountySourceAcres
NC-1 Data Center Campus WhiteFiber / Nscale Rockingham Civic Returns 23
T5 Charlotte Campus – Cleveland Campus 8.7
Meta Meta Rutherford Building 7.3
– CyrusOne Durham Building 6.2
Core Scientific: Marble 1 Core Scientific Cherokee Civic Returns 5.7
Meta Meta Rutherford Building 5.5
Meta Meta Rutherford Building 5.3
BB&T Data Center – Wake Building 3.3
Meta Meta Rutherford Building 2.3
Spectrum Charlotte National Data Center – Mecklenburg Building 2.1
– CyrusOne Durham Building 1.9
Tierpoint Raleigh - RTP Data Center TierPoint Durham Civic Returns 1.6
Tierpoint Raleigh Data Center TierPoint Wake Civic Returns 1.5
Flexential Charlotte - North Flexential Mecklenburg Building 1.4
TierPoint - Charlotte Data Center TierPoint Mecklenburg Building 1.4
Segra Data Center – Wake Building 1.1
Flexential Charlotte - South Flexential Mecklenburg Building 0.8
Tierpoint Charlotte - North Myers Data Center TierPoint Mecklenburg Civic Returns 0.7
SEGRA – Mecklenburg Building 0.4
iGLASS Networks – Wake Building 0.2
Edge data center RA1 American Tower Wake Civic Returns 0.1
Windstream Communications – Durham Point –
Level 3 Communications – Durham Point –
Brandaleone Lab for Data and Visualization – Durham Point –
Flexential Raleigh Flexential Wake Point –

How many data centers are in North Carolina?

61 operating or permitted sites on this map, from OpenStreetMap, EPA facility records and other open sources: the 16th most of any state. 2 are mapped as whole campuses. The map covers most large sites, not every server room, so the true number is higher.

How many data centers are being built in North Carolina?

6 under construction and 12 planned or announced in the Civic Returns and Server Country databases; the 9 that publish a size add up to about 3.4 GW, besides 1 AI campus tracked by Epoch AI. 5 projects have been cancelled.

Which North Carolina county has the most data centers?

Mecklenburg County, with 13 operating sites, then Catawba County (9) and Durham County (9).

Who operates data centers in North Carolina?

Among sites that name an operator: Cogent Communications (6), Meta (5), TierPoint (4), Flexential (3), Segra (3).

What AI data centers are in North Carolina?

CoreWeave Marble NC in Marble (65 MW now, 91 MW planned), by Epoch AI's estimates.

What do North Carolina households pay for electricity?

14.0¢ per kWh on average in 2025 (US: 17.2¢), up 26% since 2018, from EIA-861. Prices move with fuel, storms and wires spending as well as new demand.

Sources: operating sites from OpenStreetMap © OpenStreetMap contributors (ODbL 1.0), read Nov 17, 2026; operators' own published facility lists; EPA ECHO facility records (public domain); Civic Returns, US Data Centers & Community Benefits Dataset (CC BY 4.0); Overture Maps places (CDLA-Permissive-2.0); Wikidata (CC0); EIA-860. Projects in development from Civic Returns, the Server Country project database, AI GridWatch and Megawattlas (all CC BY 4.0). Moratoriums from AI GridWatch (CC BY 4.0). AI campuses from Epoch AI, "AI data centers", CC BY 4.0. Electricity prices: EIA-861. Outage hours: ORNL EAGLE-I. How this is counted.