Solar power plant · Nash, NC

Red Bud Solar Plant

Red Bud Solar Plant is a 80 MW solar power plant in Nash County, North Carolina, operated by Duke Energy Carolinas, LLC. Its oldest generator still running came online in 2025. In 2025 it generated 28 GWh, about what 2,200 average North Carolina homes use in a year.

Capacity80 MWNameplate, September 2026
Generated28 GWhIn 2025
Capacity factor–Not a full year of data
Generators1Oldest from 2025

Red Bud Solar Plant in context

Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 11th largest, about 1.1% of the state's 7.1 GW of solar capacity.

Nash County has 32 power plants of 1 MW or more with 379 MW in all; Red Bud Solar Plant is 21% of that and the largest of 32 solar plants there.

The average electricity customer in Nash County goes 6.1 hours a year without power, the 70th most of 100 counties in North Carolina. The county's page has the full outage record.

Seasons

Month by month, 2025

Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec

Where it is

Red Bud Solar Plant (outlined) and other plants in Nash County, shaded. 36.077, -78.022.

Plant facts

Operator
Duke Energy Carolinas, LLC
Sector
Electric Utility
Grid operator
DUK
County
Nash County, NC
EIA plant ID
69172
Where North Carolina's power comes from → North Carolina power outages →

Equipment

Generators in service

GeneratorTechnologyCapacityOnlinePlanned retirement
68055 Solar Photovoltaic 80 MW 2025 –

Questions

Red Bud Solar Plant, answered

How much power does Red Bud Solar Plant produce?

Red Bud Solar Plant has 80 MW of capacity from one generator. In 2025 it generated 28 GWh.

How many homes does Red Bud Solar Plant power?

Its 2025 output of 28 GWh equals the yearly electricity use of about 2,200 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.

Where is Red Bud Solar Plant?

Red Bud Solar Plant is in Nash County, North Carolina, at about 36.077°, -78.022°. It is one of 32 power plants of 1 MW or more in the county. The average electricity customer in Nash County goes 6.1 hours a year without power, the 70th most of 100 counties in North Carolina. The county's page has the full outage record.

Who operates Red Bud Solar Plant?

It is operated by Duke Energy Carolinas, LLC (EIA sector: Electric Utility), and it feeds Duke Energy Carolinas.

When did Red Bud Solar Plant open?

Its oldest generator still running came online in 2025.

Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.