Solar power plant · Cleveland, NC
Broad River Solar, LLC
Broad River Solar, LLC is a 50 MW solar power plant in Cleveland County, North Carolina, operated by Deriva Energy. Its oldest generator still running came online in 2021. In 2025 it generated 106 GWh, about what 8,500 average North Carolina homes use in a year.
Broad River Solar, LLC in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 40th largest, about 0.7% of the state's 7.1 GW of solar capacity.
Cleveland County has 30 power plants of 1 MW or more with 3.0 GW in all; Broad River Solar, LLC is 2% of that and the largest of 25 solar plants there.
Its capacity factor of 24% in 2025 is higher than the 20% typical for solar plants across the US.
The average electricity customer in Cleveland County goes 10 hours a year without power, the 45th most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Broad River Solar, LLC (outlined) and other plants in Cleveland County, shaded. 35.188, -81.751.
Plant facts
- Operator
- Deriva Energy
- Sector
- IPP Non-CHP
- Grid operator
- DUK
- County
- Cleveland County, NC
- EIA plant ID
- 62822
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| GEN1 | Solar Photovoltaic | 50 MW | 2021 | – |
Nearby
Other plants in Cleveland County
Questions
Broad River Solar, LLC, answered
How much power does Broad River Solar, LLC produce?
Broad River Solar, LLC has 50 MW of capacity from one generator. In 2025 it generated 106 GWh, 24% of the most it could have made running flat out all year (its capacity factor).
How many homes does Broad River Solar, LLC power?
Its 2025 output of 106 GWh equals the yearly electricity use of about 8,500 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Broad River Solar, LLC?
Broad River Solar, LLC is in Cleveland County, North Carolina, at about 35.188°, -81.751°. It is one of 30 power plants of 1 MW or more in the county. The average electricity customer in Cleveland County goes 10 hours a year without power, the 45th most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Broad River Solar, LLC?
It is operated by Deriva Energy (EIA sector: IPP Non-CHP), and it feeds Duke Energy Carolinas.
When did Broad River Solar, LLC open?
Its oldest generator still running came online in 2021.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2022–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.