Where the power comes from · 2025
North Carolina
Natural gas made 41% of the electricity generated in North Carolina in 2025, the 22nd highest natural gas share of any state. In 2005, coal made 61% of it; in 2025, 13%.
The mix
North Carolina's electricity by source
Share of utility-scale generation each year, 1990–2025. Hover a year for every source.
Every plant
North Carolina's power plants
933 plants with a generator of 1 MW or more, sized by capacity and colored by main source, as of September 2026. Click one to open it.
Capacity by source
Built and retired
What came online, what shut down
Nameplate capacity that entered service (above the line) and retired (below) in North Carolina, by year. 2026 runs through September 2026.
Carbon
CO₂ for every megawatt-hour
North Carolina's power plants emitted 305 kg of CO₂ for each MWh they generated in 2024, against 592 kg in 2005: the 20th lowest of 51. 41 million metric tons in all.
North Carolina among the states
- Generation135 TWh9th
- Renewable share14%31st
- Carbon-free share46%23rd
- Cleanest electricity (kg CO₂/MWh, 2024)30520th
- Natural gas share41%22nd
- Nuclear share32%9th
- Coal share13%24th
- Solar share8.9%14th
More on North Carolina
Power outage history → Rooftop solar and home batteries → Average electric bills →Plants
The largest plants in North Carolina
By nameplate capacity, with 2025 generation and capacity factor: generation over the most the plant could make running flat out all year.
| Plant | Source | County | Capacity | Generated | Capacity factor | Since |
|---|---|---|---|---|---|---|
| Roxboro | Coal | Person | 2.6 GW | 7.0 TWh | 31% | 1966 |
| Belews Creek | Natural gas | Stokes | 2.5 GW | 7.7 TWh | 35% | 1974 |
| McGuire | Nuclear | Mecklenburg | 2.4 GW | 20 TWh | 91% | 1981 |
| Sherwood H Smith Jr Energy Complex | Natural gas | Richmond | 2.2 GW | 9.9 TWh | 50% | 2001 |
| Lincoln Combustion | Natural gas | Lincoln | 2.2 GW | 958 GWh | 5% | 1995 |
| Marshall (NC) | Natural gas | Catawba | 2.1 GW | 6.9 TWh | 37% | 1965 |
| Brunswick Nuclear | Nuclear | Brunswick | 2.0 GW | 16 TWh | 90% | 1975 |
| James E. Rogers Energy Complex | Natural gas | Cleveland | 1.5 GW | 6.2 TWh | 46% | 1972 |
| Rowan | Natural gas | Rowan | 1.2 GW | 4.3 TWh | 41% | 2001 |
| Lee Combined Cycle Plant | Natural gas | Wayne | 1.1 GW | 5.7 TWh | 61% | 2012 |
| Asheville | Natural gas | Buncombe | 1.0 GW | 3.7 TWh | 42% | 1999 |
| Wayne County Energy Complex | Natural gas | Wayne | 980 MW | 622 GWh | 7% | 2000 |
| Rockingham County CT Station | Natural gas | Rockingham | 978 MW | 1.8 TWh | 21% | 2000 |
| Harris (NC) | Nuclear | Wake | 951 MW | 7.8 TWh | 94% | 1987 |
| L V Sutton Combined Cycle | Natural gas | New Hanover | 851 MW | 3.5 TWh | 47% | 2013 |
| Mayo | Coal | Person | 763 MW | 1.3 TWh | 20% | 1983 |
| Cleveland Cnty Generating Facility | Natural gas | Cleveland | 736 MW | 986 GWh | 15% | 2012 |
| Buck | Natural gas | Rowan | 698 MW | 4.0 TWh | 65% | 2011 |
| Dan River | Natural gas | Rockingham | 698 MW | 3.9 TWh | 64% | 2012 |
