Wind power plant · Chowan, NC
Timbermill Wind, LLC
Timbermill Wind, LLC is a 189 MW wind power plant in Chowan County, North Carolina, operated by Timbermill Wind. Its oldest generator still running came online in 2024. In 2025 it generated 376 GWh, about what 30,000 average North Carolina homes use in a year.
Timbermill Wind, LLC in context
Among the 2 wind plants in North Carolina in the EIA's inventory, it is the 2nd largest, about 48% of the state's 397 MW of wind capacity.
Chowan County has 6 power plants of 1 MW or more with 211 MW in all; Timbermill Wind, LLC is 89% of that.
Its capacity factor of 23% in 2025 is lower than the 32% typical for wind plants across the US.
The average electricity customer in Chowan County goes 1.7 hours a year without power, the 99th most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Timbermill Wind, LLC (outlined) and other plants in Chowan County, shaded. 36.152, -76.601.
Plant facts
- Operator
- Timbermill Wind
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Chowan County, NC
- EIA plant ID
- 67910
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| TIMBY | Onshore Wind Turbine | 189 MW | 2024 | – |
Nearby
Other plants in Chowan County
Questions
Timbermill Wind, LLC, answered
How much power does Timbermill Wind, LLC produce?
Timbermill Wind, LLC has 189 MW of capacity from one generator. In 2025 it generated 376 GWh, 23% of the most it could have made running flat out all year (its capacity factor).
How many homes does Timbermill Wind, LLC power?
Its 2025 output of 376 GWh equals the yearly electricity use of about 30,000 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Timbermill Wind, LLC?
Timbermill Wind, LLC is in Chowan County, North Carolina, at about 36.152°, -76.601°. It is one of 6 power plants of 1 MW or more in the county. The average electricity customer in Chowan County goes 1.7 hours a year without power, the 99th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Timbermill Wind, LLC?
It is operated by Timbermill Wind (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Timbermill Wind, LLC open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2024–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.