Solar power plant · Caldwell, NC
Brighter Future Solar
Brighter Future Solar is a 11 MW solar power plant in Caldwell County, North Carolina, operated by Brighter Future Solar LLC. Its oldest generator still running came online in 2022. In 2025 it generated 21 GWh, about what 1,700 average North Carolina homes use in a year.
Brighter Future Solar in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 95th largest, about 0.2% of the state's 7.1 GW of solar capacity.
Caldwell County has 4 power plants of 1 MW or more with 40 MW in all; Brighter Future Solar is 28% of that and the largest of 2 solar plants there.
Its capacity factor of 22% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Caldwell County goes 13 hours a year without power, the 33rd most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Brighter Future Solar (outlined) and other plants in Caldwell County, shaded. 35.816, -81.372.
Plant facts
- Operator
- Brighter Future Solar LLC
- Sector
- IPP Non-CHP
- Grid operator
- DUK
- County
- Caldwell County, NC
- EIA plant ID
- 64910
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BFSNC | Solar Photovoltaic | 11 MW | 2022 | 2052 |
Nearby
Other plants in Caldwell County
Questions
Brighter Future Solar, answered
How much power does Brighter Future Solar produce?
Brighter Future Solar has 11 MW of capacity from one generator. In 2025 it generated 21 GWh, 22% of the most it could have made running flat out all year (its capacity factor).
How many homes does Brighter Future Solar power?
Its 2025 output of 21 GWh equals the yearly electricity use of about 1,700 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Brighter Future Solar?
Brighter Future Solar is in Caldwell County, North Carolina, at about 35.816°, -81.372°. It is one of 4 power plants of 1 MW or more in the county. The average electricity customer in Caldwell County goes 13 hours a year without power, the 33rd most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Brighter Future Solar?
It is operated by Brighter Future Solar LLC (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.
When did Brighter Future Solar open?
Its oldest generator still running came online in 2022. Planned retirements are scheduled for 2052.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.