Solar power plant · Yadkin, NC
Two Hearted Solar
Two Hearted Solar is a 22 MW solar power plant in Yadkin County, North Carolina, operated by Two Hearted Solar, LLC. Its oldest generator still running came online in 2026.
Two Hearted Solar in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 58th largest, about 0.3% of the state's 7.1 GW of solar capacity.
Yadkin County has 8 power plants of 1 MW or more with 103 MW in all; Two Hearted Solar is 21% of that and the 2nd largest of 8 solar plants there.
The average electricity customer in Yadkin County goes 6.1 hours a year without power, the 69th most of 100 counties in North Carolina. The county's page has the full outage record.
Where it is
Two Hearted Solar (outlined) and other plants in Yadkin County, shaded. 36.235, -80.563.
Plant facts
- Operator
- Two Hearted Solar, LLC
- Sector
- IPP Non-CHP
- Grid operator
- DUK
- County
- Yadkin County, NC
- EIA plant ID
- 67969
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PGR28 | Solar Photovoltaic | 22 MW | 2026 | – |
Nearby
Other plants in Yadkin County
Questions
Two Hearted Solar, answered
How much power does Two Hearted Solar produce?
Two Hearted Solar has 22 MW of capacity from one generator. No full year of generation is reported yet.
Where is Two Hearted Solar?
Two Hearted Solar is in Yadkin County, North Carolina, at about 36.235°, -80.563°. It is one of 8 power plants of 1 MW or more in the county. The average electricity customer in Yadkin County goes 6.1 hours a year without power, the 69th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Two Hearted Solar?
It is operated by Two Hearted Solar, LLC (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.
When did Two Hearted Solar open?
Its oldest generator still running came online in 2026.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2025–2025). Methodology.