Solar power plant · Currituck, NC

Ranchland Solar, LLC

Ranchland Solar, LLC is a 60 MW solar power plant in Currituck County, North Carolina, operated by Ranchland Solar, LLC. Its oldest generator still running came online in 2017. In 2025 it generated 99 GWh, about what 7,900 average North Carolina homes use in a year.

Capacity60 MWNameplate, September 2026
Generated99 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators1Oldest from 2017

Ranchland Solar, LLC in context

Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 30th largest, about 0.8% of the state's 7.1 GW of solar capacity.

Currituck County has 5 power plants of 1 MW or more with 262 MW in all; Ranchland Solar, LLC is 23% of that and the 3rd largest of 5 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Currituck County goes 6.6 hours a year without power, the 63rd most of 100 counties in North Carolina. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020182019202020212022202320242025GWh 99
050100150201920212023202599

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Ranchland Solar, LLC (outlined) and other plants in Currituck County, shaded. 36.473, -76.154.

Plant facts

Operator
Ranchland Solar, LLC
Sector
IPP Non-CHP
Grid operator
PJM
County
Currituck County, NC
EIA plant ID
61813
Where North Carolina's power comes from → North Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
RCHLD Solar Photovoltaic 60 MW 2017 –

Questions

Ranchland Solar, LLC, answered

How much power does Ranchland Solar, LLC produce?

Ranchland Solar, LLC has 60 MW of capacity from one generator. In 2025 it generated 99 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Ranchland Solar, LLC power?

Its 2025 output of 99 GWh equals the yearly electricity use of about 7,900 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Ranchland Solar, LLC?

Ranchland Solar, LLC is in Currituck County, North Carolina, at about 36.473°, -76.154°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Currituck County goes 6.6 hours a year without power, the 63rd most of 100 counties in North Carolina. The county's page has the full outage record.

Who operates Ranchland Solar, LLC?

It is operated by Ranchland Solar, LLC (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Ranchland Solar, LLC open?

Its oldest generator still running came online in 2017.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.