Solar power plant · Warren, NC

Five Forks Solar

Five Forks Solar is a 20 MW solar power plant in Warren County, North Carolina, operated by Five Forks Solar. Its oldest generator still running came online in 2019. In 2025 it generated 33 GWh, about what 2,600 average North Carolina homes use in a year.

Capacity20 MWNameplate, September 2026
Generated33 GWhIn 2025
Capacity factor19%Share of the most it could make, 2025
Generators1Oldest from 2019

Five Forks Solar in context

Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 71st largest, about 0.3% of the state's 7.1 GW of solar capacity.

Warren County has 11 power plants of 1 MW or more with 154 MW in all; Five Forks Solar is 13% of that and the 3rd largest of 11 solar plants there.

Its capacity factor of 19% in 2025 is close to the 20% typical for solar plants across the US.

The average electricity customer in Warren County goes 8.0 hours a year without power, the 53rd most of 100 counties in North Carolina. The county's page has the full outage record.

Output

Generation, year by year

Net generation in GWh, as reported to the EIA on Form 923.

010203040502019202020212022202320242025GWh 33
01020304050201920212023202533

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Five Forks Solar (outlined) and other plants in Warren County, shaded. 36.516, -78.034.

Plant facts

Operator
Five Forks Solar
Sector
IPP Non-CHP
Grid operator
PJM
County
Warren County, NC
EIA plant ID
59951
Where North Carolina's power comes from → North Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
5FRK Solar Photovoltaic 20 MW 2019 –

Nearby

Other plants in Warren County

Hawtree Solar · 65 MWVirginia Line Solar, LLC · 35 MWBolton Farm · 5.0 MWSun Devil Solar · 5.0 MWRed Hill Solar Center, LLC · 5.0 MWWarrenton I Solar · 4.9 MWWarrenton Farm · 4.0 MWEagle Solar · 4.0 MW

Questions

Five Forks Solar, answered

How much power does Five Forks Solar produce?

Five Forks Solar has 20 MW of capacity from one generator. In 2025 it generated 33 GWh, 19% of the most it could have made running flat out all year (its capacity factor).

How many homes does Five Forks Solar power?

Its 2025 output of 33 GWh equals the yearly electricity use of about 2,600 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Five Forks Solar?

Five Forks Solar is in Warren County, North Carolina, at about 36.516°, -78.034°. It is one of 11 power plants of 1 MW or more in the county. The average electricity customer in Warren County goes 8.0 hours a year without power, the 53rd most of 100 counties in North Carolina. The county's page has the full outage record.

Who operates Five Forks Solar?

It is operated by Five Forks Solar (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.

When did Five Forks Solar open?

Its oldest generator still running came online in 2019.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.