Storage power plant · Buncombe, NC

Asheville BESS

Asheville BESS is a 17 MW storage power plant in Buncombe County, North Carolina, operated by Duke Energy Progress - (NC). Its oldest generator still running came online in 2026.

Capacity17 MWNameplate, September 2026
Net energy–Not reported
Capacity factor–Not a full year of data
Generators1Oldest from 2026

Asheville BESS in context

Among the 39 storage plants in North Carolina in the EIA's inventory, it is the 6th largest, about 3.1% of the state's 562 MW of storage capacity.

Buncombe County has 8 power plants of 1 MW or more with 1.1 GW in all; Asheville BESS is 2% of that and the 2nd largest of 3 storage plants there.

The average electricity customer in Buncombe County goes 20 hours a year without power, the 13th most of 100 counties in North Carolina. The county's page has the full outage record.

Where it is

Asheville BESS (outlined) and other plants in Buncombe County, shaded. 35.472, -82.542.

Plant facts

Operator
Duke Energy Progress - (NC)
Sector
Electric Utility
Grid operator
CPLW
County
Buncombe County, NC
EIA plant ID
69429
Where North Carolina's power comes from → North Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
AVLB1 Batteries 17 MW · 69 MWh 2026 –

Nearby

Other plants in Buncombe County

Asheville · 1.0 GWCraggy Energy Storage · 31 MWAsheville-Rock Hill Battery · 8.8 MWWoodfin Solar · 5.0 MWInnovative Solar 6 · 3.6 MWMetropolitan Sewerage District · 2.4 MWBiltmore Solar Fields · 1.5 MW

Questions

Asheville BESS, answered

How much can Asheville BESS store and deliver?

Asheville BESS can deliver up to 17 MW and hold 69 MWh of energy, from one battery or storage system.

Where is Asheville BESS?

Asheville BESS is in Buncombe County, North Carolina, at about 35.472°, -82.542°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Buncombe County goes 20 hours a year without power, the 13th most of 100 counties in North Carolina. The county's page has the full outage record.

Who operates Asheville BESS?

It is operated by Duke Energy Progress - (NC) (EIA sector: Electric Utility), and it feeds balancing authority CPLW.

When did Asheville BESS open?

Its oldest generator still running came online in 2026.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.