| Kings Mountain Energy Center | Natural gas | Cleveland | 544 MW | 3.2 TWh | 66% | 2018 |
| Cowans Ford | Hydro | Lincoln | 350 MW | 125 GWh | 4% | 1963 |
| Anson County Generation Facility | Natural gas | Anson | 344 MW | 33 GWh | 1% | 2007 |
| Hamlet Generating Facility | Natural gas | Richmond | 344 MW | 204 GWh | 7% | 2007 |
| Butler-Warner Generation Plant | Natural gas | Cumberland | 305 MW | 113 GWh | 4% | 1976 |
| Fontana Dam | Hydro | Swain | 255 MW | 900 GWh | 40% | 1945 |
| Desert Wind Farm, LLC | Wind | Perquimans | 208 MW | 561 GWh | 31% | 2016 |
| Timbermill Wind, LLC | Wind | Chowan | 189 MW | 376 GWh | 23% | 2024 |
| Rosemary Power Station | Oil | Halifax | 180 MW | 22 GWh | 1% | 1990 |
| Gaston | Hydro | Halifax | 178 MW | 226 GWh | 14% | 1963 |
| Hiwassee Dam | Storage | Cherokee | 166 MW | 257 GWh | – | 1940 |
| W H Weatherspoon | Oil | Robeson | 163 MW | 0.4 GWh | 0% | 1970 |
| Cheoah | Hydro | Graham | 140 MW | 472 GWh | 39% | 1949 |
| American Beech Solar LLC | Solar | Halifax | 140 MW | 36 GWh | – | 2025 |
| Albemarle Beach Solar | Solar | Washington | 130 MW | 227 GWh | 20% | 2020 |
| Oak Solar | Solar | Northampton | 120 MW | 256 GWh | 24% | 2023 |
| Domtar Paper Co LLC Plymouth NC | Biomass | Martin | 114 MW | 346 GWh | 35% | 1976 |
| Narrows (NC) | Hydro | Stanly | 109 MW | 363 GWh | 38% | 1917 |
| Walters | Hydro | Haywood | 108 MW | 289 GWh | 31% | 1930 |
| Roanoke Rapids | Hydro | Halifax | 100 MW | 187 GWh | 21% | 1955 |
| Innovative Solar 37 LLC | Solar | Anson | 100 MW | 138 GWh | 16% | 2017 |
| Fern Solar LLC | Solar | Edgecombe | 100 MW | 213 GWh | 24% | 2020 |
| Oak Trail Solar, LLC | Solar | Currituck | 100 MW | 235 GWh | 27% | 2023 |
| Knightdale Battery | Storage | Wake | 100 MW | -1.5 GWh | – | 2025 |
| Aulander Holloman Solar, LLC | Solar | Hertford | 99 MW | 168 GWh | 19% | 2018 |
| Blewett | Oil | Anson | 95 MW | 98 GWh | 12% | 1912 |
| Tillery | Hydro | Montgomery | 84 MW | 118 GWh | 16% | 1928 |
| International Paper Riegelwood Mill | Biomass | Columbus | 84 MW | 352 GWh | 48% | 1976 |
| Wilkinson Solar LLC | Solar | Beaufort | 81 MW | 161 GWh | 23% | 2019 |
| Conetoe II Solar, LLC | Solar | Edgecombe | 80 MW | 153 GWh | 22% | 2015 |
| Harts Mill Solar, LLC | Solar | Edgecombe | 80 MW | 173 GWh | 25% | 2020 |
| Red Bud Solar Plant | Solar | Nash | 80 MW | 28 GWh | – | 2025 |
| Gutenberg Solar | Solar | Northampton | 80 MW | 148 GWh | 21% | 2019 |
| Phobos Solar, LLC | Solar | Nash | 79 MW | 172 GWh | 25% | 2023 |
| Trent River Solar, LLC | Solar | Jones | 79 MW | 137 GWh | 20% | 2021 |
| Innovative Solar 46 | Solar | Cumberland | 79 MW | 128 GWh | 19% | 2016 |
| Pecan Solar | Solar | Northampton | 75 MW | 153 GWh | 23% | 2018 |
| Chestnut Solar | Solar | Halifax | 75 MW | 147 GWh | 22% | 2020 |
| Rutherford Farm | Solar | Rutherford | 75 MW | 136 GWh | 21% | 2016 |
| NC 102 Project LLC | Solar | Cabarrus | 75 MW | 140 GWh | 21% | 2018 |
| Misenheimer Solar LLC | Solar | Stanly | 74 MW | 161 GWh | 25% | 2024 |
