Storage power plant · Gaston, NC
Allen 1 Battery Energy Storage System
Allen 1 Battery Energy Storage System is a 50 MW storage power plant in Gaston County, North Carolina, operated by Duke Energy Carolinas, LLC. Its oldest generator still running came online in 2025.
Allen 1 Battery Energy Storage System in context
Among the 39 storage plants in North Carolina in the EIA's inventory, it is the 3rd largest, about 8.9% of the state's 562 MW of storage capacity.
Gaston County has 13 power plants of 1 MW or more with 195 MW in all; Allen 1 Battery Energy Storage System is 26% of that.
The average electricity customer in Gaston County goes 5.8 hours a year without power, the 73rd most of 100 counties in North Carolina. The county's page has the full outage record.
Where it is
Allen 1 Battery Energy Storage System (outlined) and other plants in Gaston County, shaded. 35.190, -81.027.
Plant facts
- Operator
- Duke Energy Carolinas, LLC
- Sector
- Electric Utility
- Grid operator
- DUK
- County
- Gaston County, NC
- EIA plant ID
- 69171
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| ALBA1 | Batteries | 50 MW · 200 MWh | 2025 | – |
Nearby
Other plants in Gaston County
Questions
Allen 1 Battery Energy Storage System, answered
How much can Allen 1 Battery Energy Storage System store and deliver?
Allen 1 Battery Energy Storage System can deliver up to 50 MW and hold 200 MWh of energy, from one battery or storage system. Its net energy in 2025 was -1.5 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is Allen 1 Battery Energy Storage System?
Allen 1 Battery Energy Storage System is in Gaston County, North Carolina, at about 35.190°, -81.027°. It is one of 13 power plants of 1 MW or more in the county. The average electricity customer in Gaston County goes 5.8 hours a year without power, the 73rd most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Allen 1 Battery Energy Storage System?
It is operated by Duke Energy Carolinas, LLC (EIA sector: Electric Utility), and it feeds Duke Energy Carolinas.
When did Allen 1 Battery Energy Storage System open?
Its oldest generator still running came online in 2025.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.