Solar power plant · Perquimans, NC
Two Mile Desert Project
Two Mile Desert Project is a 16 MW solar power plant in Perquimans County, North Carolina, operated by Citizens Enterprises Corporation. Its oldest generator still running came online in 2019. In 2025 it generated 25 GWh, about what 2,000 average North Carolina homes use in a year.
Two Mile Desert Project in context
Among the 756 solar plants in North Carolina in the EIA's inventory, it is the 81st largest, about 0.2% of the state's 7.1 GW of solar capacity.
Perquimans County has 9 power plants of 1 MW or more with 259 MW in all; Two Mile Desert Project is 6% of that and the largest of 8 solar plants there.
Its capacity factor of 17% in 2025 is lower than the 20% typical for solar plants across the US.
The average electricity customer in Perquimans County goes 3.1 hours a year without power, the 93rd most of 100 counties in North Carolina. The county's page has the full outage record.
Output
Generation, year by year
Net generation in GWh, as reported to the EIA on Form 923.
Seasons
Month by month, 2025
Where it is
Two Mile Desert Project (outlined) and other plants in Perquimans County, shaded. 36.220, -76.460.
Plant facts
- Operator
- Citizens Enterprises Corporation
- Sector
- IPP Non-CHP
- Grid operator
- PJM
- County
- Perquimans County, NC
- EIA plant ID
- 60510
Equipment
Generators in service
| Generator | Technology | Capacity | Online | Planned retirement |
|---|---|---|---|---|
| PV1 | Solar Photovoltaic | 16 MW | 2019 | – |
Nearby
Other plants in Perquimans County
Questions
Two Mile Desert Project, answered
How much power does Two Mile Desert Project produce?
Two Mile Desert Project has 16 MW of capacity from one generator. In 2025 it generated 25 GWh, 17% of the most it could have made running flat out all year (its capacity factor).
How many homes does Two Mile Desert Project power?
Its 2025 output of 25 GWh equals the yearly electricity use of about 2,000 average North Carolina homes (1,044 kilowatt-hours a month each). Power from a plant goes into the shared grid, so it does not serve any particular homes by itself.
Where is Two Mile Desert Project?
Two Mile Desert Project is in Perquimans County, North Carolina, at about 36.220°, -76.460°. It is one of 9 power plants of 1 MW or more in the county. The average electricity customer in Perquimans County goes 3.1 hours a year without power, the 93rd most of 100 counties in North Carolina. The county's page has the full outage record.
Who operates Two Mile Desert Project?
It is operated by Citizens Enterprises Corporation (EIA sector: IPP Non-CHP), and it feeds PJM Interconnection.
When did Two Mile Desert Project open?
Its oldest generator still running came online in 2019.
Sources: U.S. Energy Information Administration, Form EIA-860M generator inventory (September 2026) and Form EIA-923 generation (2019–2025). Homes equivalent uses the average North Carolina home's 1,044 kWh a month in 2025. Methodology.