| Innovative Solar 42 | Solar | Bladen | 71 MW | 95 GWh | 15% | 2017 |
| Cabin Creek Solar, LLC | Solar | Montgomery | 70 MW | 163 GWh | 27% | 2023 |
| Crooked Run | Solar | Pender | 70 MW | 137 GWh | 22% | 2019 |
| Bay Tree | Solar | Bladen | 70 MW | 147 GWh | 24% | 2021 |
| Maiden Creek Solar Power Plant | Solar | Catawba | 69 MW | 117 GWh | 19% | 2021 |
| Warsaw Farm | Solar | Duplin | 65 MW | 105 GWh | 19% | 2015 |
| Shoe Creek Solar, LLC | Solar | Scotland | 65 MW | 130 GWh | 23% | 2017 |
| Hawtree Solar | Solar | Warren | 65 MW | 126 GWh | 22% | 2021 |
| Summit Farms Solar | Solar | Currituck | 62 MW | 87 GWh | 16% | 2017 |
| Mountain Island | Hydro | Gaston | 60 MW | 90 GWh | 17% | 1923 |
| Ranchland Solar, LLC | Solar | Currituck | 60 MW | 99 GWh | 19% | 2017 |
| Sugar Solar, LLC | Solar | Yadkin | 60 MW | 110 GWh | 21% | 2021 |
| Monroe Solar Facility | Solar | Union | 55 MW | 91 GWh | 19% | 2017 |
| PCS Phosphate | Other | Beaufort | 54 MW | 206 GWh | 44% | 1984 |
| Archer Daniels Midland Southport | Natural gas | Brunswick | 53 MW | 0.0 GWh | – | 1992 |
| Buckleberry Solar | Solar | Lenoir | 52 MW | 96 GWh | 21% | 2018 |
| Innovative Solar 43, LLC | Solar | Bladen | 51 MW | 64 GWh | 14% | 2016 |
| Brantley Solar | Solar | Nash | 50 MW | 98 GWh | 22% | 2018 |
| Fox Creek Solar | Solar | Franklin | 50 MW | 85 GWh | 19% | 2018 |
| Craven County Wood Energy LP | Biomass | Craven | 50 MW | 284 GWh | 65% | 1990 |
| Innovative Solar 54 | Solar | Lenoir | 50 MW | 98 GWh | 22% | 2018 |
| Bullock Solar, LLC | Solar | Vance | 50 MW | 101 GWh | 23% | 2017 |
| Bladen Solar | Solar | Bladen | 50 MW | 103 GWh | 24% | 2017 |
| Broad River Solar, LLC | Solar | Cleveland | 50 MW | 106 GWh | 24% | 2021 |
| Lick Creek Solar, LLC | Solar | Stokes | 50 MW | 110 GWh | 25% | 2022 |
| Partin Solar | Solar | Surry | 50 MW | 86 GWh | 20% | 2023 |
| Stanly Solar, LLC | Solar | Stanly | 50 MW | 89 GWh | 20% | 2022 |
| Allen 1 Battery Energy Storage System | Storage | Gaston | 50 MW | -1.5 GWh | – | 2025 |
| Highest Power Solar, LLC | Solar | Franklin | 49 MW | 90 GWh | 21% | 2022 |
| Eden Solar LLC | Solar | Richmond | 48 MW | 80 GWh | 19% | 2015 |
| Santeetlah | Hydro | Graham | 45 MW | 130 GWh | 33% | 1928 |
| Nantahala | Hydro | Macon | 43 MW | 188 GWh | 50% | 1942 |
| Tuckertown Hydro | Hydro | Montgomery | 42 MW | 96 GWh | 26% | 1962 |
| Elm City Solar Facility | Solar | Wilson | 40 MW | 58 GWh | 16% | 2016 |
| International Paper Co. - New Bern Mill | Biomass | Craven | 38 MW | 205 GWh | 61% | 2014 |
| Oxford Dam | Hydro | Catawba | 36 MW | 87 GWh | 27% | 1928 |
| Innovative Solar 31 | Solar | Bladen | 35 MW | 54 GWh | 18% | 2017 |
| Virginia Line Solar, LLC | Solar | Warren | 35 MW | 80 GWh | 26% | 2023 |
| Lumberton | Biomass | Robeson | 35 MW | – | – | 1985 |
| Innovative Solar 47 | Solar | Robeson | 34 MW | 52 GWh | 17% | 2017 |
Coming next
Planned projects
The largest generators reported as planned in North Carolina, by expected year. Plans change; some will be delayed or cancelled.
