Storage power plant · Hoke, NC
McLauchin
McLauchin is a 15 MW storage power plant in Hoke County, North Carolina, operated by North Carolina El Member Corp. Its oldest generator still running came online in 2024.
McLauchin in context
Among the 39 storage plants in North Carolina in the EIA's inventory, it is the 8th largest, about 2.7% of the state's 562 MW of storage capacity.
Hoke County has 5 power plants of 1 MW or more with 35 MW in all; McLauchin is 43% of that.
The average electricity customer in Hoke County goes 6.2 hours a year without power, the 66th most of 100 counties in North Carolina. The county's page has the full outage record.
Where it is
McLauchin (outlined) and other plants in Hoke County, shaded. 34.996, -79.107.
Plant facts
- Operator
- North Carolina El Member Corp
- Sector
- Electric Utility
- Grid operator
- CPLE
- County
- Hoke County, NC
- EIA plant ID
- 67041
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| BAT1 | Batteries | 15 MW · 30 MWh | 2024 | – |
Nearby
Other plants in Hoke County
Questions
McLauchin, answered
How much can McLauchin store and deliver?
McLauchin can deliver up to 15 MW and hold 30 MWh of energy, from one battery or storage system. Its net energy in 2025 was -0.6 GWh: a storage plant uses more energy charging than it returns, so the figure is usually negative.
Where is McLauchin?
McLauchin is in Hoke County, North Carolina, at about 34.996°, -79.107°. It is one of 5 power plants of 1 MW or more in the county. The average electricity customer in Hoke County goes 6.2 hours a year without power, the 66th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates McLauchin?
It is operated by North Carolina El Member Corp (EIA sector: Electric Utility), and it feeds balancing authority CPLE.
When did McLauchin open?
Its oldest generator still running came online in 2024.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.