Storage power plant · Buncombe, NC
Asheville BESS
Asheville BESS is a 17 MW storage power plant in Buncombe County, North Carolina, operated by Duke Energy Progress - (NC). Its oldest generator still running came online in 2026.
Asheville BESS in context
Among the 39 storage plants in North Carolina in the EIA's inventory, it is the 6th largest, about 3.1% of the state's 562 MW of storage capacity.
Buncombe County has 8 power plants of 1 MW or more with 1.1 GW in all; Asheville BESS is 2% of that and the 2nd largest of 3 storage plants there.
The average electricity customer in Buncombe County goes 20 hours a year without power, the 13th most of 100 counties in North Carolina. The county's page has the full outage record.
Where it is
Asheville BESS (outlined) and other plants in Buncombe County, shaded. 35.472, -82.542.
Plant facts
- Operator
- Duke Energy Progress - (NC)
- Sector
- Electric Utility
- Grid operator
- CPLW
- County
- Buncombe County, NC
- EIA plant ID
- 69429
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| AVLB1 | Batteries | 17 MW · 69 MWh | 2026 | – |
Nearby
Other plants in Buncombe County
Questions
Asheville BESS, answered
How much can Asheville BESS store and deliver?
Asheville BESS can deliver up to 17 MW and hold 69 MWh of energy, from one battery or storage system.
Where is Asheville BESS?
Asheville BESS is in Buncombe County, North Carolina, at about 35.472°, -82.542°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Buncombe County goes 20 hours a year without power, the 13th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Asheville BESS?
It is operated by Duke Energy Progress - (NC) (EIA sector: Electric Utility), and it feeds balancing authority CPLW.
When did Asheville BESS open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.