Solar power plant · Pender, NC
Innovative Solar 67
Innovative Solar 67 is a 33 MW solar power plant in Pender County, North Carolina, operated by John Laing US Solar Corp.. Its oldest generator still running came online in 2018. In 2025 it generated 62 GWh, about what 4,900 average North Carolina homes use in a year.
Innovative Solar 67 in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 50th largest, about 0.5% of the state's 7.1 GW of solar capacity.
Pender County has 9 power plants of 1 MW or more with 137 MW in all; Innovative Solar 67 is 24% of that and the 2nd largest of 8 solar plants there.
Its capacity factor of 21% in 2025 is close to the 20% typical for solar plants across the US.
The average electricity customer in Pender County goes 15 hours a year without power, the 25th most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Innovative Solar 67 (outlined) and other plants in Pender County, shaded. 34.623, -78.005.
Plant facts
- Operator
- John Laing US Solar Corp.
- Sector
- IPP Non-CHP
- Grid operator
- CPLE
- County
- Pender County, NC
- EIA plant ID
- 59678
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| IS067 | Solar Photovoltaic | 33 MW | 2018 | – |
Nearby
Other plants in Pender County
Questions
Innovative Solar 67, answered
How much power does Innovative Solar 67 produce?
Innovative Solar 67 has 33 MW of capacity from one generator. In 2025 it generated 62 GWh, 21% of the most it could have made running flat out all year (its capacity factor).
How many homes does Innovative Solar 67 power?
Its 2025 output of 62 GWh equals the yearly electricity use of about 4,900 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Innovative Solar 67?
Innovative Solar 67 is in Pender County, North Carolina, at about 34.623°, -78.005°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Pender County goes 15 hours a year without power, the 25th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Innovative Solar 67?
It is operated by John Laing US Solar Corp. (EIA sector: IPP Non-CHP), and it feeds balancing authority CPLE.
When did Innovative Solar 67 open?
Its oldest generator still running came online in 2018.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2018–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.