Solar power plant · Gaston, NC
High Shoals PV1
High Shoals PV1 is a 16 MW solar power plant in Gaston County, North Carolina, operated by SunStrong Management. Its oldest generator still running came online in 2022. In 2025 it generated 31 GWh, about what 2,500 average North Carolina homes use in a year.
High Shoals PV1 in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 84th largest, about 0.2% of the state's 7.1 GW of solar capacity.
Gaston County has 13 power plants of 1 MW or more with 195 MW in all; High Shoals PV1 is 8% of that and the 2nd largest of 5 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Gaston County goes 5.8 hours a year without power, the 73rd most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
High Shoals PV1 (outlined) and other plants in Gaston County, shaded. 35.396, -81.219.
Plant facts
- Operator
- SunStrong Management
- Sector
- IPP Non-CHP
- Grid operator
- DUK
- County
- Gaston County, NC
- EIA plant ID
- 59997
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| HISHO | Solar Photovoltaic | 16 MW | 2022 | – |
Nearby
Other plants in Gaston County
Questions
High Shoals PV1, answered
How much power does High Shoals PV1 produce?
High Shoals PV1 has 16 MW of capacity from one generator. In 2025 it generated 31 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does High Shoals PV1 power?
Its 2025 output of 31 GWh equals the yearly electricity use of about 2,500 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is High Shoals PV1?
High Shoals PV1 is in Gaston County, North Carolina, at about 35.396°, -81.219°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Gaston County goes 5.8 hours a year without power, the 73rd most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates High Shoals PV1?
It is operated by SunStrong Management (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.
When did High Shoals PV1 open?
Its oldest generator still running came online in 2022.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.