| Project | Source | County | Capacity | Expected |
|---|---|---|---|---|
| Allen 2 BESS | Storage | Gaston | 167 MW | 2027 |
| Sweetleaf Solar LLC | Solar | Halifax | 93 MW | 2027 |
| Halifax County Solar | Solar | Halifax | 80 MW | 2026 |
| Gum Swamp Solar, LLC | Solar | Scotland | 80 MW | 2027 |
| Scotch Grove Solar | Solar | Scotland | 80 MW | 2027 |
| South Davidson | Solar | Davidson | 80 MW | 2027 |
| Sleepy Creek Solar, LLC | Solar | Bladen | 80 MW | 2027 |
| Black Walnut Solar, LLC | Solar | Jones | 80 MW | 2027 |
| Hyco Solar LLC | Solar | Person | 80 MW | 2027 |
| Panther Branch Solar, LLC | Solar | Duplin | 80 MW | 2028 |
| Robeson Solar I | Solar | Robeson | 80 MW | 2028 |
| Timber Mill Solar | Solar | Jones | 80 MW | 2028 |
| Stevens Mill Solar | Solar | Wayne | 80 MW | 2030 |
| Edgecombe Solar LLC | Solar | Edgecombe | 75 MW | 2027 |
| Hornet Solar | Solar | Gaston | 73 MW | 2026 |
| Maple Leaf Solar | Solar | Johnston | 73 MW | 2027 |
| Westminister NC | Solar | Rutherford | 60 MW | 2028 |
| New Hill 1 Battery | Storage | Wake | 56 MW | 2027 |
| Healing Springs Solar, LLC | Solar | Davidson | 55 MW | 2027 |
| Maiden Creek Battery | Storage | Catawba | 50 MW | 2027 |
| Westfield Solar, LLC | Solar | Hoke | 40 MW | 2026 |
| West River Solar, LLC | Solar | Guilford | 40 MW | 2027 |
| Clark Creek Solar Plant | Solar | Lincoln | 40 MW | 2028 |
| Quaker Creek Farm Solar | Solar | Alamance | 35 MW | 2027 |
| Bear Branch Solar | Solar | Stokes | 35 MW | 2027 |
| Black Walnut Solar, LLC | Storage | Jones | 32 MW | 2028 |
| Panther Branch Solar, LLC | Storage | Duplin | 32 MW | 2029 |
| Timber Mill Solar | Storage | Jones | 32 MW | 2028 |
| Baxter Creek Solar | Solar | Davie | 30 MW | 2026 |
| Robeson Solar I | Storage | Robeson | 28 MW | 2028 |
Shut down
Retired since 2010
The largest generators retired in North Carolina since 2010.
| Plant | Source | Capacity | Retired |
|---|---|---|---|
| L V Sutton Steam | Coal | 447 MW | 2013 |
| G G Allen | Coal | 278 MW | 2021 |
| G G Allen | Coal | 272 MW | 2024 |
| G G Allen | Coal | 272 MW | 2021 |
| HF Lee Plant | Coal | 252 MW | 2012 |
| Asheville | Coal | 207 MW | 2020 |
| Asheville | Coal | 207 MW | 2020 |
| Cape Fear | Coal | 188 MW | 2012 |
| Roanoke Valley Energy Facility I | Coal | 182 MW | 2017 |
| G G Allen | Coal | 163 MW | 2024 |
| G G Allen | Coal | 163 MW | 2021 |
| Dan River | Coal | 150 MW | 2012 |
| Cape Fear | Coal | 141 MW | 2012 |
| Riverbend | Coal | 133 MW | 2013 |
| Riverbend | Coal | 133 MW | 2013 |
| Buck | Coal | 125 MW | 2013 |
| Buck | Coal | 125 MW | 2013 |
| L V Sutton Steam | Coal | 113 MW | 2013 |
| L V Sutton Steam | Coal | 113 MW | 2013 |
| Riverbend | Coal | 100 MW | 2013 |
| Riverbend | Coal | 100 MW | 2013 |
| Buck | Coal | 80 MW | 2011 |
| HF Lee Plant | Coal | 75 MW | 2012 |
| HF Lee Plant | Coal | 75 MW | 2012 |
| W H Weatherspoon | Coal | 74 MW | 2011 |
| Dan River | Coal | 70 MW | 2012 |
| Dan River | Coal | 70 MW | 2012 |
| CPI USA NC Southport | Biomass | 68 MW | 2021 |
| CPI USA NC Southport | Biomass | 68 MW | 2021 |
| CPI USA NC Roxboro | Biomass | 68 MW | 2021 |
Sources: U.S. Energy Information Administration: state historical generation tables (1990–2025), Form EIA-860M generator inventory (September 2026) and Form EIA-923 plant generation. Shares leave out pumped storage. Rooftop solar is not included. Methodology.