Solar power plant · Cabarrus, NC

NC 102 Project LLC

NC 102 Project LLC is a 75 MW solar power plant in Cabarrus County, North Carolina, operated by NC 102 Project LLC. Its oldest generator still running came online in 2018. In 2025 it generated 140 GWh, about what 11,000 average North Carolina homes use in a year.

Capacity75 MWNameplate, September 2026
Generated140 GWhIn 2025
Capacity factor21%Share of the most it could make, 2025
Generators1Oldest from 2018

NC 102 Project LLC in context

Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 19th largest, about 1.1% of the state's 7.1 GW of solar capacity.

Cabarrus County has 7 power plants of 1 MW or more with 128 MW in all; NC 102 Project LLC is 58% of that and the largest of 5 solar plants there.

Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Cabarrus County goes 4.1 hours a year without power, the 88th most of 100 counties in North Carolina. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

05010015020020182019202020212022202320242025GWh 140
0501001502002019202120232025140

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

NC 102 Project LLC (outlined) and other plants in Cabarrus County, shaded. 35.292, -80.498.

Plant facts

Operator
NC 102 Project LLC
Sector
IPP Non-CHP
Grid operator
DUK
County
Cabarrus County, NC
EIA plant ID
61610
Where North Carolina's power comes from → North Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
NC102 Solar Photovoltaic 75 MW 2018 –

Nearby

Other plants in Cabarrus County

Speedway Solar NC, LLC · 23 MWConcord Energy · 11 MWGRS CMS · 5.3 MWViolet Solar · 5.0 MWHowell Midland Farm, LLC · 4.9 MWConcord Farm · 4.5 MW

Questions

NC 102 Project LLC, answered

How much power does NC 102 Project LLC produce?

NC 102 Project LLC has 75 MW of capacity from one generator. In 2025 it generated 140 GWh, 21% of the most it could have made running flat out all year (its capacity factor).

How many homes does NC 102 Project LLC power?

Its 2025 output of 140 GWh equals the yearly electricity use of about 11,000 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is NC 102 Project LLC?

NC 102 Project LLC is in Cabarrus County, North Carolina, at about 35.292°, -80.498°. It is one of 7 power plants of 1 MW or more in the county. The average electricity customer in Cabarrus County goes 4.1 hours a year without power, the 88th most of 100 counties in North Carolina. The county's page has the full outage record.

Who operates NC 102 Project LLC?

It is operated by NC 102 Project LLC (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.

When did NC 102 Project LLC open?

Its oldest generator still running came online in 2018.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.