Solar power plant · Northampton, NC
Oak Solar
Oak Solar is a 120 MW solar power plant in Northampton County, North Carolina, operated by Oak Solar LLC. Its oldest generator still running came online in 2023. In 2025 it generated 256 GWh, about what 20,000 average North Carolina homes use in a year.
Oak Solar in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 3rd largest, about 1.7% of the state's 7.1 GW of solar capacity.
Northampton County has 17 power plants of 1 MW or more with 363 MW in all; Oak Solar is 33% of that and the largest of 17 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Northampton County goes 8.6 hours a year without power, the 51st most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Oak Solar (outlined) and other plants in Northampton County, shaded. 36.526, -77.774.
Plant facts
- Operator
- Oak Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Northampton County, NC
- EIA plant ID
- 67161
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| OAK | Solar Photovoltaic | 120 MW | 2023 | – |
Nearby
Other plants in Northampton County
Questions
Oak Solar, answered
How much power does Oak Solar produce?
Oak Solar has 120 MW of capacity from one generator. In 2025 it generated 256 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Oak Solar power?
Its 2025 output of 256 GWh equals the yearly electricity use of about 20,000 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Oak Solar?
Oak Solar is in Northampton County, North Carolina, at about 36.526°, -77.774°. It is one of 17 power plants of 1 MW or more in the county. The average electricity customer in Northampton County goes 8.6 hours a year without power, the 51st most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Oak Solar?
It is operated by Oak Solar LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Oak Solar open?
Its oldest generator still running came online in 2023.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.