CoreWeave Marble NC

CoreWeave's AI campus in Cherokee County. It draws about 65 MW today and is planned to reach 91 MW by May 2026.

Power now65 MWAs of May 6, 2026
Planned peak91 MWMay 2026
Compute79kH100-equivalent chips now
Capital cost$2.5BSo far, 2025 dollars

Latest look · May 6, 2026

What the satellite shows

Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.

Build-out

Power, month by month

0 MW20 MW40 MW60 MW80 MW100 MW20252026
Power drawn by CoreWeave Marble NC, from Epoch AI's dated observations.
0 MW20 MW40 MW60 MW80 MW100 MW20252026
Power drawn by CoreWeave Marble NC, from Epoch AI's dated observations.

Who

Owners, users and builders

Owner
CoreWeave
Used by
OpenAI (speculative)
Chips
B200
Address
155 Palmer Ln, Marble, NC 28905
County
Cherokee County

Where

On the map of North Carolina

Operating or permitted data center AI campus, power drawn now Planned peak (Epoch AI)

Placed by its street address.

Nearby

Power plants within 15 miles

PlantSourceCapacityDistance
Nantahala● Hydro43 MW14.7 mi
Chatuge● Hydro13 MW13.4 mi
Mission● Hydro2 MW8.3 mi
Queens Creek● Hydro1 MW14.7 mi

Timeline

Every observation

DateWhat Epoch AI sawPower
May 6, 2026Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online.91 MW
Apr 17, 2026Satellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state.50 MW
Mar 13, 2026The site has been energized. Two of three data halls had been delivered at 37 billable MW, supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning.50 MW
Jun 25, 2024Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024.–

How much power does CoreWeave Marble NC use?

About 65 MW as of May 6, 2026, by Epoch AI's estimate of the whole facility's draw, rising to about 91 MW in its build plans by May 2026. Running all year, 65 MW would use about 0.6 TWh.

Who owns CoreWeave Marble NC?

CoreWeave; used by OpenAI (speculative). Labels in brackets are Epoch AI's confidence where it is not "confident".

How reliable is the power around CoreWeave Marble NC?

In Cherokee County, the average customer is without power about 14 hours in a typical year in this site's outage record, with 97 major outage events since 2014. A campus this size takes power from the high-voltage grid and has its own backup, so household figures describe the area, not the campus.

What power plants are near CoreWeave Marble NC?

4 plants within 15 miles total about 60 MW; the largest is Nantahala (43 MW, hydro), 14.7 miles away. Nearness does not mean it supplies the campus.