Solar power plant · Onslow, NC
Camp Lejeune Solar and Energy Storage
Camp Lejeune Solar and Energy Storage is a 13 MW solar power plant in Onslow County, North Carolina, operated by Duke Energy Progress - (NC). Its oldest generator still running came online in 2015. In 2025 it generated 21 GWh, about what 1,700 average North Carolina homes use in a year.
Camp Lejeune Solar and Energy Storage in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 92nd largest, about 0.2% of the state's 7.1 GW of solar capacity.
Onslow County has 9 power plants of 1 MW or more with 46 MW in all; Camp Lejeune Solar and Energy Storage is 28% of that and the largest of 6 solar plants there.
Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Onslow County goes 15 hours a year without power, the 24th most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Camp Lejeune Solar and Energy Storage (outlined) and other plants in Onslow County, shaded. 34.726, -77.350.
Plant facts
- Operator
- Duke Energy Progress - (NC)
- Sector
- Electric Utility
- Grid operator
- DUK
- County
- Onslow County, NC
- EIA plant ID
- 59966
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 13 MW | 2015 | – |
Retired
| Generator | Technology | Capacity | Online | Retired |
|---|---|---|---|---|
| ES1 | Batteries | 11 MW | 2023 | 2023 |
Nearby
Other plants in Onslow County
Questions
Camp Lejeune Solar and Energy Storage, answered
How much power does Camp Lejeune Solar and Energy Storage produce?
Camp Lejeune Solar and Energy Storage has 13 MW of capacity from one generator. In 2025 it generated 21 GWh, 19% of the most it could have made running flat out all year (its capacity factor).
How many homes does Camp Lejeune Solar and Energy Storage power?
Its 2025 output of 21 GWh equals the yearly electricity use of about 1,700 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Camp Lejeune Solar and Energy Storage?
Camp Lejeune Solar and Energy Storage is in Onslow County, North Carolina, at about 34.726°, -77.350°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Onslow County goes 15 hours a year without power, the 24th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Camp Lejeune Solar and Energy Storage?
It is operated by Duke Energy Progress - (NC) (EIA sector: Electric Utility), and it feeds Duke Energy Carolinas.
When did Camp Lejeune Solar and Energy Storage open?
Its oldest generator still running came online in 2015.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.